Machine/Detector interface (MDI) Summary J. Haba KEK.

Slides:



Advertisements
Similar presentations
S. N. HOM Impedance in Vacuum … 1 of 40 Sasha Novokhatski SLAC, Stanford University Machine-Detector Interface Joint Session April 22, 2005 HOM Impedance.
Advertisements

KEK Update on the status of the electron cloud studies at KEKB Contents Brief review of our studies Updates Clearing electrode Groove structure SEY measurement.
Upgrade Plan of KEKB Vacuum system Pre-kickoff KEK1 Y. Suetsugu KEKB Vacuum Group Contents Challenges for vacuum system Designs for.
Background issues in the KEKB
R&D Plan on Clearing Electrode using the KEKB LER Y. Suetsugu and H. Fukuma, KEKB M. Pivi and L. Wang, SLAC at KEK.
M. Sullivan Mini-workshop on the MEIC design Nov 2, 2012.
Super B factory plan at KEK Masa Yamauchi KEK Super B Factory Workshop April 20-22, 2005 Honolulu Why, how, what, who, when and how much?
IR Magnets for SuperKEKB KEK, Norihito Ohuchi 1.IR Magnets (ES, QCS, QC1) 2.Interference between Magnet-Cryostats and Belle 3.Summary SuperB.WS05.Hawaii.
SuperKEKB IR Design Y. Funakoshi (KEK).
Super-B Factory Workshop April 20-23, 2005 Super-B IR design M. Sullivan 1 Status on an IR Design for a Super-B Factory M. Sullivan for the Super-B Factory.
Gas-based tracking for SuperBelle Beam background Upgrade plan Summary Shoji Uno (KEK) April, 20-22, nd Joint Super B factory WS in Hawaii.
Beam Background at Super-KEKB/Belle Osamu Tajima (KEK) Apr 21, nd Joint Super B factory work shop.
Current BG Status at Belle Osamu Tajima ( Tohoku univ ) Assumption in this talk 100days-operation / yr 1nTorr CO pressure in simulation HER / LER = 1.1.
Super-B Factory Workshop January 19-22, 2004 Beam pipes M. Sullivan 1 Detector Beam Pipe Diameter Discussion M. Sullivan Super-B Factory Workshop Hawaii.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
Super-B Factory Workshop January 19-22, 2004 IR Upgrade M. Sullivan 1 PEP-II Interaction Region Upgrade M. Sullivan for the Super-B Factory Workshop Hawaii.
Super-B Factory Workshop January 19-22, 2004 Accelerator Backgrounds M. Sullivan 1 Accelerator Generated Backgrounds for e  e  B-Factories M. Sullivan.
Super-B Factory Workshop January 19-22, 2004 Super-B IR design M. Sullivan 1 Interaction Region Design for a Super-B Factory M. Sullivan for the Super-B.
Machine Detector Interface Summary Junji Haba, KEK.
Synchrotron Radiation (SR) in Super-KEKB / Belle Osamu Tajima ( Tohoku univ )
Vacuum Pressures at IR Contents Y.Suetsugu KEKB Vac. Group 1.Outline of Vacuum System at IR 2.Behavior of Pressures 3.Remedies for Heating of Vacuum Components.
Future Very High Luminosity Options for PEP-II John T. Seeman For the PEP-II Team e+e- Factories Workshop October 13-16, 2003.
Operational Experience with machine backgrounds at KEKB 23 September 2003 T.Tsuboyama (KEK)
1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1.
BDS 11 Vacuum System for BDS [Completeness of RDR] Y. Suetsugu J. Noonan and P. Michelato Design principle Basic design Cost estimation.
IR summary M. Sullivan Nov. 3, 2011 JLAB MEIC IR workshop.
PEP-II Machine Advisory Committee Meeting SLAC, April 15-17, 2004 HOM Issues in LER Ring and IR. Recent measurements and calculations. Sasha Novokhatski.
SuperKEKB Vacuum System - for the positron ring - Y. Suetsugu KEKB Vacuum Group Outline Design and production status of key components Beam pipes for arc.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
26-October-2006 PEP-II MAC Session HOM measurement and analysis S. Weathersby, A. Novokhatski HOMs in LER region 4: overview, history Collimator wake fields.
Page 1 Overview and Issues of the MEIC Interaction Region M. Sullivan MEIC Accelerator Design Review September 15-16, 2010.
LCWS2004 Paris 1 Beam background study for GLC Tsukasa Aso, Toyama College of Maritime Technology and GLC Vertex Group H.Aihara, K.Tanabe, Tokyo Univ.
Beam Induced Pressure Rise in Ring, Dec. 9-12, Beam Induced Pressure Rise in Ring ~ Experiences in KEK B-Factory ~ 1. Introduction :KEK.
Tsukuba-hall webcam 1 Beam Pipe and Vertex Detector extraction: on Nov. 10, 2010 Belle Detector Roll-out: Dec. 9, 2010 End-caps, CDC, B-ACC, TOF extraction:
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) Dec.
Impact parameter resolutions for ILC detector Tomoaki Fujikawa (Tohoku university) ACFA Workshop in Taipei Nov
Interaction Region Backgrounds M. Sullivan for the MEIC Collaboration Meeting Oct. 5-7, 2015.
Recent Electron-Cloud Mitigation Studies at KEK E-cloud mitigation mini-workshop on November at CERN Kyo Shibata (for KEKB Group)
Interaction Region Issues M. Sullivan for the EIC User Group Meeting Jan. 6-9, 2016.
SKEKB Mini Work SKEKB Vacuum System – Arc Section – Contents Y.Suetsugu KEKB Vacuum Group 1.Beam Chambers 2.Pumps: Pump, Pressure,
1 M. Sullivan IR update IR Update M. Sullivan for the 3 rd SuperB workshop SLAC June14-16, 2006.
2007/09/17-21 SLAC IRENG07 1 A Basic Design of IR Vacuum system Y. Suetsugu, KEK Possibility of a pumping system without in-situ baking at z < L*
CDC Upgrade Beam background Simulation study Idea for upgrade Upgrade plan Summary Shoji Uno (KEK) Mar-20 th, 2008.
ILC IP SR and PEP-II M. Sullivan for the ILC IR engineering workshop IRENG07 Sept 17-21, 2007.
Electron cloud study for ILC damping ring at KEKB and CESR K. Ohmi (KEK) ILC damping ring workshop KEK, Dec , 2007.
Updates of EC Studies at KEKB 1.EC studies at KEKB 2.Recent results 1.Clearing Electrode 2.Groove surface 3.TiN coating 4.Measurement of EC in solenoid.
9 October 2003S. DeBarger PEP-II Vacuum Status PEP-II Machine Advisory Committee.
Beam Background Simulation at Belle/KEKB Motivation SR background Particle background Feedback to the detector design SR alarm Summary O. Tajima (Tohoku.
Present status of production target and Room design Takashi Hashimoto, IBS/RISP 2015, February.
2008/12/10 INFN R&D on Low Impedance Beam Chamber and Components Y. Suetsugu, for KEKB Vacuum Group Contents Introduction Beam Chamber Components Connection.
Initial Study of Synchrotron Radiation Issues for the CEPC Interaction Region M. Sullivan SLAC National Accelerator Laboratory for the CEPC14 Workshop.
E+/e- Backgrounds at BEPCII/BESIII JIN Dapeng Aug. 22, 2011.
2007/09/17 SLAC IRENG07 1 Comment on IR Vacuum system Y. Suetsugu Pumping System without in-situ baking at z < L*
Further SR Studies for the Electron Polarimeter M. Sullivan for the JLEIC Collaboration Meeting Oct. 5-7, 2016.
JLEIC MDI Update Michael Sullivan Apr 4, 2017.
M. Sullivan Apr 27, 2017 MDI meeting
Update of the SR studies for the FCCee Interaction Region
M. Sullivan International Review Committee November 12-13, 2007
Measurement of Electron Cloud in KEKB LER with RFA
The Interaction Region
Vacuum System Failures at HERA
E. Paloni, S. Bettoni, R. Pantaleo, M Biagini, et al.
The PEP-II Interaction e+e- Factories Workshop
Francesco Forti SuperB Workshop LNF, March, 2006
Interaction Region Design Options e+e- Factories Workshop
Accelerator R&D Results from the B-factory
Some of the Points Raised During my JLAB Visit
IR/MDI requirements for the EIC
SR Background Update for JLEIC
Presentation transcript:

Machine/Detector interface (MDI) Summary J. Haba KEK

What are the MDI issues? IP beam pipe –Vertex resolution –HOM/wall current –Pick-up noise (not small for short bunch small bp?) –Background IR magnets and beam ducts –Interference in space –Detector solenoid field  compensation –Background Vacuum and SR fans –Background –Cooling Communication between ACC. and EXP. –Information exchange  Luminosity, vertex point, beam profile  Orbit information, vacuum, background control by movable mask

 Not covered here. 10 nice contributions. Not in this order.

Ohuchi for S-KEKB

Compensation solenoid (ESL) indispensable for HIGH luminosity (Oide) Ohuchi for S-KEKB

Request to modify the Pole tip. Ohuchi for S-KEKB

The source of HOM power: Collimators Novokhatski for PEPIII

IP HOM Power Novokhatski for PEPIII Insufficient cooling cause high vacuum pressure (high beam background), then melting and vacuum leak….

Other than HOM, we have wall current Comparison of 2.5, 1, and 0.5 cm pipes. This is only resistive-wall power! Novokhatski for PEPIII

Wake field Evidence from PEP-II Shielded fingers of some vacuum valves were destroyed by breakdowns of intensive HOMs excited in a valve cavity. Novokhatski for PEPIII

Basic Design Proposed basic designs for arc are: –Beam duct: Copper beam duct with an ante- chamber Distributed pumping by NEG strips Inner surface with low SEY or/and solenoid [e+] –Bellows and gate valves: with comb-type RF shield (Low impedance, high strength) –Connection flange: MO-type flange (little step) [or RF bridge + Vacuum seal] –Movable mask (collimator) Invisible mask head [no concrete design yet] –· · · · · Beam SR NEG Strips Fight against HOM ----Never ending story told by Suetsugu

Gate Valve _1 Gate valve has the same problem to bellows chamber. Application of comb-type RF-shield to gate valve is studied. –A test model (circular type) was manufactured and installed in LER last winter. –The temperature of body decreased to ½. [Collaboration with VAT Co.] Fingers: Ag plated SS Teeth: Cu Suetsugu for S-KEKBI

Beam Duct with Ante-chamber _2 Pumps in Q and SX Uniform pumping speed LER –2 NEG channels 1 strip each –0.1 m 3 /s lumped pumps at both sides of magnets –Conductance = 0.36 m 3 /s/m/channel –1 NEG channels 3 strip each –Conductance = 0.4 m 3 /s/m –25 – 45 % up in average Suetsugu for S-KEKBI Better vacuum, less PE.

Beam Duct with Ante-chamber _6 Electrons in the beam channel –Photoelectrons decreased by factors at high current (I b  mA). –The reduction was by orders at low current (I b  100mA). –Multipactoring seems to become important at higher current. Combination with solenoid field, and an inner surface with a low SEY will be required at higher current. Limit of measurement [Linear Scale][Log Scale] Repeller Voltage = -30 V 3.77 buckets spacing Suetsugu for S-KEKBI

Where background comes from? SR from magnets. Spent particle from beam- residual gas in the upstream Radiative Bhabha  the last WS found Touchek interaction in LER (more frequent top-up injection to compensate very short life time of beam)

Sullivan for PEPIII

2.5cm

Sullivan for PEPIII No strong separtion bend. SR from Q is now main concern Evaluation of the beam tail Is very important, however, simulation may be very tough, Measurement should be done. Reflection should be Considered next.

SR, downstream magnet (QCS) origin 1.Downstream final focus magnet (QCS) generate high energy SR (E crit ~ 40 keV) 2.SR photons are scattered at downstream chamber (~9m) 3.Backscattering photons enter to the detector (E eff ~ 100 keV) SVD ~ 1/3 of bkg CDC ~ 1/3 of bkg BG  I HER SR from QCS backscattering

Radiative Bhabha : inner detectors Actually, BaBar has large BG for inner detectors while it is negligible at Belle BaBar DCH We should consider because higher lum gives higher BG Tajiama for S-KEKB

Radiative Bhabha origin Main BG source for KLM Negligible for others BG  Luminosity

Radiative Bhabha background First identified in the last Joint workshop (2004- Jan.) Confirmed in the following BBB task force Extrapolation of PEPII background to super Bfactory invalidated. –No separation IP –Possible shield to reduce further Simulation studies including several nuclear reaction for neutron production. (  Robertoson)

Difference of magnet position is the reason Shower caused by over bend particle Pointed out by M.Sallivan in 6 th HLWS (Nov,2004) Tajiama for S-KEKB Originally from Sullivan

Rad. Bhabha BG sim. for Super-KEKB FWD EndCap BWD EndCap Barrel L=10 34 /cm 2 /s ~4 % of total BG L=25x10 34 /cm 2 /s Expected BG from other sources with heavy metal total 1~2 ton Realistic design based on discussion with QCS group Tajima for S-KEKBI

Average Vacuum 2.5x10 -7 Pa 1 st layer Super-KEKB design at Now!! My optimistic Suppressed by Neutron shield Beampipe radius 1.5  1cm BGx33 (several MRad/yr)!? (sim. for particle shower) KEKB Tajima for S-KEKBI

Does the background scale with luminosity or just beam current ? CDC leak current Lum. (/ub/sec) Tajima for S-KEKBI We don’t have to be too psimistic

Effect of background Radiation damage Performance degradation due to high occupancy –Lower efficiency –Worse resolution in vertexing/tracking/clustering

Hara Vertexing degradation due to HIGH occupancy

B→  +  - recon. Efficiency ~high momentum tracking /cm 2 /s For simplicity, assuming relation btw luminosity and BG level is linear: Current CDC config. 130x10 32 /cm 2 /s (x1), 260 (x2), 390 (x3) Old CDC config. 90x10 32 /cm 2 /s (x1), 450(x5) No degradation found in high momentum tracking eff. upto x3 BG of that in current operation condition. B→  +  - rec. eff (w/ geom. eff.) Single track eff. (square root of left value) MC study Sumisawa

D* + D* - (both D*  (K3  )  s )  high multiplicity case loose mass for D 0,D* -,and B 0 cut are only required. 3  BG : eff. loss = 32.9% (1  BG : eff. = 4.05  0.14%, 3  BG : eff. = 2.72  0.11%) updated T0 recon. narrow window of drift time. new readout electronics for 2 more layers. eff. loss = 18.7 % (+14.2% gain) new readout electronics for all layers eff. loss = 12.1 % (+6.6% gain) case2 case3 case4 case1 Sumisawa

Should be done soon… Understand the current status further (BBB task force) Detector solenoid strength –Optimize for better lower mometum track? Cut off in pt Less degradation in tracking/vertexing Less constrarints among the IR components and the detector. IP beam pipe radius  1cm? –Better vertex with smaller r. –Tough (impossible) optimization of SR. –Much higher background even for outer detector. –Cooling against severe HOM/wall current? –Mechanical robustness? Feed back from Physics target is the key for optimaization.