Copyright 2011 Scott W. Ambler Agile and Enterprise Architecture March 2011 Survey Results Scott W. Ambler
Copyright 2011 Scott W. Ambler How To Use These Slides I have provided these slides, and the raw data behind them, so that others can use them in their own work. You may reuse all, or a part of, this slide deck as long as you provide a clear reference to the source. The suggested reference is: Results from Scott Ambler’s March 2011 Agile and Enterprise Architecture Survey posted at Many slides have notes
Copyright 2011 Scott W. Ambler About the Survey Ran on March 28 and 29, 2011 Survey link included in: –Posting to Agile Alliance, Agile CMMI, Considerate Enterprise Architecture, Enterprise Architecture Symposium, and CIPS discussion groups on LinkedIn –Twitter posting Data, summary, and slides downloadable from respondents 67% worked in organizations with an enterprise architecture team –This number is higher than average, reflecting the bias towards such organizations in the forums where I announced the survey
Copyright 2011 Scott W. Ambler How well does your organization’s EA group work with Agile Teams?
Copyright 2011 Scott W. Ambler How agile is your EA team in the way that it works?
Copyright 2011 Scott W. Ambler How does your EA team view agile strategies?