9/11/2007JC Wang1 Track Resolution Scale, assume equal  meas for different planes. HP3 HP4 All 6 measurements. Without leftmost one. Without rightmost.

Slides:



Advertisements
Similar presentations
Test Setup for PHOBOS Hybrid/Module Testing at MIT Pradeep Sarin 31 July 98.
Advertisements

6 Mar 2002Readout electronics1 Back to the drawing board Paul Dauncey Imperial College Outline: Real system New VFE chip A simple system Some questions.
Electromagnetic shower in the AHCAL selection criteria data / MonteCarlo comparison of: handling linearity shower shapes CALICE collaboration meeting may.
November 3rd, 2006 CALICE-UK, Manchester - A.-M. Magnan - 1 Noise studies DESY + CERN TB overview Anne-Marie Magnan Imperial College London.
Adding electronic noise and pedestals to the CALICE simulation LCWS 19 – 23 rd April Catherine Fry (working with D Bowerman) Imperial College London.
Photodetector Timing Resolution Burle Micro-Channel Plate Photo Multiplier Tubes (MCP-PMTs) H. Wells Wulsin SLAC Group B Winter 2005.
March, 11, 2006 LCWS06, Bangalore, India Very Forward Calorimeters readout and machine interface Wojciech Wierba Institute of Nuclear Physics Polish Academy.
Preshower 15/03/2005 P.Kokkas Preshower September Run Data Analysis P. Kokkas.
FNAL TB09 Plots Alessandra Borgia Syracuse Unviersity Marina Artuso, Jianchun Wang, Ray Mountain January 20, 2010.
1 Scintillating Fibre Cosmic Ray Test Results Malcolm Ellis Imperial College London Monday 29 th March 2004.
29 June 2004Paul Dauncey1 ECAL Readout Tests Paul Dauncey For the CALICE-UK electronics group A. Baird, D. Bowerman, P. Dauncey, C. Fry, R. Halsall, M.
Checking the Acd hardware veto setting The hardware veto is generated in the front-end electronics Discriminator with coarse and fine settings Both are.
Offline Code for Next Beam Test Jianchun Wang 08/06/01.
1Calice-UK Cambridge 9/9/05D.R. Ward David Ward Compare Feb’05 DESY data with Geant4 and Geant3 Monte Carlos. Work in progress – no definitive conclusions.
MC Study of B°  S Jianchun Wang Syracuse University BTeV meeting 06/27/01.
Comparing ZS to VR David Stuart, UC Santa Barbara June 19, 2007.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Oct, 24, 2007.
Status on Testbeam Analysis Jianchun Wang Syracuse University VELO meeting, August 28, 2007.
The first testing of the CERC and PCB Version II with cosmic rays Catherine Fry Imperial College London CALICE Meeting, CERN 28 th – 29 th June 2004 Prototype.
GLAST LAT Project Software vrvs meeting X. Chen 1 GLAST LAT Project Software vrvs meeting X. Chen 1 Analyses of Muon Calibration Data Xin Chen.
Slide 1 sCVD Diamond for the CMS Pixel Detector May 2004 R.Stone, Rutgers J.Doroshenko, L.Perera, S.Schnetzer RD42 Collaboration Meeting Overview.
L1 Trigger for ACDC Jianchun (JC) Wang Syracuse University VELO ACDC Software Meeting 01/20/2006.
Jianchun (JC) Wang, 08/21/99 RICH Electronics and DAQ Chip Carrier Short Cable Transition Board Long Cable Data Board Crate J.C.Wang Syracuse University.
Anne-Marie Magnan Imperial College London CALICE Si-W EM calorimeter Preliminary Results of the testbeams st part On behalf of the CALICE Collaboration.
VELO ADC vs Charge Calibration Jianchun Wang April 16, 2008 This is an update to the presentation at April 11 st VELO Group Meeting. A new scan data of.
Signal Processing in PHAT (P. Decowski, A. Olszewski, H. Pernegger, P. Sarin) Outline –Requirement for the signal calculation –Layout of the measurement.
FPIX0 Electronic Test Marina Artuso Paul Gelling Jianchun Wang  The system works fine with charge injection calibration  Gain curve, threshold, and noise.
Responsibility on Next Beam Test Jianchun Wang Syracuse University BTeV meeting 06/27/01.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
STAR HFT STAR Collaboration Meeting - LBNL IST Software Status Yaping Wang (University of Illinois at Chicago) Outline Offline software infrastructure.
Michele Faucci Giannelli TILC09, Tsukuba, 18 April 2009 SiW Electromagnetic Calorimeter Testbeam results.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
DE/dx measurement with Phobos Si-pad detectors - very first impressions (H.P Oct )
ECFA Sep 2004Paul Dauncey - CALICE Readout1 CALICE ECAL Readout Status Paul Dauncey For the CALICE-UK electronics group A. Baird, D. Bowerman, P.
HallA/SBS – Front Tracker PARAMETERDESIGN VALUE Microstrip Silicon Detector Number of tiles/plane and size2 Number of planes2 Size of the single
QGP France sept 2010Sanjoy Pal Performances of the tracking Chambers of the ALICE MUON Spectrometer 1.
Pixel Offline Study Jianchun Wang Syracuse University 11/05/04, Pixel testbeam meeting.
Charge Sharing & Hit Identification & Cluster Information.
Development of Multi-Pixel Photon Counters(MPPC) Makoto Taguchi Kyoto University.
Forward Pixel Beamtest Analysis Carsten Rott Purdue University Januar 24, 2001.
Florida Institute of Technology, Melbourne, FL
Offline raw data format of SVD2.0 The offline raw data format of SVD2.0 is almost same as that of SVD1.0 which was developed by Krakow people. The big.
The experimental setup of Test Beam HE EE ES BEAM  A slice of the CMS calorimter was tested during summer of 2007 at the H2 test beam area at CERN with.
Noise and Cosmics in the DHCAL José Repond Argonne National Laboratory CALICE Collaboration Meeting University Hassan II Casablanca, Morocco September.
LHCb VELO Upgrade Strip Chip Option: Data Processing Algorithms Giulio Forcolin, Abdul Afandi, Chris Parkes, Tomasz Szumlak* * AGH-Krakow Part I: LCMS.
STAR Collaboration Meeting, BNL – march 2003 Alexandre A. P. Suaide Wayne State University Slide 1 EMC Update Update on EMC –Hardware installed and current.
STAR Analysis Meeting, BNL – oct 2002 Alexandre A. P. Suaide Wayne State University Slide 1 EMC update Status of EMC analysis –Calibration –Transverse.
Quality control for large volume production GEM detectors Christopher Armaingaud On behalf of the collaboration GEMs for CMS.
FIRST RESULTS OF THE SILICON STRIP DETECTOR at STAR Jörg Reinnarth, Jonathan Bouchet, Lilian Martin, Jerome Baudot and the SSD teams in Nantes and Strasbourg.
Analysis for QA (temporary) Hideyuki Sakamoto 1 st October 2007 MICE Tracker Phone Meeting.
David Silvermyr Lund University for the PHENIX Collaboration Early global event results using the PHENIX Pad Chambers at RHIC.
ZDC Status A.Mestvirishvili Iowa. Quite while we had some problems with ZDC, QIE saturations, Reflections, Noise etc. To improve the situation several.
CM correction algorithm. Observations: Looking at the data for one analog link, a large fraction of the 32 strips are affected by the large signal deposit.
A Brand new neutrino detector 「 SciBar 」 (2) Y. Takubo (Osaka) - Readout Electronics - Introduction Readout electronics Cosmic ray trigger modules Conclusion.
The BTeV Pixel Detector and Trigger System Simon Kwan Fermilab P.O. Box 500, Batavia, IL 60510, USA BEACH2002, June 29, 2002 Vancouver, Canada.
Low-energy Sim/Reco Capability Xin Qian (BNL) Tingjun Yang (FNAL) 1.
BMN Run owerview D.Vishnevskiy Mar23,2015. Run summary information NameFromToRuns Run1Feb 22Feb Run2Mar 5Mar Run3Mar 11Mar
28/11/02Guy Dewhirst1 Ultra Light Weights Method Guy Dewhirst Imperial College London.
3/06/06 CALOR 06Alexandre Zabi - Imperial College1 CMS ECAL Performance: Test Beam Results Alexandre Zabi on behalf of the CMS ECAL Group CMS ECAL.
Analysis of LumiCal data from the 2010 testbeam
Ivan Perić University of Heidelberg Germany
The GOOFIE detector as a Ternary Mixture Monitor
Vertex 2005 November 7-11, 2005 Chuzenji Lake, Nikko, Japan
Large CMS GEM with APV & SRS electronics
Status of the TOF Detector
Vertex, Track Reconstruction & Luminosity Monitoring at LHCb
Beam Test Results for the CMS Forward Pixel Detector
The CMS Tracking Readout and Front End Driver Testing
The Effect of Highly Ionising Particles on the APV25 Readout Chip
The Ohio State University USCMS EMU Meeting, FNAL, Oct. 29, 2004
Presentation transcript:

9/11/2007JC Wang1 Track Resolution Scale, assume equal  meas for different planes. HP3 HP4 All 6 measurements. Without leftmost one. Without rightmost one.

9/11/2007JC Wang2 Recovery of JC Effect M28R Electronic Channel Raw ADC Readout Electronic Channel Events: 231, 232, 233 Chip 5  Pedestal shift in the whole chip  0.12 Q(in unit of MIPs).  Normal CM suppression can not handle large shift. Hottest events removed from running pedestal calculation. Extra correction to recover hits in the rest of the chip. ADC – Pedestal – CM noise Signal after Extra Correction ~ 50 ADC

9/11/2007JC Wang3 Pedestal & CMS Noise Before After