Wire Position System LCLS Undulator Alignment and Motion Review, Oct. 22, 2005 1 Franz Peters Wire Position System The Undulator.

Slides:



Advertisements
Similar presentations
Mass Metrology, April 2003Mass Metrology - Susceptometer, June 2007 Sartorius Susceptometer - for Precise Measurement of: Susceptibility and Magnetization.
Advertisements

Multipole Girders - Alignment & Stability (Multipole Girder Alignment technology & R&D) S. Sharma ASD: J. Skaritka, D. Hseuh, V. Ravindranath, G. Miglionico,
October 21, 2005 Internal LCLS Undulator Alignment and Motion Review Georg Gassner, SLAC / MET 1 HLS Monitoring System Georg.
1 Long-term Variation of the Magnet Alignment In SPring-8 Storage Ring Main events of magnet alignment Long-term monitoring Variation of magnet alignment.
Experience Report with the Alignment Diagnostic System Georg Gassner September 17 th 2010.
Wed 15 Jul 2009 ATF2 weekly meeting Oxford MONALISA 1 MONALISA at ATF2 First installation report 15 July 09.
October 12, 2006 Heinz-Dieter Nuhn, SLAC / LCLS Undulator Good Field Region and Tuning Strategy 1 Undulator Good Field Region and.
Undulator Alignment Strategy – April 20, 2006 Heinz-Dieter Nuhn, SLAC / LCLS FAC 1 Undulator Alignment Strategy Heinz-Dieter Nuhn,
LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review Introduction to the LCLS Undulators Heinz-Dieter Nuhn,
October 20-21, 2005 Internal LCLS Undulator Alignment and Motion Review Catherine LeCocq, SLAC 1 Undulator Alignment Concept &
Isaac Vasserman Magnetic Measurements and Tuning 10/14/ I. Vasserman LCLS Magnetic Measurements and Tuning.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Alignment.
Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
1 Heinz-Dieter Nuhn 1 BFW Results June 2009 FAC BFW Results Heinz-Dieter Nuhn – LCLS Undulator Group Leader June 9, 2009.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics.
Bob Lill LCLS FAC June 16-18, 2008 RF BPM Status and Production Test Results.
Robert Ruland Intra Girder Assembly and Alignment - October 20, 2005 Internal LCLS Undulator Alignment and Motion Review 1 Intra.
XFD – XF Engineering Group November 15-th, 2004LCLS Undulator Final Design Review1 Undulator for the LCLS project – from the prototype to the full scale.
Zachary Wolf LCLS Undulator October 30, LCLS Undulator Tuning And Fiducialization Zack Wolf, Yurii Levashov, Achim.
Electromagnetic Flowmeter Why use flow meters What is a magnetic flow meter – How do they work – How are the different from other meters Items that will.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team with 3D views and data from Hubert Gerwig, Richard Rosing and Juha Kemppinen Pre-alignment.
Zachary Wolf Undulator Oct 12, LCLS Undulator Tuning Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko,
Mechanical design, analysis and integration of pre-alignment systems for CLIC M.Anastasopoulos / BE-ABP-SU.
LLRF Phase Reference System The LCLS linac is broken down into 4 separate linac sections. The LCLS injector will reside in an off axis tunnel at the end.
Shielding the Weiner PSU 7 May 2013 Kiril Marinov ASTeC, MaRS, DL 1.
LINEAR MEASUREMENT.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
David Urner, Oxford University, RHUL – June StaFF Stabilization of Final Focus Motion Stabilization with Nano-Meter Precision David Urner Paul Coe.
Franz Peters, Georg Gassner WPM/HLS Status and June 17 th, WPM & HLS Status and Schedule Franz Peters, Georg Gassner.
NLC MAC Meeting 6-8 Nov Linac Girder Studies and Plans C. Boffo Slide 1 Linac Girder Studies and Plans C. Boffo – E. Borissov – H. Carter Fermilab,
BEPCII Prealignment Installation Survey and Alignment Accelerator Center of IHEP Xiaolong Wang
The ZEUS Hadron-Electron-Separator Performance and Experience Peter Göttlicher (DESY) for the ZEUS-HES-group Contributions to HES Germany, Israel, Japan,
Malte Hildebrandt, PSIMEG - Review Meeting / 1   e  Drift Chambers Charge Division Test Chamber Testsetup for Cosmics Chamber Construction.
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
CLIC Module WG 20/07/2009 H. MAINAUD DURAND, BE-ABP/SU Pre-alignment system and impact on module design.
S. Molloy, P. Emma, J. Frisch, R. Iverson, M. Ross, D. McCormick, M. Woods, SLAC, CA, USA S. Walston, Lawrence Livermore National Laboratory, CA, USA V.
Max Cornacchia, SLAC LCLS Project Overview BESAC, Feb , 2001 LCLS Project Overview What is the LCLS ? Transition from 3 rd generation light sources.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
1/13 Tatsuya KUME Mechanical Engineering Center, High Energy Accelerator Research Organization (KEK) ATF2-IN2P3-KEK kick-off meeting (Oct. 9, 2006) Mount.
2002 LHC days in Split Sandra Horvat 08 – 12 October, Ruđer Bošković Institute, Zagreb Max-Planck-Institute for Physics, Munich Potential is here...
An electron/positron energy monitor based on synchrotron radiation. I.Meshkov, T. Mamedov, E. Syresin, An electron/positron energy monitor based on synchrotron.
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
MLI Summary Chris Adolphsen SLAC. Summary of MLI Talks Quadrupoles (V. Kashikhin) –Expect test of a SLAC/CIEMAT and FNAL cos(2phi), ~ 60 T/m, SC Quads.
ILC Main Linac Superconducting Quadrupole V. Kashikhin for Superconducting Magnet Team.
Alignment system and impact on CLIC two-beam module design H. Mainaud-Durand, G. Riddone CTC meeting –
Catherine LeCocq, SLAC Alignment Plan for the LCLS Undulator IWAA 2006,1 Alignment Plan for the LCLS Undulator Catherine.
October 27-28, 2005 FAC Meeting Undulator Metrology Catherine LeCocq, SLAC 1 Undulator Metrology Catherine LeCocq, SLAC October.
MLI Update Chris Adolphsen SLAC. CAVITY VESSEL T4CM QUAD T4CM BPM QUADS LEADS 80K BLOCK 4K BLOCK Quadrupole Package.
1 BROOKHAVEN SCIENCE ASSOCIATES Beam Stability Overview NSLS-II CFAC Meeting May 8, 2007 S. Krinsky.
BRAINSTORMING ON LASER BASED SOLUTIONS FOR CLIC PRE-ALIGNMENT INTRODUCTION Hélène MAINAUD DURAND, BE/ABP/SU, 09/02/2010 Status of the study CLIC pre-alignment.
The LCLS-II project consists of a new gun, a new superconducting linac, and new variable gap undulators. Civil construction will be at a minimum, and existing.
Digital Light Sources First introduced in 2001.
on behalf of the CLIC active pre-alignment team
Workshop on Tau-Charm at High Luminosity
Some movement monitor systems at DESY
LumiCal mechanical design, integration with LDC and laser alignment
Background With new accelerators delivering beams always smaller and more energetic, requirements for very precise beam alignment become more and more.
Pierre-Alexandre Thonet
Beam-Based Alignment Results
Undulator Tuning Status Heinz-Dieter Nuhn, SLAC / LCLS for Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko, Scott Jansson, Ralph Colon, Dave.
Heinz-Dieter Nuhn – LCLS Undulator Group Leader May 14, 2009
Bunker Wall Design Wall ESS
Progress and plans, Mechanics system of CEPC
Physics Requirements for Conventional Facilities
Undulator Alignment Plan
Alignment Diagnostic System Status
Breakout Session SC3 – Undulator
Presentation transcript:

Wire Position System LCLS Undulator Alignment and Motion Review, Oct. 22, Franz Peters Wire Position System The Undulator DescriptionTask, Design Objectives & Building Blocks Integration Mechanical Layout Electronics & Local Control Experience Previous Setups & Performance Measurements

Wire Position System LCLS Undulator Alignment and Motion Review, Oct. 22, Franz Peters Task of wire position system…. X-Ray runs: Permanent X & Y Position tracking of the 33 Undulator Segments on a Sub-Micrometer scale. Description 133 ABReference Diameter of a human hair No one has tried that in before. In any case we are the first:The first with success or The first with no success

Wire Position System LCLS Undulator Alignment and Motion Review, Oct. 22, Franz Peters Design objectives… to be successful Resolution< 100 Nanometer in X & Y direction Instrument Drift < 100 Nanometer per day Moving Range Millimeter in X & Y direction Accuracy 0.1 % of full Scale Availability Permanent, no interrupts Description

Wire Position System LCLS Undulator Alignment and Motion Review, Oct. 22, Franz Peters Principle options, detecting a wire.. CapacitiveThe measurement of small charges limits Resolution and increases Drifts Inductive Electrical noise and mechanical dimension limits resolution and stability. Matched Balanced use of both, electric & magnetic field which meets design objectives mostly. OpticalMicroscope, no Drifts, but Resolution limited by visible wave length. Description

Wire Position System LCLS Undulator Alignment and Motion Review, Oct. 22, Franz Peters Matched.., works like an RF directional coupler Description The principle is really simple, but we are shooting for resolution and stability in the region of 10 to the - 5

Wire Position System LCLS Undulator Alignment and Motion Review, Oct. 22, Franz Peters 1. 1.Fixed side wire end station 2. 2.Tube, as outer conductor 3. 3.Position Monitor for X & Y direction 4. 4.Pulley side end station 5. 5.Weight, used as constant force 6. 6.The wire: 0.5 mm diameter, stainless steel, Au plated Mechanics Description

Wire Position System LCLS Undulator Alignment and Motion Review, Oct. 22, Franz Peters Monitor GAP 8 Millimeter square Monitor Length74Millimeter Cross Section29Millimeter square The Monitor 8 mm LoopsWire Description

Wire Position System LCLS Undulator Alignment and Motion Review, Oct. 22, Franz Peters Electronic & Local Control Substations Receiver Crates Quad-ADCs Local Control Ethernet LAN Data Base Local Consol Description Link to LCLS Controls via TCP / IP

Wire Position System LCLS Undulator Alignment and Motion Review, Oct. 22, Franz Peters Geometry, - or were are the best places for two wires? - Integration One wire interfer with segment installation Supports necessary on both girder sides Roll data are depend on wire sag stability No interferece with segment installation One common support for both wires Roll data are independend from wire sag stability HorizontalVertical

Wire Position System LCLS Undulator Alignment and Motion Review, Oct. 22, Franz Peters Monitor Support Integration Two monitors on each end of each girder Segment removable without interfering WPS X-Pos and Y-Pos, can be measured Roll, Jaw & Pitch can be calculated.

Wire Position System LCLS Undulator Alignment and Motion Review, Oct. 22, Franz Peters Geometry Integration

Wire Position System LCLS Undulator Alignment and Motion Review, Oct. 22, Franz Peters Integration Electronic distribution…Options 1816Undulator segments Monitors / 19“ Crate 19“ Crate Packages Fault tolerant structure Power 5V,+ - 15V 4 Receiver MPX Controller Legend:

Wire Position System LCLS Undulator Alignment and Motion Review, Oct. 22, Franz Peters Result: WPS should never call for a controlled access. With 4 Crate in one place we have some redundancy. Failures at any system level does not affect functionality or performance. Why ? Loss of Fault-tolerant structure ? One of 4 Monitors has no effect One of 4 Crates has no effect One of 4 ADCs has no effect One of 2 Computersloss of roll only Integration But, Roll is available also by HLS

Wire Position System LCLS Undulator Alignment and Motion Review, Oct. 22, Franz Peters Proposed substation places.. A & B In case of failure…. …no controlled access to the Undulator hall necessary, because of a fully redundant system structure. Integration

Wire Position System LCLS Undulator Alignment and Motion Review, Oct. 22, Franz Peters Substation Layout No additional heat load to the Undulator hall, because of one built in air condition unit with radiators outside. Integration Receiver Crate

Wire Position System LCLS Undulator Alignment and Motion Review, Oct. 22, Franz Peters One of two substation One Substation fit between supports under one Undulator segment. Integration

Wire Position System LCLS Undulator Alignment and Motion Review, Oct. 22, Franz Peters SLAC FFTBWPS at first designed for FFTB Quadrupole position tracking. Runs a few weeks per year over several years. SLAC Sec10Performance test with 14 Monitors, 2 Wires, 30 Meter wire length at the SLAC alignment tunnel. DESY HERA H1 & Zeus IP straight sections under control by WPS 128 Monitors, 4 Wires, 60 Meter Length, each. Experience

Wire Position System LCLS Undulator Alignment and Motion Review, Oct. 22, Franz Peters Performance Test – Sector 10 Experience 2 Wires 30 Meter Length, 14 Monitors

Wire Position System LCLS Undulator Alignment and Motion Review, Oct. 22, Franz Peters Four day strip chart of wire to wall motion at Sector 10 Motion of wire end at one side, indicates wall motion on that side 5 Micromter / division Date Experience Noon to Noon Outsite average temperatures

Wire Position System LCLS Undulator Alignment and Motion Review, Oct. 22, Franz Peters Wall deforming at Sector-10 alignment tunnel over time. Analysis shows Experience

Wire Position System LCLS Undulator Alignment and Motion Review, Oct. 22, Franz Peters One Micrometer Wire to wall motion correlates with air temperature cycle Resolution Test… 0.7 Degree K Performance Air Temperature Wire Motion

Wire Position System LCLS Undulator Alignment and Motion Review, Oct. 22, Franz Peters Correlation of both curves indicates Drift << 100 Nm / day 100 Nanometer Drift Test 24 hour Ratio (Mon5a / Mon1a) = 19.8 / 0.7 = constant 24 hour period Performance Mon5a Mon1a Micrometer

Wire Position System LCLS Undulator Alignment and Motion Review, Oct. 22, Franz Peters 10 Micrometer / div Overall System Test - 32 Days of wall motion tracking Days 30 Meter wall Wire Access LINAC Performance

Wire Position System LCLS Undulator Alignment and Motion Review, Oct. 22, Franz Peters Resolution << 100 Nanometer in X & Y direction Instrument Drift << 100 Nanometer per day Summary As experience has shown…. Coming up activities…. Final integration into Undulator needs further engineering Hard- & Software has to be improved for latest updates System Test & Calibration Facility will be neseccary Long distance wire needs further R & D

Wire Position System LCLS Undulator Alignment and Motion Review, Oct. 22, Franz Peters Finally, were we are? 2 Wires, 14 Monitors – or 10 % of LCLS wire system is now working - Upper Wire Lower Wire One Micrometer / division Watching horizontal Sub-Micrometer wire motions, generated by Air Condition Hours End of presentation