ARIES-General Page 1 Summary of Findings of Lehman Committee to Assess ITER Costing L. Waganer The Boeing Company 8-10 January 2003 ARIES Meeting at UCSD.

Slides:



Advertisements
Similar presentations
Guidance Note on Joint Programming
Advertisements

RC Strategy Implementation. What we are asking for… Authorization to hire Black and Veatch to develop and issue the two RFPs associated with the RC Strategic.
Regional Policy EUROPEAN COMMISSION 1 EGTC regulation EGTC regulation ESF and EGTC regulations Regulation of the European Parliament and of the Council.
RESEARCH PROPOSAL DR.URJA MANKAD.
Writing Proposals for Oak Ridge National Laboratory Women-Owned Small Business Day Sonny Rogers Contract Services Group Manager Oak Ridge, TN August 24,
1 Use and content of the RFP  Request for Proposals (RFP) is similar to bidding documents and include all information of the assignment, selection of.
4. 2Object-Oriented Analysis and Design with the Unified Process Objectives  Explain the elements of project management and the responsibilities of a.
State of Kansas Statewide Financial Management System Pre-Implementation Project Steering Committee Meeting January 11, 2008.
The BIM Project Execution Planning Procedure
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO Survey on Institutional Arrangements for NMHSs.
Module 12 STEPS 6 & 7 Negotiation of PMP/FCSA and Execution of Feasibility Cost Sharing Agreement Civil Works Orientation Course - FY 11.
Report of the Burning Plasma Program Advisory Committee S.C. Prager November, 2003.
From Research Prototype to Production
Module 10 Session 10.4 Visual 1 Module 10 Organizing Procurement Session 10.4 Procurement of Services: Use of Consultants and Developing Terms of Reference.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
S10 CONS5Q25 Lara Tookey. Review of estimators workings Decision on what margin to apply Bid submission details Submit your Tender.
Kaname Ikeda, October Status of the ITER Project Status of the ITER Project Kaname Ikeda ITER Nominee Director-General October 2006.
OFFICE OF SCIENCE 1 Closeout Presentation and Final Report Procedures.
FAO/WHO Codex Training Package Module 2.6 FAO/WHO CODEX TRAINING PACKAGE SECTION TWO – UNDERSTANDING THE ORGANIZATION OF CODEX 2.6 How does Codex elaborate.
IAEA International Atomic Energy Agency. IAEA Outline LEARNING OBJECTIVES FIRST THINGS FIRST Invitation of a mission Information meeting self-assessment.
Ways for Improvement of Validity of Qualifications PHARE TVET RO2006/ Training and Advice for Further Development of the TVET.
In-Kind Contribution Management Update Allen Weeks March 20, Lund.
An Introduction to World Bank Organization and Operations Jean-Charles Crochet Senior Transport Economist World Bank.
OFFICE OF SCIENCE 1 3. Cost Estimate Gines, Fisher 2.Are the estimated cost and proposed schedule ranges realistic, consistent with the technical and budgetary.
AES, ANL, Boeing, Columbia U., CTD, GA, GIT, LLNL, INEEL, MIT, ORNL, PPPL, SNL, SRS, UCLA, UCSD, UIIC, UWisc FIRE Collaboration FIRE.
IAEA International Atomic Energy Agency. IAEA Outline LEARNING OBJECTIVES REVIEW TEAM AND COUNTERPARTS Team Composition Qualification PREPARATORY PHASE.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Alexei Fedotov Project Management.
Experience of Trade in Services: EU Member‘s perspective Brigitte Lüth Attachée, Permanent Delegation of Austria to the WTO.
LBNE Working Group Meeting December 20, :00– 5:00 PM Snake Pit.
U.S. Industry Interests in ITER Presented at the FPA Annual Meeting 19 November 2003 Bob Iotti.
IT 499 Bachelor Capstone Week 4. Adgenda Administrative Review UNIT Four UNIT Five Project UNIT Six Preview Project Status Summary.
Preparation of future ENI CBC programmes - State of Play Vanessa De Bruyn (DG DEVCO) 3 December 2012.
U.S. Department of Energy’s Office of Science 20 th Meeting of the IEA Large Tokamak ExCo, May th Meeting of the IEA Poloidal Divertor ExCo, May.
Fundamentals of Information Systems, Second Edition 1 Systems Development.
Professional Certificate in Electoral Processes Understanding and Demonstrating Assessment Criteria Facilitator: Tony Cash.
Geographical Enlargement of CERN Associate membership Principles and criteria S. Intoudi / 8 July
NCSX Systems Engineering Management Plan Peer Review Bob Simmons May 15, 2003.
Status Report on ILC Project in Japan Seiichi SHIMASAKI Director, Office for Particle and Nuclear Research Promotion June 19, 2015.
IAEA International Atomic Energy Agency. IAEA Outline LEARNING OBJECTIVES FIRST THINGS FIRST Invitation of a mission Information meeting self-assessment.
OFFICE OF SCIENCE 1 Closeout Presentation and Final Report Procedures.
PUBLIC–PRIVATE PARTNERSHIP (PPP) FRAMEWORK AND GUIDELINES Syed M. Ali Zaidi, P.Eng. PM(Stanford), Ph.D. Director, Strategic Partnerships Alberta Infrastructure.
TSG-S OMA (Open Mobile Alliance) Ad-Hoc Report Richard Robinson Chair - 3GPP2 TSG-S SC B_Eshwar Pittampalli’s (Lucent) comments/concerns embedded.
Length Mass Prepackages Health Environment Safety Trade Volumes Flow Energy Pressure Concentration Enforcement R. Schwartz, 46. CIML Acceptance.
1 May 30, 2007 U.S. – China Symposium on Active Industry Participation in Standardization Overview of U.S. Participation in ISO and IEC.
IAEA International Atomic Energy Agency. IAEA Outline LEARNING OBJECTIVES REVIEW TEAM AMD COUNTERPARTS Team Composition Qualification PREPARATORY PHASE.
Fundamentals of Governance: Parliament and Government Understanding and Demonstrating Assessment Criteria Facilitator: Tony Cash.
OFFICE OF SCIENCE 1 Closeout Report on the DOE/SC CD-3b Review of the Utilities Upgrade Project (UUP) Fermi National Accelerator Laboratory August 11-12,
Inception Report: 21st March, 2012
EVALUATION OF THE SEE SARMa Project. Content Project management structure Internal evaluation External evaluation Evaluation report.
PPPL is Committed to the Success of NCSX Rob Goldston, Director Princeton Plasma Physics Laboratory August 15, 2007.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
GAO’s Cost and Schedule Assessment Guides U.S. Government Accountability Office Applied Research and Methods Cost Engineering Sciences Jason T Lee, Assistant.
U.S. Department of Agriculture eGovernment Program Enabler’s Steering Committee Meeting January 9 th, 2003.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
INTERNATIONAL ELECTROTECHNICAL COMMISSION «Harmonization of the national accreditation system of Eurasian countries» 23 December 2013 Moscow World Trade.
Cost and Schedule Paul Weinman Pacific Northwest National Laboratory.
OFFICE OF SCIENCE DOE/SC CD-2/3b Review of the Muon to Electron Conversion Experiment (Mu2e) Project Fermi National Accelerator Laboratory February 4,
OFFICE OF SCIENCE DOE/SC CD-3c Review of the Muon to Electron Conversion Experiment (Mu2e) Project Fermi National Accelerator Laboratory June 14-16, 2016.
Compliance with CCNA F.S..  Advertisement  Longlist  Shortlist  Request for Proposal  Scope of Services Meeting  Technical Proposal Review.
CMGT 410 aid Education Begins/cmgt410aid.com
Overview of U.S. Participation in ISO and IEC
CMGT 410 Education for Service-- snaptutorial.com.
CMGT 410 AID Perfect Education/ cmgt410aid.com.
CMGT 410 HOMEWORK Perfect Education/ cmgt410homework.com.
CMGT 410 Teaching Effectively-- snaptutorial.com.
CMGT 410 HOMEWORK Education for Service-- cmgt410homework.com.
Standards and Certification Training
BASIC IRRS TRAINING Lecture 14
Project Management Considerations
Presentation transcript:

ARIES-General Page 1 Summary of Findings of Lehman Committee to Assess ITER Costing L. Waganer The Boeing Company 8-10 January 2003 ARIES Meeting at UCSD

ARIES-General Page 2 Background The DOE-sponsored 2002 Fusion Summer Study was held in Snowmass Colorado, July 8-19, 2002 – One of the key purposes was to have critical discussion and review of the candidate burning plasma options: ITER, FIRE and IGNITOR The cost of ITER was based on very detailed engineering data and is used to establish a “relative value” to facilitate international negotiations on task sharing There was no explicit contingency in the ITER estimates The total ITER value, expressed in US 2002$, would be ~ $5B On 31 Oct 02, Dr. Raymond Orbach, Dir of Office of Science, asked Dr. Daniel Lehman, Dir of Constr Mgmt Support Division, to assemble a Committee to critically assess the cost of ITER

ARIES-General Page 3 ITER Cost Assessment Committee Members Department of Energy Daniel Lehman, DOE/SC, Chair Stephen Meador, DOE/SC Consultants Michael Harrison, BNL Brad Nelson, ORNL Lester Price, DOE/ORO Michael Williams, PPPL James Yeck, DOE/CH Advisors Joel Schultz, MIT Lester Waganer, Boeing Observers Warren Marton, DOE/SC Michael Holland, OSTP [part-time] SC is Office of Science ORO is Oak Ridge Operations CH is Chicago Operations OSTP is Office of Science and Technology Policy, Executive Office of the President

ARIES-General Page 4 Meeting Agenda Thursday, 11/21/02 Met with ITER Technical Representatives Friday, 11/22/02 Met with Dr. Aymar to Discuss ITER Cost Basis Saturday, 11/23/02Continued Cost Discussions w/ Dr. Aymar and Tech Staff Sunday, 11/24/02Wrote Draft Report and Clarified Costing Details Monday, 11/25/02Refined Draft, Reviewed w/ Dr. Aymar, Finalized Report

ARIES-General Page 5 Conclusions The Committee concluded that the ITER Team has prepared a complete cost estimate that is based on sound management and engineering principles, and is credible as a basis for establishing relative contributions by the Parties to the construction of ITER. The estimate is a synthesis by the ITER Team of multiple international industrial cost estimates for each of 85 procurement packages covering essentially the entire project; it includes a normalization of material and labor cost rates in various countries, and it emphasizes the value of individual components relative to each other. It is not comparable to a traditional DOE construction project cost estimate. The credibility of such a value estimate is supported by the design and R&D results that are unusually mature for a science project facing the decision to fund construction.

ARIES-General Page 6 Conclusions, Continued Because multiple Parties would construct the ITER project, with each responsible for procurements of in-kind hardware in its own territory with its own currency, a direct conversion of the ITER value estimate into a single currency is not particularly relevant; nevertheless, it is possible. Converting to U.S. dollars, the total would be about $5 Billion (constant 2002 dollars) for the base estimate. –$4 Billion for ITER hardware, initial spares, buildings, and installation and assembly of the hardware into the buildings –$1Billion for project management and engineering support during construction, R&D during construction, and commissioning. The U.S. considers commissioning to be part of the project period while the current ITER Parties consider it to be part of the operation period.

ARIES-General Page 7 Conclusions, Continued Several of the current Parties have gone beyond the direct conversion process and prepared their own full cost estimate. European Union personnel presented the conclusions of their cost estimate to the Committee. Their analysis indicated close agreement with the ITER value estimate to within a few percent, although individual component costs varied by somewhat larger percentages. The current ITER Parties agree that the ITER value estimate is appropriate for establishing relative contributions by the Parties to the construction of ITER. –They are now negotiating an arrangement for sharing project scope on that basis, with the understanding that each Party would be financially responsible for their in-kind hardware contributions.

ARIES-General Page 8 Conclusions, Continued The Committee concluded that in the event the U.S. decides to join the current negotiations, it should prepare, as soon as possible, its own cost estimate for a set of procurement packages for components the U.S. would be interested in providing. –Such a cost estimate should conform to current DOE project management procedures, including appropriate contingency and escalation cost. In addition, similar cost estimates should be prepared for the other types of potential U.S. contributions to ITER for common expenses ( including contingency and escalation), such as : –Personnel assigned to the Central Team and Field Team –Common procurements (e.g., VV, Cryostat, Rad. Waste, Buildings)

ARIES-General Page 9 Summary The Committee concluded that the ITER Team has prepared a complete cost estimate that is based on sound management and engineering principles, and is credible as a basis for establishing relative contributions by the Parties to the construction of ITER. The proposed schedule developed by the ITER Team is reasonable. The management arrangements now being negotiated are critical to the project’s success.