LAr Frontend Board PRR Introduction 1.Overview of FEB functionality 2.FEB performance requirements 3.Development and evaluation of FEB 4.Organization of.

Slides:



Advertisements
Similar presentations
On the development of the final optical multiplexer board prototype for the TileCal experiment V. González Dep. of Electronic Engineering University of.
Advertisements

TileCal Optical Multiplexer Board 9U VME Prototype Cristobal Cuenca Almenar IFIC (Universitat de Valencia-CSIC)
6 Mar 2002Readout electronics1 Back to the drawing board Paul Dauncey Imperial College Outline: Real system New VFE chip A simple system Some questions.
Readout of the ATLAS Liquid Argon Calorimeters John Parsons Nevis Labs, Columbia University Representing the ATLAS LAr Collaboration ATLAS.
S 1 Summer Student Sessions 13 August 2008 Chew Soo Hoon University Of Malaya, Malaysia Jan Stark LPSC, Grenoble, France
CHL -2 Level 1 Trigger System Fully Pipelined Custom ElectronicsDigitization Drift Chamber Pre-amp The GlueX experiment will utilize fully pipelined front.
Front-end electronics for Time Projection Chamber I.Konorov Outlook:  TPC requirements  TPC readout options  Options for TPC FE chips  Prototype TPC.
TileCal Electronics A Status Report J. Pilcher 17-Sept-1998.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
Overview of ATLAS Liquid Argon Frontend Crate Electronics John Parsons Nevis Labs, Columbia University LAr Electronics ASSO Review, June ATLAS.
Status of the Optical Multiplexer Board 9U Prototype This poster presents the architecture and the status of the Optical Multiplexer Board (OMB) 9U for.
DSP online algorithms for the ATLAS TileCal Read Out Drivers Cristobal Cuenca Almenar IFIC (University of Valencia-CSIC)
Uli Schäfer 1 JEM: Status and plans JEM1.2 Status Test results Plans.
4 Dec 2001First ideas for readout/DAQ1 Paul Dauncey Imperial College Contributions from all of UK: result of brainstorming meeting in Birmingham on 13.
Uli Schäfer 1 JEM1: Status and plans power Jet Sum R S T U VME CC RM ACE CAN Flash TTC JEM1.0 status JEM1.1 Plans.
ECAL electronics Guido Haefeli, Lausanne PEBS meeting 10.Jan
Status of opto R&D at SMU Jingbo Ye Dept. of Physics SMU For the opto WG workshop at CERN, March 8 th, 2011.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS) Orsay, France Calorimeter upgrade meeting Olivier Duarte Upgrade calo FE review Comments : Digital.
A Serializer ASIC for High Speed Data Transmission in Cryogenic and HiRel Environment Tiankuan Liu On behalf of the ATLAS Liquid Argon Calorimeter Group.
Preliminary Design of Calorimeter Electronics Shudi Gu June 2002.
1 A Serializer ASIC at 5 Gbps for Detector Front-end Electronics Readout 1.Overview. 2.Test results of LOCs1, the 5 Gbps 16:1 serializer. 3.Test results.
Larg. Week, April 2002, Electronics Meeting1 Progress Report On Electronics Activities in Paris Bertrand Laforge LPNHE Paris CNRS/IN2P3 – Universités Paris.
Proposal of new electronics integrated on the flanges for LAr TPC S. Cento, G. Meng CERN June 2014.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
A. Sukhanov, BNL1 NCC Electronics Readout of pad structured sensors ● High dynamic range ● Summing signals from 6 detectors on one preamp ● NCC should.
Ondřej Svoboda for the ECAL group HADES collaboration meeting XXV, 19 – 23 November 2012 GSI.
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
CM26 March 2010Slide 1 EMR Status o Intro o Construction o Magnetic shielding o Electronics o Prototype Cosmics test o Schedule Jean-Sebastien Graulich,
Status of the Beam Phase and Intensity Monitor for LHCb Richard Jacobsson Zbigniew Guzik Federico Alessio TFC Team: Motivation Aims Overview of the board.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
September 8-14, th Workshop on Electronics for LHC1 Channel Control ASIC for the CMS Hadron Calorimeter Front End Readout Module Ray Yarema, Alan.
Colmar Setember 2002 M. Dentan, Ph. Farthouat 1 out of 38 Radiation Assurance in the LHC experiments Martin Dentan CEA Saclay Philippe Farthouat CERN With.
1 VeLo L1 Read Out Guido Haefeli VeLo Comprehensive Review 27/28 January 2003.
8/9/2000T.Matsumoto RICH Front End RICH FEE Overview PMT to FEE signal connection Trigger Tile Summation of Current RICH LVL-1 Trigger Module1,2 What is.
The AFTER electronics from a user’s point of view D. Attié, P. Colas Mamma meeting,CERN Feb T2K electronics.
1 I discuss only the Barrel EM Lar - most advanced This is the FEC (Front End Crate at the back of the EM calorimeter. This is what is mostly discussed.
ECL trigger for Super Belle B.G. Cheon (Hanyang U)‏ KEK 1 st open meeting of the Super KEKB Collaboration.
5 Dec., 2001 A summary of system tests at BNL related to the ROD presented by Kin Yip From a user point of view : Description of the system of the test.
Installation and Commissioning of the ATLAS LAr Readout Electronics
HBD FEE test result summary + production schedule 16mv test pulse result –5X attenuator + 20:1 resistor divider at input (to reduce the noise on the test.
1 US CMS DOE/NSF Review: May 8-10, WBS 4.0 The Electromagnetic Calorimeter Roger Rusack The University of Minnesota US-CMS L2 ECAL Manager.
J.Ye / SMU Sept.4, 2007 Joint ATLAS CMS Opto-electronics working group, subgroup C 1 Report from sub-group C, Optical Link Evaluation Criteria and Test.
CERN, 18 december 2003Coincidence Matrix ASIC PRR Coincidence ASIC modifications E.Petrolo, R.Vari, S.Veneziano INFN-Rome.
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 CSC Mechanics and Electronics Paul O’Connor Tom Muller BNL May 22, 2003.
A high speed serializer ASIC for ATLAS Liquid Argon calorimeter upgrade Tiankuan Liu On behalf of the ATLAS Liquid Argon Calorimeter Group Department of.
1 The Link-On-Chip (LOC) Project at SMU 1.Overview. 2.Status 3.Current work on LOCs6. 4.Plan and summary Jingbo Ye Department of Physics SMU Dallas, Texas.
FPGAs in ATLAS Front-End Electronics Henrik Åkerstedt, Steffen Muschter and Christian Bohm Stockholm University.
CMS Upgrade Workshop – Nov 20, H C A L Upgrade Workshop CMS HCAL Working Group FE Electronics: New GOL Nov 20, 2007 HCAL personnel interested in.
Calorimeter Digitisation Prototype (Material from A Straessner, C Bohm et al) L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
SKIROC ADC measurements and cyclic ADC LPC Clermont-Ferrand Laurent ROYER, Samuel MANEN Calice/Eudet electronic meeting Orsay June.
LECC 2004, BostonA. Vollhardt, Universität Zürich/Switzerland1 LHCb Silicon Tracker electronics: from R&D to preproduction.
ATLAS SCT/Pixel TIM FDR/PRR28 June 2004 TIM Requirements - John Lane1 ATLAS SCT/Pixel TIM FDR/PRR 28 June 2004 Physics & Astronomy HEP Electronics John.
Standard electronics for CLIC module. Sébastien Vilalte CTC
Defining & enforcing a radiation tolerance policy The ATLAS case Philippe Farthouat, PH-ESE.
Current Status of RICH LVL-1 Trigger Module Takashi Matsumoto and Ken Oyama Presentation Outline Topics Geometry of Trigger Tile Required function of RICH.
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
17 Apr 2002 MCLARG Electronics Meeting News HEC Preshaper PRR passed on Thursday Apr 11 LECC02 (Workshop on LHC Electronics) will be held in Colmar, France.
1 Status report on the LAr optical link 1.Introduction and a short review. 2.The ASIC development. 3.Optical interface. 4.Conclusions and thoughts Jingbo.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
D. Breton, S. Simion February 2012
Installation and Commissioning of the ATLAS LAr Readout Electronics
Børge Svane Nielsen/JJG
TTC system for FP420 reference timing?
LHCb calorimeter main features
ATLAS Tile Calorimeter Interface The 8th Workshop on Electronics for LHC Experiments, Colmar, 9-13 September 2002 K. Anderson, A. Gupta, J. Pilcher, H.Sanders,
Lecture 25 - electronic readout
The ATLAS LAr. Calibration board K. Jakobs, U. Schaefer, D. Schroff
PID meeting Mechanical implementation Electronics architecture
Presentation transcript:

LAr Frontend Board PRR Introduction 1.Overview of FEB functionality 2.FEB performance requirements 3.Development and evaluation of FEB 4.Organization of FEB PRR presentations and documents John Parsons Nevis Labs, Columbia University March 18/2004

J. Parsons, FEB PRR, March 18/20042 functionality includes: receive input signals from calorimeter amplify and shape them store signals in analog form while awaiting L1 trigger digitize signals for triggered events transmit output data bit-serially over optical link off detector provide analog sums to L1 trigger sum tree Frontend Board Overview

J. Parsons, FEB PRR, March 18/20043 read out  170k channels of calorimeter (total of 1524 FEBs) dynamic range  16 bits measure signals at bunch crossing frequency of 40 MHz (ie. every 25 ns) store signals during L1 trigger latency of up to 2.5  s (100 bunch crossings) digitize and read out 5 samples/channel at a max. L1 rate of 100 kHz measure deposited energies with resolution < 0.25% coherent noise per channel < 5% of total noise per channel measure times of energy depositions with resolution << 25 ns high density (128 channels per board) low power (  0.8 W/channel) high reliability over expected lifetime of > 10 years must tolerate expected radiation levels (10 yrs LHC, no safety factors) of: TID 5 kRad NIEL 1.6E12 n/cm2 (1 MeV eq.) SEU 7.7E11 h/cm2 (> 20 MeV) Overview of Requirements of ATLAS LAr FEB

J. Parsons, FEB PRR, March 18/20044 Full functionality “Module 0” FEB boards were developed Provided verification of the electronics design concepts Used in testbeam runs with Module 0 and production calorimeter modules In total, almost 50 Mod0 FEBs (  6000 channels) were produced Have been operating reliably in testbeam for past several years (and continue to do so) Performance meets or exceed ATLAS specifications Due to schedule, Mod0 boards developed with some “short cuts”: Did not use final control signal (TTC and SPAC) distribution FEB used Cu output cables instead of optical links Did not pay strict attention to radiation tolerance requirements the main task remaining in the development of the final ATLAS FEB was to radiation harden the designs, and in particular to replace several FPGAs and other COTs with custom rad-tol ICs Module 0 Electronics Experience

J. Parsons, FEB PRR, March 18/ different custom rad-tol ASICs, relatively few COTs Overview of main FEB components 32 SCA16 ADC8 GainSel 1 GLink1 Config.2 SCAC 1 SPAC 1 MUX 32 Shaper 1 TTCRx 7 CLKFO 14 pos. Vregs +6 neg. Vregs 2 LSB 32 0T 128 input signals 1 fiber to ROD Analog sums to TBB DMILL DSM AMS COTS 2 DCU TTC, SPAC signals

J. Parsons, FEB PRR, March 18/20046 one GLink output link per FEB, with rate of 1.6 Gbps link collaboration includes SMU, ISN, Stockholm, and Taiwan FEB Optical Links 1.6 Gb/s

J. Parsons, FEB PRR, March 18/20047 FEB Prototype Development 128 channels/FEB Large 10 layer PCB, with components on both sides First FEB assembled and tested (without Vreg) during Nov. ‘01 Pos. STm Vregs added Dec. ‘01 First neg. STm Vregs (JQ4) tested Dec. ’02 Vreg showed stability problems Pinout change required iterated FEB design (  v. 1.4) JQ5 neg. ST Vreg tested June ’03 Stability problem solved, but radiation problems seen 20 v1.4 FEBs made for FECT Two FEBs successfully tested with JQ6 neg. STm Vreg in October ’03 FEB design iterated (  v. 1.5) in Jan. ‘04 to implement QPLL to reduce CLK jitter Two v1.5 FEB produced and tested

J. Parsons, FEB PRR, March 18/20048 Before proceeding to PRRs of FE crate electronics, LAr decided to perform system test (at BNL) with all boards required for one half-FEC (~ 1% of total system) The FEC system test included 14 FEBs (1792 channels) The main FEB results from FECT will be presented by Ioannis Katsanos Last fall, it was observed during the FEC test that some of the FEBs showed large error rates in their output data optical links Many detailed investigations since then have allowed us to understand that the problem was from jitter on the FEB CLK, due both to jitter in the incoming TTC signal and to jitter from the on-board TTCRx Usage of a “cleaner” TTC source allowed stable running of the FECT We have in addition modified the FEB design to incorporate the QPLL, in order to provide more operating margin Stefan Simion will summarize the jitter studies, and solution implemented Front End Crate System Test

J. Parsons, FEB PRR, March 18/ Concern over availability of rad-tol negative Vreg JQ6 version from STm accepted for production Meeting (this week) to hear results of STm’s 1000 hr lifetime test Production quantity to be available next month 2.Concern over availability of ADC (joint order with CMS/LHCb) Delivery is well underway (2 lots accepted, 3 rd lot being irradiated now) 3.Concern over SMUX/GLink timing issues for optical link Delay chip added to provide additional margin Most important timing parameters being measured for each SMUX chip 4.Proposed use of Power-on-Reset scheme as per the CALIB board Done 5.Diodes should be tested for radiation tolerance Done for pre-selection, planned for production (see Stefan’s talk) 6.Develop further plan for traceability of components via serial numbers Done Issues from FEB Final Design Review (June 18/02)

J. Parsons, FEB PRR, March 18/ FEB results from FEC system test- Ioannis Katsanos Timing/jitter studies- Stefan Simion Summary of FEB radiation qualification- Stefan Simion FEB production and QA/QC overview- John Parsons FEB HASS test- Gustaaf Brooijmans FEB test setup at LAL- Dirk Zerwas FEB test setup at BNL- Hucheng Chen Summary- John Parsons FEB PRR Presentations