East Coast vs. West Coast: A Documentation of Model Forecast Failures for Eta, NAM, GFS, GEM, and ECMWF Garrett Wedam Lynn McMurdie, Cliff Mass.

Slides:



Advertisements
Similar presentations
Slide 1ECMWF forecast User Meeting -- Reading, June 2006 Verification of weather parameters Anna Ghelli, ECMWF.
Advertisements

Slide 1ECMWF forecast products users meeting – Reading, June 2005 Verification of weather parameters Anna Ghelli, ECMWF.
Chapter 13 – Weather Analysis and Forecasting
Mei Xu, Jamie Wolff and Michelle Harrold National Center for Atmospheric Research (NCAR) Research Applications Laboratory (RAL) and Developmental Testbed.
ECMWF long range forecast systems
Note: This product is published by the Oregon Department of Agriculture (ODA), in cooperation with the Oregon Department of Forestry (ODF). Contact: Pete.
Operational Forecasting and Sensitivity-Based Data Assimilation Tools Dr. Brian Ancell Texas Tech Atmospheric Sciences.
NCEP Model Comparisons over the East and West Coast of the US Lynn McMurdie Garrett Wedam Cliff Mass May 27, 2009 Wedam, McMurdie and Mass, 2009: Comparison.
Description and Preliminary Evaluation of the Expanded UW S hort R ange E nsemble F orecast System Maj. Tony Eckel, USAF University of Washington Atmospheric.
Using ensemble data assimilation to investigate the initial condition sensitivity of Western Pacific extratropical transitions Ryan D. Torn University.
Lessons in Predictability: Part 2 The March 2009 “Megastorm” Michael J. Bodner, NCEP/HPC Camp Springs, MD Richard H. Grumm, NWS WFO State College, PA Neil.
Revolutions in Remote Sensing Greatly Enhanced Weather Prediction from the 1950s Through Today.
An Investigation of Cool Season Extratropical Cyclone Forecast Errors Within Operational Models Brian A. Colle 1 and Michael Charles 1,2 1 School of Marine.
National Centers for Environmental Prediction (NCEP) Hydrometeorlogical Prediction Center (HPC) Forecast Operations Branch Winter Weather Desk Dan Petersen.
Real-time WRF EnKF 36km outer domain/4km nested domain 36km outer domain/4km nested domain D1 (36km) D2 (4km)
Brian Ancell, Cliff Mass, Gregory J. Hakim University of Washington
United States Coast Guard 1985 Evaluation of a Multi-Model Storm Surge Ensemble for the New York Metropolitan Region Brian A. Colle Tom Di Liberto Stony.
GFS (left), ECMWF (right) 500 mb Height, Winds, and Temp 00 hr forecast valid 12z 24 Dec 2010.
Verification of Numerical Weather Prediction systems employed by the Australian Bureau of Meteorology over East Antarctica during the summer season.
GFS (green), ECMWF (blue) 500 mb height 00 hr forecasts 12z 24 Dec
CSTAR Update: New Tools for More Efficient Use of Ensembles in Operations Brian A. Colle, Minghua Zheng, and Edmund K.M. Chang, School of Marine and Atmospheric.
MOS Performance MOS significantly improves on the skill of model output. National Weather Service verification statistics have shown a narrowing gap between.
The Blizzard Discussion 1.Summary Discussion a. Medium Range Issues (Days 4-7) b. Short-Range Issues c. Ensemble trends d. Upstream differences.
Ensemble Post-Processing and it’s Potential Benefits for the Operational Forecaster Michael Erickson and Brian A. Colle School of Marine and Atmospheric.
GDAS analysis 500 mb height/absolute vorticity 00z 24 Dec 2010.
Chapter 13 – Weather Analysis and Forecasting. The National Weather Service The National Weather Service (NWS) is responsible for forecasts several times.
Phillip Bothwell Senior Development Meteorologist-Storm Prediction Center 3 rd Annual GOES-R GLM Science Meeting Dec. 1, 2010 Applying the Perfect Prog.
February 6, 2012 Verification Western California Dan Tomaso, Tyler Roys, & Brian Clavier.
An Overview of the UK Met Office Weymouth Bay wind model for the 2012 Summer Olympics Mark Weeks 1. INTRODUCTION In the summer of 2012 a very high resolution.
Sensitivity of NCEP GFS Forecast of Hurricane Sandy to Model Configuration and Supplemental Radiosondes Fanglin Yang IMSG -- Environmental Model Center.
Forecast Skill and Major Forecast Failures over the Northeastern Pacific and Western North America Lynn McMurdie and Cliff Mass University of Washington.
National Weather Service Model Flip-Flops and Forecast Opportunities Bernard N. Meisner Scientific Services Division NWS Southern Region Fort Worth, Texas.
“Nature Run” Diagnostics Thomas Jung ECMWF. Another “Nature Run” A large set of seasonal T L 511L91 integrations has been carried out for many summers.
Towards an object-oriented assessment of high resolution precipitation forecasts Janice L. Bytheway CIRA Council and Fellows Meeting May 6, 2015.
Forecast Pressure. Pressure Observations ASOS is the best…the gold standard Ships generally the worst.
© Crown copyright Met Office Plans for Met Office contribution to SMOS+STORM Evolution James Cotton & Pete Francis, Satellite Applications, Met Office,
Vaisala/University of Washington Real-observation Experiments Vaisala/University of Washington Real-observation Experiments Clifford Mass, Gregory Hakim,
OUTLINE Current state of Ensemble MOS
61 st IHC, New Orleans, LA Verification of the Monte Carlo Tropical Cyclone Wind Speed Probabilities: A Joint Hurricane Testbed Project Update John A.
Verification of Global Ensemble Forecasts Fanglin Yang Yuejian Zhu, Glenn White, John Derber Environmental Modeling Center National Centers for Environmental.
Model Post Processing. Model Output Can Usually Be Improved with Post Processing Can remove systematic bias Can produce probabilistic information from.
1 Results from Winter Storm Reconnaissance Program 2008 Yucheng SongIMSG/EMC/NCEP Zoltan TothEMC/NCEP/NWS Sharan MajumdarUniv. of Miami Mark ShirleyNCO/NCEP/NWS.
1 Results from Winter Storm Reconnaissance Program 2007 Yucheng SongIMSG/EMC/NCEP Zoltan TothEMC/NCEP/NWS Sharan MajumdarUniv. of Miami Mark ShirleyNCO/NCEP/NWS.
The Similar Soundings Technique For Incorporating Pattern Recognition Into The Forecast Process at WFO BGM Mike Evans Ron Murphy.
Y. Fujii 1, S. Matsumoto 1, T. Yasuda 1, M. Kamachi 1, K. Ando 2 ( 1 MRI/JMA, 2 JAMSTEC ) OSE Experiments Using the JMA-MRI ENSO Forecasting System 2nd.
Use of Mesoscale Ensemble Weather Predictions to Improve Short-Term Precipitation and Hydrological Forecasts Michael Erickson 1, Brian A. Colle 1, Jeffrey.
APPLICATION OF NUMERICAL MODELS IN THE FORECAST PROCESS - FROM NATIONAL CENTERS TO THE LOCAL WFO David W. Reynolds National Weather Service WFO San Francisco.
Ensemble variability in rainfall forecasts of Hurricane Irene (2011) Molly Smith, Ryan Torn, Kristen Corbosiero, and Philip Pegion NWS Focal Points: Steve.
Predictability of High Impact Weather during the Cool Season: CSTAR Update and the Development of a New Ensemble Sensitivity Tool for the Forecaster Brian.
Exploring Multi-Model Ensemble Performance in Extratropical Cyclones over Eastern North America and the Western Atlantic Ocean Nathan Korfe and Brian A.
Using TIGGE Data to Understand Systematic Errors of Atmospheric River Forecasts G. Wick, T. Hamill, P. Neiman, and F.M. Ralph NOAA Earth System Research.
NCEP CMC ECMWF MEAN ANA BRIAN A COLLE MINGHUA ZHENG │ EDMUND K. CHANG Applying Fuzzy Clustering Analysis to Assess Uncertainty and Ensemble System Performance.
10th COSMO General Meeting, Cracow, Poland Verification of COSMOGR Over Greece 10 th COSMO General Meeting Cracow, Poland.
DOWNSCALING GLOBAL MEDIUM RANGE METEOROLOGICAL PREDICTIONS FOR FLOOD PREDICTION Nathalie Voisin, Andy W. Wood, Dennis P. Lettenmaier University of Washington,
Verification methods - towards a user oriented verification The verification group.
Forecast Pressure. Pressure Observations ASOS is the best…the gold standard Ships generally the worst.
Impacts of Land Effects and Improvements in Modeling Landfall Using HWRF A Joint Hurricane Testbed (JHT) Program Robert E. Tuleya, Yihua Wu, VijayTallapragada,
Weather Regimes and Forecast Errors in the Pacific Northwest Lynn McMurdie (co-author Joe Casola) University of Washington.
1 MODIS winds assimilation experiments and impact studies to date at the Met Office Howard Berger, Mary Forsythe, Met Office, Bracknell/Exeter, UK UW-CIMSS.
Medium Range Forecasting at the Weather Prediction Center (WPC) –
Plans for Met Office contribution to SMOS+STORM Evolution
The Seasonality of Belief:
Update on the Northwest Regional Modeling System 2013
Dan Petersen Bruce Veenhuis Greg Carbin Mark Klein Mike Bodner
The Stone Age Prior to approximately 1960, forecasting was basically a subjective art, and not very skillful. Observations were sparse, with only a few.
Forecast Pressure.
Forecast Pressure.
Lidia Cucurull, NCEP/JCSDA
New Developments in Aviation Forecast Guidance from the RUC
Adam J. O’Shay and T. N. Krishnamurti FSU Meteorology 8 February 2001
Presentation transcript:

East Coast vs. West Coast: A Documentation of Model Forecast Failures for Eta, NAM, GFS, GEM, and ECMWF Garrett Wedam Lynn McMurdie, Cliff Mass

72-hour NAM Forecast: Ridging 1024 mb contour 72-hr NAM forecast with Obs verification Valid Dec 24,

72-hour Reality: Low Center 00-hr NAM analysis and obs verification Dec 24, mb contour

72-hour forecast errors –Eta/NAM: 24.1 mb –CMC-GEM: 14.4 mb –ECMWF: 10.0 mb –GFS: 3.2 mb 48-hour forecast errors –Eta/NAM: 13.7 mb –CMC-GEM: 9.1 mb –ECMWF: 7.6 mb –GFS: 1.5 mb 24-hour forecast errors –Eta/NAM: 4.7 mb –CMC-GEM: 2.4 mb –ECMWF: 2.7 mb –GFS: -0.2 mb GFS 72-hour forecast verifying Verifying buoy

72-hour Forecast: Low Center 72-hr NAM forecast with Obs verification Valid Dec 24, mb contour

72-hour Reality: Ridging 00-hr NAM Analysis and Obs verification Dec 24, mb contour

Method Directly compare observations to interpolated model forecasts Emphasize East and West Coasts –Buoys eliminate terrain effects Emphasize Sea Level Pressure comparisons –SLP is good indicator of model performance (i.e., storm strength and location can be defined and compared using SLP) –Insufficient off-coast upper-level observations

Method Useful Tools for Comparing Forecast Skill –Mean Absolute Error (MAE) –Mean Error, or Bias (ME) –Frequency of Errors which exceed an arbitrary “Large Error” criterion (different for 24, 48, 72-hr forecasts) –Timelines of said “Large Errors” to cross-reference failure dates between models –Error Histograms to compare distributions and sizes of largest errors

Matching Variance in Sea Level Pressure:

Eta to WRF-NAM operational switchover > 7 mb > 5 mb > 3 mb West Coast: Number of Large Errors by model and month

East Coast: Number of Large Errors by model and month CMC - GEM major model update. Included: increase in vertical and horizontal resolution, new physics scheme, decreased time step, data assimilation changes

Number of Large Errors: West Coast *minus* East Coast

Mean Absolute Error: West Coast *minus* East Coast For reference, typical MAE values: GFS West Coast average for winter 2006/07: 24-hr: 1mb; 48-hr: 1.4 mb; 72-hr: 2.0 mb

Comparing models: East Coast Mean Absolute Error *Standardized* to ECMWF CMC – GEM update

Comparing models: West Coast Mean Absolute Error *Standardized* to ECMWF

Results Comparing models: ECMWF generally outperforms and NAM underperforms others. There are indications that a CMC-GEM model update significantly improved some forecasts, and that GFS has not performed as well this season as the past season. More “forecast bust” events occur on the West than East Coast for 24, 48, and 72 hour forecasts The East Coast is better forecast in terms of MAE in sea level pressure

Dates of Large Forecast Errors (by model) Errors greater than 5 mb On the Horizon

Forecast Failures can be a result of initialization errors, insufficient “realism” of the model, and other model inadequacies. Knowing the most common causes of failure for high-impact forecast failures can help determine policy: do we invest more in improving models or in a new observation buoy? One cause of failure is High Model Sensitivity…

On the Horizon Courtesy of Ryan Torn

On the Horizon

Thirty-four of 420 forecasts showed the highest sensitivity Nineteen of the 34 “sensitive” cases (55%) resulted in multiple models meeting “large error criterion” Compare to: 10-20% of all forecasts result in multiple models meeting “large error criterion”  motivates a more formal investigation!

On the Horizon Picture from fijaciones.org Are Two Winters Representative? Currently adding data from 2004/05 and remainder of 2006/07 to further examine year-to-year variability in forecast skill What About The Rest of the Country? And Beyond? Will examine open-ocean buoys, and land sites; over land will use 850 mb observations instead of SLP What Are the Features of “Busts”: Forecast failures with high impacts on people still occur. What are their features? And why do some models fail when others don’t?

East Coast vs. West Coast: A Documentation of Model Forecast Failures for Eta, NAM, GFS, GEM, and ECMWF Garrett Wedam Lynn McMurdie, Cliff Mass Thank You!