Four Points Engineering and Design Project 99.04: Heat Pump Design for Whalen Co. FPED Team Members: Ricardo Blackett, Andy Parke, Scott Quirico, Brian.

Slides:



Advertisements
Similar presentations
Packaged Terminal Air Conditioners
Advertisements

Trane Voyager™ rooftop units
Fan Coil Unit Product Line-up. FCU Home Application Show.
1 Trade Skills HVACR116 Fiberglass Duct Board and Insulation Material.
Heating, Ventilating, and Air-Conditioning
TYPES OF MECHANICAL SYSTEMS
General System Maintenance BUS 4 COMPONENT FLOW.PPT
F our P oints E ngineering and D esign Project 99.04: Heat Pump Design for Whalen Co. FPED Team Members: Ricardo Blackett, Andy Parke, Scott Quirico, Brian.
Heat Recovery for Commercial Buildings
UNICO INVERTER DC. UNICO INVERTER DC UNICO INVERTER DC The first INVERTER technology based heat pump without external unit on the market The new product.
ASHRAE Chapter Meeting Acoustics in HVAC Design
Air Conditioning (HVAC) Course Presentation
Variable Frequency Drives VFD Basics
Wine Cellar Split System Basics. Definitions Split System – A cooling unit that “splits” the cooling coil and the condenser apart into two remote pieces.
Using Benchmarking to Identify Energy Efficiency Opportunity in Cleanrooms; The Labs 21 Approach William Tschudi and Peter Rumsey June 29, 2004
Artel Climabox System Artel’s Climabox is a technical innovation because: n it is able to make the most of the two principal natural resources: gas and.
HVAC Systems Overview HVAC Overview - # 1 Tom Lawrence
Team members Duc Le Ron Pahle Thanh Nguyen Khoa Tran Sponsor Edwards Vacuum Ltd. Advisor Dr. Dave Turcic.
1 Composite Generator Enclosure PROJECT New Castle Design Associates.
1 Composite Generator Enclosure PROJECT New Castle Design Associates.
1 Composite Generator Enclosure PROJECT New Castle Design Associates.
ME Project: Air Conditioner Lab Team: 10 Members: Sean M. Gallagher, Brian Davison, Prathana Vannarath, Pam McDowell Customer: University of Delaware Mechanical.
Four Points Engineering and Design Project 99.04: Heat Pump Design for Whalen Co. FPED Team Members: Ricardo Blackett, Andy Parke, Scott Quirico, Brian.
Team 10 Air Conditioning Experiment Members –Sean Gallagher –Pamela McDowell –Brian Davison –Prathana Vanarath Sponsors –Dr. Wexler –Dr. Advani Advisor.
Four Points Engineering and Design Project 99.04: Heat Pump Design for Whalen Co. FPED Team Members: Ricardo Blackett, Andy Parke, Scott Quirico, Brian.
Team 10 ME Project: Air Conditioner Lab Members Customer Advisor Sean M. Gallagher, Brian Davison U of D ME Department Dr. Keefe Prathana Vannarath, Pam.
Sean Kalman – Hays Fluid Controls
© 2010 McQuay International 1 McQuay Delivered VAV System Product Overview October 2010.
…an innovative shell and tube heat exchanger with an exceptionally high heat transfer coefficient for industrial fluid cooling and air conditioning.
Industrial Acoustic Sound Enclosures FanAir Company designs and builds Acoustic Sound Enclosures Engineered to each specific application to control noise.
Air conditioning – Refreshes your life Applied Systems DAIKIN Fan Coil Units Comfort Applications >> FWB
1 PredictiveOnLine PREDICTIVE SYSTEMS ENGINEERING Vintec Knowledge Ltd.
Lansing Board of Water & Light REO Town Headquarters & Cogeneration Plant REO Town Cogeneration: Concept to Commercial Operation.
Experts in Chem-Feed and Water Treatment Pre-Engineered Systems 1.
P13458 RIT Senior Design Team May 10, :30AM Dresser- Rand, Painted Post Final Presentation:
INSTALLATION & COMMISSIONING. 5WSS Installation Hanging the Unit Hanging the Unit Location Considerations Location Considerations Refrigerant Piping Refrigerant.
N O R T H A M E R I C A C O M M E R C I A L TDP
IFE Plant Structural Concepts Including Shielding and Optical Stability Requirements Thomas Kozub, Charles Gentile, Irving Zatz - PPPL.
Product Presentation 2007 SKY AIR Launch of new Non-Inverter + Duct (R22) series.
Drafts and Duct System Sizing
Dehumidification Justin Dunnahoo.
HEAT PUMPS BY: DINESH BAKTHAVATSALAM ID#: M-I.
Sponsor: Carrier Corporation Advisor: Dr. H. El-Mounayri May 3, 2007 Design Team: Mike Abel Braden Duffin Simon Marin Joe McGuire.
Air Conditioning Experiment Department of Mechanical Engineering University of Delaware.
IMPROVING THE EFFICIENCY GEOTHERMAL or GROUND SOURCE HEAT PUMPS.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62) Manager.
Sigma Rotary Screw Compressors
 2008 Kaeser Compressors, Inc., USA (V4.1) SFC Product Introduction “Specifications are subject to change without notice” 1 SFC Sigma Frequency Controlled.
We are one of the accredited manufacturers and suppliers of Accoustic Enclosure and Sound Proofing in northern part of India under brand Name of "DDSTHA".
Revolutionary Breakthrough in Optimized Marine Design Introducing Turbo Technology from Dometic Environmental.
REFRIGERATION SYSTEMS Er. Gagandeep kaur Associate Prof., Electrical Engg. PTU Giani Zail Singh Campus, Bathinda. Id:
Redesign of Bennett Hall HVAC System
. Level 3 Air Conditioning Inspections for Buildings
Material Transfer Apparatus
Sound Attenuator (UPC-26C)
UNICO INVERTER DC. UNICO INVERTER DC UNICO INVERTER DC The first INVERTER technology based heat pump without external unit on the market The new product.
Refrigeration & air conditioning
Section 6: Air-Conditioning (Heating And Humidification)
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
GEYSER Heat Pump Water Heater
AdaptaPAK The sustainable, energy-efficient outdoor refrigeration solution.
Heating, Ventilating, and Air Conditioning
Minimizer Confidential
Heating Ventilating and Air Conditioning
Concept Level Project Plan P08008 – ArcWorks Process Improvement
ID :- Contact No. : , Website :-
Heating, Ventilating, and Air-Conditioning
FCI and FCX Range FCI and FCX Range.
Sound Attenuator (UPC-26C)
FBE03: Building Construction & Science
Presentation transcript:

Four Points Engineering and Design Project 99.04: Heat Pump Design for Whalen Co. FPED Team Members: Ricardo Blackett, Andy Parke, Scott Quirico, Brian Zigmond

Heat Pump Design Team 4 –Ricardo Blackett : –Andrew Parke : –Scott Quirico : –Brian Zigmond : Customer: Whalen Co. Advisor: Dr. Keefe

Presentation Agenda 1. Introduction and background revisited. 2. Method a. Metrics b. Benchmarks c. Concepts 3. Schedule

Project Background By 2000, ARI will require that no standing water be allowed in HVAC systems. This prompts Whalen Co., manufacturer of HVAC equipment specifically for high-rise buildings, to redesign the current condensate drip pan in their vertical water source heat pump. In the redesign, other improvements were suggested...

Thus, the problem as presented to FPED has 3 components: Eliminate the standing water in the condensate drain pan of the unit. Improve the circulation in the “two room” units. Lower the operating noise level.

Mission In the allotted time and as economically as possible FPED will: 1. Eliminate standing water in Whalen’s vertical heat pump 2. Decrease unit’s noise level 3. Improve circulation in the two-room units

Our Approach Project Requirements Whalen’s problem Competitive Benchmarking Present FPED’s Solution to Whalen Co. Develop Concept Produce a unit that: eliminates standing water is quieter has improved room circulation We Are Here

Constraints Size and geometry of unit and enclosure. Regulatory commission specifications. (ARI, UL)

Customers and Wants Internal to Whalen Executive Production Sales Engineering External Consumer NCDA Affordability, improved circulation. Ease of fabrication / installation. Affordability, improved circulation. Improved circulation, ease of fabrication. Affordability, quiet Design process

Metrics and Target Values Cost of Materials Cost of Manufacturing Air Changes per Hour in Adjacent Room Number of Parts Assembly Line Costs Fabrication Time Installation Time Down Time Repair Time Decibel Level Grade About $15 per pan About $52 per pan > 0 About 12 Minimum 1/2 hour/pan Minimum 4 Hours Less than Current Value A

System Benchmarking: Competitors and Best Practices... Trane: Well insulated unit gives quiet performance, removable drain pan for easy maintenance. ClimateMaster: Removable chassis for easy maintenance, sound-suppressing baffles on intakes.

Drain Pan Insert Materials selection is in progress. Ease of manufacturing and cost of materials is being considered. Actual geometry of insert to be determined upon physical inspection of unit.

Two Room Air Draw

Two Room Air Draw continued… Extend the width of the enclosure slightly to allow ducting of air flow from both rooms. Relocation of existing cooling coil within heat pump to accommodate return in rear of unit.

Sound Suppression Benchmarking Elastomer Isolators –Use natural rubber to absorb vibration and shock to reduce noise –Directly incorporated into the structural components of unit –Installed in series or parallel for greater load capacity External Sound Attenuator –Combination of baffles and insulation that attaches to ductwork –Mainly used in industrial applications

Sound Suppression Concepts Insert neoprene or rubber insulating mat between unit and floor to eliminate noise from vibrations. Isolate fan and compressor motor from chassis through grommets and mountings. Improve or add insulation to unit. Attach external sound attenuator.

Sound Suppression Evaluation

Budgeting The established budget from Mr. Whalen is to “provide a unit and any and all materials needed within reason.” Through FPED’s efforts to minimize all costs, and NCDA’s experience, past agreements similar to this method have been successful.

ACTUALLY Since Last Time...

…And Until the Next Time

The Big Picture

Who Done It…….. Ric- keep minutes of meetings, scheduler, SSD Zig- HVAC, competitor tracking, spokesman Scott-Mediator, functional benchmarking Andy-machine shop, materials, target values for metrics