MMT AO run Jan 13 - 23. Timeline: –Night 1: Install hardware during MMT engineering –Nights 2-4: AO engineering with fast-framing H camera (Indigo) –Nights.

Slides:



Advertisements
Similar presentations
GSMT Control Workshop Tucson, September 11-12, 2001 Pointing Control for a giant segmented mirror telescope Patrick Wallace Rutherford Appleton Laboratory.
Advertisements

“Riding the Hub”: The MMT Adaptive Secondary Douglas Miller University of Arizona The AO System Current Performance of the MMT AO System Ongoing Development.
LBT AO Progress Meeting, Arcetri Walter Seifert (ZAH, LSW) The LBT AO System and LUCIFER 1.Requirements for the commissioning of LUCIFER:
Extragalactic AO Science James Larkin AOWG Strategic Planning Meeting September 19, 2004.
The Project Office Perspective Antonin Bouchez 1GMT AO Workshop, Canberra Nov
AO188/LGS status AO188 development group(Subaru Telescope, NAOJ) (JST)
PILOT: Pathfinder for an International Large Optical Telescope -performance specifications JACARA Science Meeting PILOT Friday March 26 Anglo Australian.
NGAO Instrumentation Overview September 2008 Updated Sean Adkins.
NIR LOWFS for Keck and TMT Roger Smith & David Hale.
PALM-3000 PALM-3000 Instrument Architecture Antonin Bouchez PALM-3000 Requirements Review November 12, 2007.
PALM-3000 P3K Stimulus Design Update Rick Burruss P3K Team Meeting #7 February 27, 2008.
NGAO Alignment Plan See KAON 719 P. Wizinowich. 2 Introduction KAON 719 is intended to define & describe the alignments that will need to be performed.
G D Interferometer Status LSC Meeting, Ann Arbor, June 4, 2005 Daniel Sigg.
LGS-AO Performance Characterization Plan AOWG meeting Dec. 5, 2003 A. Bouchez, D. Le Mignant, M. van Dam for the Keck AO team.
PALM-3000 Instruments update A. Bouchez Team Meeting #9 22 Oct
PALM-3000 High-order Wavefront Sensor Update Christoph Baranec Team Meeting #9 10/22/2008.
NGAO High-Contrast Performance Budget (WBS aka Companion Sensitivity) Initial WFE budget and status report NGAO Team meeting #4, WMKO Kamuela.
PALM-3000 Systems Engineering R. Dekany, A. Bouchez 9/22/10 Integration & Testing Review.
1 NGAO Science Instrument Reuse Part 1: NIRC2 NGAO IWG December 12, 2006.
LIGO-G L Peter Fritschel & Michael Zucker PAC18 meeting LIGO Livingston Observatory 18 May 2005 S5 Run Performance Goals.
Design Team Report: AO Operational Tools (aka Acquisition and Diagnostics) Christopher Neyman W. M. Keck Observatory (for the Operational tools team) Keck.
Imaging Planets in the Thermal Infrared Phil Hinz University of Arizona Outline: Observations of HR 8799 and Fomalhaut Survey of FGK stars in the thermal.
Ljubljana fiber fed fast photometer Andrej Čadež Bojan Dintinjana Anja Lautar Dejan Paradiž Dušan Ponikvar Bled, March.2008.
Week 2. Determines number of objects in focus. Larger number equals smaller opening. Aperture is also referred to as “ƒstop”. Will make the biggest difference.
Optical flow (motion vector) computation Course: Computer Graphics and Image Processing Semester:Fall 2002 Presenter:Nilesh Ghubade
Keck AO Operations D. Le Mignant for the Keck AO team.
1 m – APOGEE Feed Jon Holtzman Diane Feuillet (NMSU)
Michigan/MIKE Fiber System (MMFS) – Update Apr 2005.
The Relativity Mission, Gravity Probe B Experimental Design, Sources of Error, and Status Mac Keiser Snowmass 2001 July 4, 2001.
J. Large Binocular Telescope (LBT) Operational Readiness
1 On-sky validation of LIFT on GeMS C. Plantet 1, S. Meimon 1, J.-M. Conan 1, B. Neichel 2, T. Fusco 1 1: ONERA, the French Aerospace Lab, Chatillon, France.
LGS AO Readiness for 05B AOWG meeting February 4, 2004 Keck LGS AO team.
MCAO Adaptive Optics Module Mechanical Design Eric James.
Center for Astronomical Adaptive Optics Ground layer wavefront reconstruction using dynamically refocused Rayleigh laser beacons C. Baranec, M. Lloyd-Hart,
STATUS REPORT OF FPC SPICA Task Force Meeting March 29, 2010 MATSUMOTO, Toshio (SNU)
Clio: 3-5  m planet-finding AO camera Ari Heinze (Steward Observatory) Collaborators: P. Hinz (Steward), S. Sivanandam (Steward), M. Freed (Optical Sciences),
Virgo Commissioning update Gabriele Vajente for the Virgo Collaboration LSC/VIRGO Meeting – MIT 2007, July LIGO-G Z.
The AO system for the GTC -an update Nicholas Devaney, Dolores Bello, Bruno Femenía, Alejandro Villegas, Javier Castro Grantecan, Instituto de Astrofísica.
Tomographic reconstruction of stellar wavefronts from multiple laser guide stars C. Baranec, M. Lloyd-Hart, N. M. Milton T. Stalcup, M. Snyder, & R. Angel.
Lyot Stop Focal Plane Mask OAP3 Out of plane spherical mirror.
FLAO system test plan in solar tower S. Esposito, G. Brusa, L. Busoni FLAO system external review, Florence, 30/31 March 2009.
G Amaldi Meeting 2015, Gwangju, South Korea1 Status of LIGO June 22, 2015 Daniel Sigg LIGO Hanford Observatory (on behalf of the LIGO Scientific.
LBTI Program Management Review Phil Hinz S.H. (Hop) Bailey 2 December
ASTR 3010 Lecture 18 Textbook N/A
The Active Optics System S. Thomas and the AO team.
Large Binocular Telescope Interferometer (UA) Q4 FY10 Exoplanet Presentation Philip Hinz - PI Thomas McMahon - PM LBTI 1.
D. Measurement Approach Phil Hinz Principal Investigator.
1 AAS Meeting, San Diego – January 13, 2005 Swift-UVOT Post-Launch Status Pete Roming S. D. Hunsberger, C. Gronwall, J. A. Nousek, A. A. Breeveld, K. O.
March 31, 2000SPIE CONFERENCE 4007, MUNICH1 Principles, Performance and Limitations of Multi-conjugate Adaptive Optics F.Rigaut 1, B.Ellerbroek 1 and R.Flicker.
Page 1 Adaptive Optics in the VLT and ELT era Wavefront sensors, correctors François Wildi Observatoire de Genève.
Some Thoughts on Ground Layer Adaptive Optics & Adaptive Secondary Mirrors for Keck P. Wizinowich 9/15/14 1.
D. Still-FNAL/Tevatron HALO '03 Tevatron Collider II Halo Removal System Dean Still Fermilab Tevatron Department 5/21/2003 Motives for the Collider Run.
Wide field telescope using spherical mirrors Jim Burge and Roger Angel University of Arizona Tucson, AZ Jim
System Performance Metrics and Current Performance Status George Angeli.
GLAST User’s Committee Meeting– 1 – June 6-7, 2005 GLAST Burst Monitor (GBM) Chip Meegan NASA/MSFC.
Robo-AO Overview: System, capabilities, performance Christoph Baranec (PI)
FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto.
Innovations Foresight Astronomical Seeing The Astro-Imaging Channel Dr. Gaston Baudat Innovations Foresight, LLC 1(c) Innovations Foresight Dr.
다양한 창문을 통한 우주 내용 왜 다양한 창문 ? 왜 다양한 창문 ? 대기의 영향 대기의 영향 망원경의 성능 망원경의 성능 관측에서 얻는 정보 관측에서 얻는 정보 중요 망원경들 중요 망원경들 차세대 망원경들 차세대 망원경들.
B. Humensky 2/24/2012 CTA-SCT Mtg - SLAC
The GMT Project The Giant Magellan Telescope (GMT)
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
NIRSpec Time Series Observations
Pyramid sensors for AO and co-phasing
SOFIA Pointing and Optimization Team (SPOT): Recent Results and Plans
Intra-pixel Sensitivity Testing Preliminary Design Review
Detective Quantum Efficiency Preliminary Design Review
FourStar 4K x 4K JHK imager
LGS Project Meeting December 21, 2006 Agenda SWIFT update - A. Bouchez
Lessons Learned from Commissioning of Advanced Detectors
Presentation transcript:

MMT AO run Jan

Timeline: –Night 1: Install hardware during MMT engineering –Nights 2-4: AO engineering with fast-framing H camera (Indigo) –Nights 5-7 (nominally): ARIES commissioning The good – ARIES mounts just fine and makes focused images. The bad – Images are badly astigmatic, and the entrance window was cracked while trying to fix this. The detectors are OK, but we still don’t understand where the astigmatism came from. –Night 7: More imaging with Indigo camera –Nights 8-10: Imaging/nulling with BLINC/MIRAC –Night 11: Lost to bad weather and PSU failure

System view Overall the system runs very sweetly at 550 updates per sec. Currently we correct the lowest 52 modes of the aberration (sufficient to get the diffraction limit at H in good seeing). Integration time can be slowed down arbitrarily to give access to fainter guide stars. Ability to dial static aberration into the WFS to clean up DC errors in the science focal plane.

Secondary mounted and ready to go, November Takes 1.5 hr and 2 people to mount and dismount (currently requires Francois Wildi and Michael Lloyd-Hart). WFS top box is also straightforward to mount.

Challenges that surfaced Loss of ARIES was a blow – we need to understand the source of astigmatism before we rebuild the dewar’s front end in case design changes are needed. Installation of the system is now faster than f/9 although post-installation alignment must still be sped up. WFS read noise is WAY too high (> 30 e-). Limits us to stars > V ~ 10. Internal alignment of the WFS must be automated to guard against flexure w/ gravity. Image jitter is seen at 19 and 38 Hz at the level of 20 mas. This currently limits our Strehl.

Power in one-axis image motion

Current operational constraints Takes two people (Doug Miller and Guido Brusa) to run the system. Installation requires a team of ~6 people. Guide star brightness must be < 10 (we hope this will improve by several magnitudes before our next run). Still some single point failures that must be addressed (e.g. power supplies).

Future Most of the hardware has been left at the mountain (it works, so no need to move it). Problems with WFS sensitivity, optical alignment and image jitter are to be addressed in the next 4 months. We would like another run in May devoted largely to engineering, demonstrating closed loop on fainter stars and improved robustness/ observing efficiency. Use PISCES to demonstrate K band diffraction limit (not seen yet).