Small Wheel Phase 1.9 Nigel Nation 1 November 2006.

Slides:



Advertisements
Similar presentations
CAUSE & EFFECT DIAGRAM (Fishbone or Ishikawa Diagram) Dr
Advertisements

Winter shutdown 08/09 Summary of HV interventions Barrel Muon Workshop, 02/09 Jesús Puerta-Pelayo, CIEMAT 17-February-2009.
Crane Modeling using Excel Please make sure your computer can play sounds. You should currently hear a sound instructing you what to do next.
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
TCP Training Traffic Control Person Training. TCP Training Agenda !Course Introduction !Complying with Regulations and Standards !Using Traffic Control.
 Divide your paper horizontally at one third from the top and mark two vanishing points at each end of the line.
Assembly Hall in Hybrid-A’ and ILD 2014/9/6 Yasuhiro Sugimoto 1.
Phase Difference = Phase Difference = 0.05.
1 13 Oct 2006 Small Wheel Phase 1.9 Logistics C. Weaverdyck N. Nation 13 October 2006.
Large Wheel Installation Helped with initial installation in 2005 Installed EML and EMS chambers in sector frame. Last chamber installed 31 October 2006.
Rectangular framed structures
TP4-ENERSOL-TD/PV double function
7/28/03P. Kroon AEROGEL Assembly of Cells into 80-cell Array: –8 cells wide by 10 cells high mm high (Y) by 2077 mm wide (Z) by about 335 mm deep.
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 14 March March 2005 LAT High Bay Operations Supporting Test Events LAT.
DH in Hybrid-A and ILD 2014/9/5 Yasuhiro Sugimoto 1.
Ground Safety Review – Phase II September 8-10, 2008 Phil Mott
1 Crane Safety on Construction Sites Supervision and Management of Crane Operations Rigging Operations Presented by the Construction Institute of ASCE.
TGC Big wheel Sector assembly plan Tatsuo Kawamoto ATLAS workshop 2005.
Royal Arc Training Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2011.
Starting screen for Google Sketchup Sketchup is used to make 3 dimensional objects 3 axis – Green is x axis Red is y axis Blue is z axis.
Data Entry Screen Slides Synchro Season November 2014.
Notes After TIG 17/7/08 HF+ Move out of garage: Aug 15* Platform+table+collars+racks+BP support (jack up for platform) = 3 days Controls for motors = 1.
EHN1 Extension overhead crane coverage Keith Kershaw CERN EN-HE.
1 Discussion for basic options — engineering video conference July 12, 2006 Outline Water pool — advantages — issues, problems, engineering options Aquarium.
ATLAS Muon System WBS 3.5 DoE/NSF M&O Evaluation Group Review BNL 19-Jan-06 Frank Taylor MIT V1.3.
© 2010 MAiSPACE, Inc. ALUR Dividing Wall An Attractive, Cost Effective Sidewall for ALUR Glass Walls and MAiSPACE Floor to Ceiling Panels.
EHN1 North Wall Dismantling Schedule Bastien Rae.
GLAST LAT ProjectMarch 08, 2004 Page 1 ACD Installation, Post LAT CDR Response to GLAST LAT CDR RFA Number 13: MGSE Detailed Dimension Study [for ACD Installation]
What is Volume?. What is Volume? Volume is the amount of space inside an object.
TAS at IP5 Present situation and plans François BUTIN TS/LEA.
GLAST LAT Project Page 1 ACD Installation, Post LAT CDR Response to GLAST LAT CDR RFA Number 13: MGSE Detailed Dimension Study [for ACD Installation] –A)
SLHC Engineering Upgrade FCAL Remove-Install step by step procedure. Mircea Cadabeschi-University of Toronto March 01,
The vertical milling machine
Chapter 24 Chimneys and Fireplaces Copyright Goodheart-Willcox Co., Inc. May not be posted to a publicly accessible website. Explain how masonry chimneys.
M M M M 5. Not Listed
Glenn Lopez P0Dule Production Planning. Glenn Lopez Overview Eventually want a detailed procedure for P0Dule production Workspace layout is efficient.
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
GIF ++ ambient condition The Prep. area outside Tent and its gradient CSC area Geneva meteo station Ian Crotty6 Oct 2015.
ZDC inside TAN – Crane position over TAN slot – lifting beam lowered to ZDC ZDC Sarco TAN.
Project Office Activities R. Vuillermet 08/09/2015R. Vuillermet PH-ADO-PO1.
By: Julienne Faucher. Step 1 Go to the start menu. Open “Accessories” Open paint Make a box.

Do Now Define Mass What units do we use to describe mass? What tool do we use to measure mass? What steps do we take to use that tool?
Soil Properties determination
ColUSM #63 18 th September, 2015 D. Ramos, C. Mucher, L. Gentini, H. Prin, Q. Deliege, A. Bastard, J. Hrivnak.
6-Mar-2016 Dan Wenman | FC Installation 1 APA installation and integration at CERN Shipment of APAs APA handling Acceptance testing Tools needed.
Sébastien MICHALMarch Sébastien MICHALMarch 2009 EES 1 GROOVE EES 1 laid on table to be milled EES 1 laid on table to be milled –Move horizontally.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Rosava Engineering Group Gantry Crane Web- Mobile , +91.
Introduction To Engineering Multi-view Drawings - 3
Main hazards and escape routes in TCC8/ECN3
Safety in the Neutrino Platform Hall
E450AJ BOOMLIFT for DECAM Tasks
SX1 manipulation VERSION 1 Version
Main hazards and escape routes in TCC8/ECN3
Lift up antenna at least 40ft height above the ground.
TIDVG-4 TIDVG-4 Dump assembly, welding and installation Process sector BA1 February 2017 J. Humbert, (EN/MME) 06/02/2017 J. Humbert, EN-MME.
Initial BIS installation
Material Handling Material Handling –
Course Contents Culverts Bridges Buildings 20 November 2018.
ريكاوري (بازگشت به حالت اوليه)
Coordinate system for the GIF as defined for CMS RPCs
Toledo I-280 Crane Accident
Repeating Behaviors.

Toledo I-280 Crane Accident
Ferrol Shipyard Total area : m² Dock equipment : m.
For More Details:


Presentation transcript:

Small Wheel Phase 1.9 Nigel Nation 1 November 2006

Use of Space(s) Jura Side Barracks 8 EIS.1Cxx chambers are on dollies 4 are de-boxed 4 have been photgrametried and calibrated 8 need phase 1.9 Saleve Large Sector 8 EIS.2Cxx chambers are on dollies Need to access the use of verticalizer and height of boxes Can NOT do EIS.1xxx, EIL.1xxx nor EIL.2xxx because of box construction Possibility of gantry crane in EIL.4xxx area (but concrete blocks have to be moved)

Chamber De-boxing Use of Harvard lifting tool to remove chamber from box Detailed procedure for how to do this Train people to use the tool

Phase 1.9

Gas system for EI Chambers P LM 1 ML 2

Chamber on Rotator Use of rotator and cart. Detailed procedure for connecting rotator to chamber Chamber can now be photogrametried

Photogrametry Matt, Dan and Christoph photogrametried 4 EIS.1Cxx chambers Matt calibrated these One mare cart available enabling 2 chambers to be photogrametried