1 Info 1409 Systems Analysis & Design Module Lecture 5 - Feasibility HND Year 1 2008/9 De Montfort University.

Slides:



Advertisements
Similar presentations
Chapter 2 Analyzing the Business Case.
Advertisements

Info1409 De Montfort University Lecture 3 The Systems Development Life Cycle Systems Analysis & Design Academic Year 2008/9.
Chapter 3 Managing the Information Systems Project
© 2005 by Prentice Hall Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Fourth Edition Jeffrey A. Hoffer Joey F.
System Analysis and Design
Systems Analysis and Design 9th Edition
Chapter 2.
Systems Development and Analysis
Info1409 De Montfort University1 Lecture 4 Analysing the Business Case (1) System Users and their needs Systems Analysis & Design Academic Year 2008/9.
Info /7 DMU1 Components of a system Systems Analysis & Design Academic Year 2008/9 Lecture 1.
Info /7 DMU1 The story so far… Systems Analysis & Design Academic Year 2008/9 Lecture 10.
Fundamentals of Information Systems, Second Edition
Info1409 De Montfort University1 Requirements Modelling Systems Analysis & Design Academic Year 2008/9 Info 1409 Lecture 7.
1 Info 1409 Systems Analysis & Design Module Lecture 8 – Modelling tools and techniques HND Year /9 De Montfort University.
Chapter 2.
Systems Development Life Cycle
Analyzing the Business Case
7.2 System Development Life Cycle (SDLC)
Fact-Finding Fact-Finding Overview
Feasibility Analysis Chapter 3
System Planning Analyzing the Business Case
1 Lecture 6 The Systems Analyst (Role and activities) Systems Analysis & Design Academic Year 2008/9.
©2003 Prentice Hall Business Publishing, Accounting Information Systems, 9/e, Romney/Steinbart 16-1 Accounting Information Systems 9 th Edition Marshall.
Chapter 2: Analyzing Business Case Phase 1: Systems Planning
© 2006 ITT Educational Services Inc. System Analysis for Software Engineers: Unit 5 Slide 1 Chapter 3 Managing the Information Systems Project.
Initiating and Planning Systems Development projects
Chapter 10.
1 BTEC HNC Systems Support Castle College 2007/8 Systems Analysis Lecture 9 Introduction to Design.
System Planning- Preliminary investigation
Module 4: Systems Development Chapter 13: Investigation and Analysis.
Business Information Systems Systems Analysis & Design Academic Year 2008/9 Lecture 2.
Information Systems Development. Outline  Information System  Systems Development Project  Systems Development Life Cycle.
Business Case Justification System Planning
Chapter 14 Information System Development
Computers Are Your Future © 2006 Prentice Hall, Inc.
Lecture 4 1 Introduction to Systems Planning Lecture 4 2 Objectives n Describe the strategic planning process n Explain the purpose of a mission statement.
1 BTEC HNC Systems Support Castle College 2007/8 Systems Analysis Lecture 13 Post-Implementation Training.
Lecture 3 Managing the Development Project SFDV Principles of Information Systems.
Prof. Mohammad Moizuddin
Systems Analysis Lecture 2 Analysing the Business Case Feasibility Scope 1 BTEC HNC Systems Support Castle College 2007/8.
Phase 1: Preliminary Investigation or Feasibility study
Chapter 2 Analyzing the Business case
IMAT1906 Systems Development Lecture week 6: systems analysis (1) : feasibility.
System Planning (Preliminary Investigation Overview)
Systems Analysis and Design 8 th Edition Chapter 2 Analyzing the Business Case.
Computers Are Your Future © 2008 Prentice Hall, Inc.
Topics Covered Phase 1: Preliminary investigation Phase 1: Preliminary investigation Phase 2: Feasibility Study Phase 2: Feasibility Study Phase 3: System.
IS Analysis and Design. SDLC Systems Development Life Cycle Break problems into management review stages Control cost and time Works best with well understood.
Project Management Cross lifecycle Activity
Topic 2 Analyzing the Business Case.  Describe the strategic planning process and why it is important to the IT team  Explain the purpose of a mission.
System Planning (Overview of Feasibility) System Planning (Overview of Feasibility) - Mr. Ahmad Al-Ghoul System Analysis and Design.
Lecture 21 Introduction to System Development Life Cycle - Part 1.
1 Systems Analysis & Design 7 th Edition Chapter 2.
Systems Analysis & Design 7 th Edition Chapter 2.
Systems Analysis Lecture 5 Requirements Investigation and Analysis 1 BTEC HNC Systems Support Castle College 2007/8.
Phase 1 Systems Planning
1 BTEC HNC Systems Support Castle College 2007/8 Systems Analysis Lecture 8 Moving from Analysis to Design Design Strategies.
Slide 1 Systems Analysis and Design with UML Version 2.0 An Object-Oriented Approach, Second Edition Chapter 3: Project Initiation.
CHAPTER 2 SYSTEM PLANNING DFC4013 System Analysis & Design.
Systems Development Life Cycle
Fundamentals of Information Systems, Sixth Edition
Principles of Information Systems Eighth Edition
Fundamentals of Information Systems, Sixth Edition
Initiating systems development
FORMAL SYSTEM DEVELOPMENT METHODOLOGIES
Systems Analysis and Design 10th Edition
Analyzing the Business Case
Introduction to Projects
Systems Analysis and Design
Systems Development Life Cycle
Presentation transcript:

1 Info 1409 Systems Analysis & Design Module Lecture 5 - Feasibility HND Year /9 De Montfort University

2 Objectives The objectives of this lecture are to build on our previous lecture (4) which explained the following 4 topics: Analyzing the Business Case Systems Requests Users and their requirements

3 Preliminary Investigation This lecture is concerned with the The Preliminary investigation stage of the S.D.L.C. This investigation stage follows the system request It includes a Feasibility study.

4 Lecture objectives By the end of this lecture you will: Have learned about the types of feasibility that need to be considered Have examined some of the techniques used in project management Been introduced to the preliminary investigation model.

5 Project Planning The Preliminary investigation is conducted by the Systems Analyst who follows a series of steps. Sometimes project management tools are used (e.g. Microsoft Project software)

6 Microsoft Project enables a project manager to define project tasks, list activities and participants, plan the sequence of work, estimate project milestone dates, and track all costs. Fig 2.11 Shelley et al

7 Project software Specialist software also provides a way of documenting the request formally The following slide shows an example of an on-line request form. Managers and analysts can then examine this to determine just what is required.

8 Example of an on-line request form

9 Risk Management Every IT project involves risks. A risk is an event which could affect the project negatively Risk management is the process of identifying, controlling and evaluating risks. Risk management also involves information handling.

10 Evaluation of request In order to evaluate the system request Often a group of key managers and users form a systems revue committee The objective is to use their combined judgment and experience to evaluate the project.

11 Feasibility Studies A system request must pass a series of tests The results of these tests form the ‘Feasibility study’ The feasibility study will help to decide whether to proceed or not.

12 The need for Feasibility studies Figure 2.13 on the following slide shows that a feasibility study uses 4 main yardsticks to measure a proposal. (figure 2.12 taken from text book Shelley et al) & student learning tool.

13 We will examine each of these in turn in the following slides

14 Operational Feasibility Operational feasibility means that the proposed system will be used effectively after it has been developed. Questions: Will users have difficulty with the new system? Will it provide the expected benefits?

15 Technical Feasibility Technical Feasibility refers to the technical resources needed to develop, purchase, install or operate the system. Questions: Does the company have the necessary hardware, software and network resources? Does the company have the needed technical expertise?

16 Economic Feasibility Economic feasibility means that the projected benefits will outweigh the estimated costs of the project. Questions: What are the tangible benefits? What is the cost of developing/not developing the system? What are the intangible benefits?

17 Schedule Feasibility Schedule feasibility means that the project can be implemented in an acceptable time. Questions: Has management established a firm timetable for the project? Will an accelerated schedule pose any risks? Might these risks be acceptable?

18 Setting Priorities The work of the systems revue committee includes the following: Rejecting system requests that are not feasible. Giving highest priority to projects that provide the greatest benefits. Setting the priorities.

19 Preliminary Investigation Overview P63 Shelley et al

20 Activities time The first 19 slides describe the process of project management from a system request to the completion of the preliminary investigation. Working in twos, create a model to show these initial stages. Use rectangles for the stages and list the activities in each. You only have 5 mins.

21 Feedback time: What stages did you identify? This is your chance to comment or feedback – Use it!

22 Preliminary Investigation planning Before the Investigation begins the Analyst needs to plan the process. Planning the investigation involves a number of steps.

23 P64 Shelley et al

24 Completion of stage 1 The investigation is completed when: The system request has been evaluated Priorities are set A feasibility report has been prepared and sent to management Management have considered the available options and made a decision.

25 Analysis Activities The exact procedure for the preliminary investigation depends upon the following: 1. The nature of the request 2. the size of the project 3. the degree of urgency (The activities of the Analyst will be examined in more detail in later Lectures).

26 In conclusion At the end of this lecture you have : Been introduced to the different types of feasibility Examined the techniques used in the preliminary investigation stage. Know what is meant by the preliminary investigation model

27 Background reading (Phase 1)– Chapter 2 Systems Analysis & Design. Shelley Cashman and Rosenblatt 6 th/7th Edition Thomson Course Technology 2006/7