Mark Reichanadter LCLS FAC April 20-21, 2006 Meeting of the LCLS Facilities Advisory Committee LCLS Project Management M.

Slides:



Advertisements
Similar presentations
US CMS DOE/NSF Review: May 8-10, US CMS Cost & Schedule Mark Reichanadter US CMS Project Engineer DOE/NSF Review 8 May 2001.
Advertisements

Cost, Schedule & Funding Closeout Jan Joint DOE/NSF CD2/3a Review 1 DOE/NSF Review of the Dark Energy Survey (DES) Project SC 6/7 Cost, Schedule.
M. Reichanadter, SLACLCLS FAC Meeting - April 29, 2004 LCLS Organization & Execution M. Reichanadter LCLS FAC Meeting April 29, 2004 LCLS.
Richard M. Boyce FAC Review – Accelerator Installation October 29-31, Installation – Accelerator Systems Installation Planning.
DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science OECM Limited-External Independent.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
FAC, 4/20/06 D. Schultz 1 e-Beams System Update Linac System Preparing for downtime installation. Injector System Installation has started. Undulator System.
John N. Galayda LCLS FAC 20 April Linac Coherent Light Source Overview and Charge Facility Advisory Committee John.
David Saenz Facility Advisory October 30, 2007 CONVENTIONAL FACILITES MANAGEMENT.
Mark Reichanadter LCLS FAC October 29-31, 2007 Report to the LCLS Facilities Advisory Committee Project Management Project.
Michael Scharfenstein FAC October LCLS Environment, Safety & Health Michael Scharfenstein ES&H Coordinator.
FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production MMF Operations David Schultz.
Accelerator Systems Division FACET Project Management John Seeman for the FACET Study Group PPA Directorate Stanford Linear Accelerator Center DOE FACET.
John Arthur Photon October 29, Photon Systems Update FAC recommendations Current status New plan for Photon Systems.
Jess Albino Facility Advisory October 29, 2007 FACILITY ADVISORY COMMITTEE PLENARY CONVENTIONAL FACILITIES UPDATE October.
M. Reichanadter LCLS Project June 2008 FAC Meeting Report to the LCLS Facilities Advisory Committee Project Management.
John N. Galayda LCLS FAC October Linac Coherent Light Source Overview and Charge Facility Advisory Committee.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
John N. Galayda LCLS Facility Advisory 29 October 2007 Linac Coherent Light Source Overview 29 October 2007  Project.
Bob Law FAC Oct 24, Sector 20 Project Overview Sector 20 Site Plan Description Organizational Chart Schedule Cost.
Mark Reichanadter LCLS FAC April 16-17, 2007 Report to the LCLS Facilities Advisory Committee LCLS Project Management M.
David Saenz FAC November 11, 2008 SLAC National Accelerator Laboratory 1 Far Experimental Hutches David Saenz Project Manager.
Mark Reichanadter LCLS FAC Oct12-13, 2004 Meeting of the LCLS Facilities Advisory Committee LCLS Organization & Execution.
LCLS Undulator Systems TDR Charge Linac Coherent Light Source Stanford Linear Accelerator Center Technical Review, March 3, 2004.
M. Scharfenstein - ES&H Coordinator 8 June 2009
David McGiven FAC: Construction April 2006 Facility Advisory Committee (FAC) Construction Procurement David.
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Project Performance & Risk Management Aesook Byon, Deputy Project Director NSLS-II PAC Meeting February 8-9, 2011.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck Deputy Director (Project Management)
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck NLSL II Deputy Director (Project Management)
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Status Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Accelerator.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Status & Charge to ASAC Steve Dierker Associate Laboratory Director for Light Sources, NSLS-II Project Director.
Mark Reichanadter LCLS FAC Apr7-8, 2005 LCLS Facilities Advisory Committee LCLS Organization & Executive Status M. Reichanadter.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Update Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Conventional Facilities.
W.J. Foyt LUSI DOE Review July 23, 2007 Project Management 1 Project Management W. J. Foyt Project Scope Timeline Cost Estimate.
M. Reichanadter LCLS Project November 2008 FAC Meeting Slac National Accelerator Laboratory Report to the LCLS.
Anthony Indelicato DOE-Princeton Site Office May 2012 Construction Progress Review for the NSTX Upgrade Project Construction Progress Review for the NSTX.
Mark Reichanadter LCLS FAC October 12-13, 2006 Report to the LCLS Facilities Advisory Committee LCLS Project Management.
David Saenz Readiness for Oct 12, 2006 # Meeting of the LCLS Facilities Advisory Committee LCLS Conventional Facilities.
DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science Office of Science Review of the LCLS.
Mark Reichanadter LCLS October 9-11, 2007 LCLS BCR Overview and EIR LOIs Project Progress / Status Revised Project Baseline.
1 BROOKHAVEN SCIENCE ASSOCIATES Project Performance & Risk Management Aesook Byon, Deputy Project Director NSLS-II PAC Meeting March 29-30, 2012.
Power Upgrade Project SNS September 21-22, TBM Cost Estimate Cost Estimate Schedule Approach Tom Mann October 27, 2005.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier NSLS-II Conventional Facilities Schedule Review December 13, 2006.
Anthony Indelicato DOE-Princeton Site Office February 2014 Construction Progress Review for the NSTX Upgrade Project Construction Progress Review for the.
Cost and Schedule Breakout Session Paul Weinman Pacific Northwest National Laboratory.
Anthony Indelicato DOE-Princeton Site Office December 2012 Construction Progress Review for the NSTX Upgrade Project Construction Progress Review for the.
Cost and Schedule Paul Weinman Pacific Northwest National Laboratory.
Project Management W. J. Foyt
Meeting of the LCLS Facilities Advisory Committee
Meeting of the LCLS Facilities Advisory Committee
CONVENTIONAL FACILITIES STATUS
DOE Mini-Review of the LCLS Project
LCLS Project Management
Details supporting the increase
DOE Review of the LCLS Project
DOE Review of the LCLS Project
CONVENTIONAL FACILITIES
Linac Coherent Light Source (LCLS)
DOE Review of the LCLS Project
Installation Status & Operational Readiness Process
DOE Review of the LCLS Project
Department Of Energy Review Linac Coherent Light Source Project
Conventional Facilities
DOE Mini-Review of the LCLS Project
DOE Review of the LCLS Project
LCLS e- Beams System Overview
DOE Status Meeting of the LCLS Project
Presentation transcript:

Mark Reichanadter LCLS FAC April 20-21, 2006 Meeting of the LCLS Facilities Advisory Committee LCLS Project Management M. Reichanadter / SLAC

Mark Reichanadter LCLS FAC April 20-21, Outline Status of the LCLS Progress in the past six months Project Management Cost and Schedule Performance Contingency Allocation Organization and Integration Plans for the next six months Near-term Issues

Mark Reichanadter LCLS FAC April 20-21, 2006 LCLS Project Status Milestones Turner Awarded LCLS CM/GC Contract Oct17, ’05 Jacobs 100% design complete Jan17, ’06 CD-3B Approve Start of Construction – Mar28, ’06 DOE “Lehman” Review Feb 7-9, ’06 Cost Primary cost concern is the CF bids (delay CLOC bids) Cost estimate is ~agreed to by Jacobs & Turner Schedule Maintaining good schedule progress (adequate float) Critical path still runs through Conventional Facilities Management & Integration Preparation for construction on track (ISMS good) Procurements working reasonably well. Difficulty resolving CM/GC procedures and contract issues. Technical Specifications continue to mature. Good preparation (SLAC & LCLS) on FFTB and FY06 shutdowns

Mark Reichanadter LCLS FAC April 20-21, Project Performance (TEC) Planned work and obligations fall within the DOE funding profile. The goal of the PO is to manage LCLS work activities to maximize the effectiveness of available funds. Phase-fund construction contracts.

Mark Reichanadter LCLS FAC April 20-21, LCLS Feb06 CPR 24 months of reporting earned-value TPC ~22% Complete Contingency on ETC~28%

Mark Reichanadter LCLS FAC April 20-21, Recent Cost and Schedule Performance (TEC) Injector System:SPI = 0.84 – Laser delay (Thales), streak camera and RF gun fab. Linac System: SPI = 0.88, CPI = 1.25 – Inj- Lin controls hardware. Strong effort underway to recover schedule. SLAC-built X-band klystron which is under test. Undulator System: SPI = 0.88 – CMM and test stand deliveries. Airfreight to save schedule.

Mark Reichanadter LCLS FAC April 20-21, Contingency Performance Processed ~$2.4M return to contingency in Jan/Feb. Maintain ~27% contingency on WR until 1 st group of CF bids are in (May06).

Mark Reichanadter LCLS FAC April 20-21, Contingency Allocation (May05 – Present)

Mark Reichanadter LCLS FAC April 20-21, LCLS Project Schedule LCLS Critical Paths; Constr Start CLOC B.O. 111d (5-1/2 months) schedule float to CD-4 Constr Start Undulator B.O. Undulator Install ‘First Light” 213d (10-1/2 months) commissioning float to CD-4 Key schedule issues; Awarding construction contracts on time Technical component readiness for installation System integration needs good coordination Preparation for SLAC shutdowns also to be well-planned Apr06 FFTB Shutdown underway (~ 3-1/2 mos. prep for Turner) Aug06 SLAC Shutdown in planning (~4 mos. Install Injector + some Linac) Jul07 SLAC Shutdown in planning (~3 mos. Install Linac)

Mark Reichanadter LCLS FAC April 20-21, L3 Milestone Performance LCLS showing OK milestone performance over past six months. Coming up: -Drive Laser -Und SUT -Und 1 st Art -MMF -Shutdown

Mark Reichanadter LCLS FAC April 20-21, Awarded Contracts ~38% of LCLS contracts awarded. By end of FY06, 80% of contracts will be awarded. At that point, cost risk is down. Remaining contracts have some specialty components but most are commodities. (vacuum, cabling, etc.) Cost Risks CF subcontracts Schedule performance System Integration

Mark Reichanadter LCLS FAC April 20-21, Technical Specifications Status LCLS Specs PRD’s 37% Jul05 67% Oct05 85% Apr06 Nice improvement ESD’s particularly IN, LN, and UN need more effort. Recent physics support added to Photon System

Mark Reichanadter LCLS FAC April 20-21, LCLS Project Organization (Mar06) Feb06 Lehman committee recommended strengthening Project Office APD – Engr APD – Civil Procurement Continued strengthening of Conv Facilities LCLS PMOG functioning

Mark Reichanadter LCLS FAC April 20-21, Earned-Value Management Certification Status 4 major CAR’s 002 Work Authorization Documents 005 Indirect Cost Procedure 006 Indirect Rates 007 Change Control 4 minor CAR’s 001 Variance Analysis Reports 003 Scheduling Process & Linkage 004 Direct Costs not recorded with Budgets 008 Performance Measurement Baseline A Corrective Action Plan is in draft. Most require minor clarifications/additions to documentation Project plans a bottoms-up Estimate-To- Complete by Oct06. Roadmap to LCLS EVM Certification Sep05 – LCLS conducted an assessment of EVMS. Positive comments. Good recommendations. Mar1-2, ‘06 – LCLS to conducted an EVMS review using an external review team. Mar27-31 ‘06 – OECM EVM certification through DCMA.

Mark Reichanadter LCLS FAC April 20-21, Near-Term Issues Award construction sub-contracts and start construction SLAC to complete FFTB removal and RY demo work Finalize and bid out CLOC later to manage cost risk. SLAC-LCLS Procurement maintain change control with Turner Safety, safety, safety Lots of new hazards, construction, tunneling, demolition, installation, lasers, contractor coordination and shutdown activities Emphasize on ISM, UTR Training, strengthen line management System Engineering and Integration Strengthen Project Office staffing Maintain sensitivity to staffing shortages Document decisions via Technical Spec’s and Design Reviews Actively manage risks via the Risk Registry Continue performance on cost, schedule and milestones

Mark Reichanadter LCLS FAC April 20-21, Summary Good performance thus far (22% comp) SLAC is providing key resources to the project Overall cost and schedule performance is OK A/E ~complete, CM/GC ready for construction FFTB and shutdown planning underway Major technical deliverables well underway Laser, Undulators, etc. LCLS ISMS is a “pre-condition” for all work.