Engineering Economics in Canada

Slides:



Advertisements
Similar presentations
Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights reserved
Advertisements

Decision Theory.
Chapter 9 Project Analysis Chapter Outline
Managerial Decision Modeling with Spreadsheets
Decision analysis: part 2
Copyright ©2009 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Engineering Economy, Fourteenth Edition By William.
Copyright ©2012 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Engineering Economy, Fifteenth Edition By William.
Academic Teacher Resources Student Wall Planner and Study Guide MOTIVATE YOURSELF.
Part 3 Probabilistic Decision Models
Slide Sets to accompany Blank & Tarquin, Engineering Economy, 6 th Edition, 2005 © 2005 by McGraw-Hill, New York, N.Y All Rights Reserved 18-1 Developed.
1 Chapter 12 Value of Information. 2 Chapter 12, Value of information Learning Objectives: Probability and Perfect Information The Expected Value of Information.
1 NSF Graduate Research Fellowship Program Seminar 2 ©Valorie Troesch 2006.
Engineering Economic Analysis Canadian Edition
Copyright © 2006 Pearson Education Canada Inc Course Arrangement !!! Nov. 22,Tuesday Last Class Nov. 23,WednesdayQuiz 5 Nov. 25, FridayTutorial 5.
(c) 2001 Contemporary Engineering Economics 1 Chapter 14 Project Risk and Uncertainty Origin of Project Risk Methods of Describing Project Risk.
MANAGEMENT SCIENCE The Art of Modeling with Spreadsheets STEPHEN G. POWELL KENNETH R. BAKER Compatible with Analytic Solver Platform FOURTH EDITION CHAPTER.
ENGR 280 Engineering Economics Course Review November 29, 2005.
Dealing With Uncertainty
Topics Today Conversion for Arithmetic Gradient Series
Engineering Economics in Canada
Contemporary Engineering Economics, 4 th edition, © 2007 Methods of Describing Project Risk Lecture No. 46 Chapter 12 Contemporary Engineering Economics.
ITC242 – Introduction to Data Communications ITC431 – Computer Networks Week 13 Exam Preparation.
Financial Accounting Introduction. Copyright © 2006 Pearson Education Canada Inc. 6-2 Engineers need to understand how financial data is recorded and.
Engineering Economics in Canada Chapter 9 Inflation.
© 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
© 2007 Pearson Education, Inc. publishing as Longman Publishers Chapter 2: Active Reading and Learning Efficient and Flexible Reading, 8/e Kathleen T.
Methods of Handling Project Risk Lecture No. 30 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
Copyright © 2003 McGraw Hill Ryerson Limited 8-1 prepared by: Carol Edwards BA, MBA, CFA Instructor, Finance British Columbia Institute of Technology Fundamentals.
Applied Business Forecasting and Planning
Maths Counts Insights into Lesson Study 1. Sandra Fay, Irene Stone, Sharon Mack First year Junior Cert An Introduction to Patterns 2.
Copyright © 2003 Pearson Education Canada Inc. Slide 3-28 Chapter 3 Cost-Volume-Profit Analysis.
Chapter 1: Active Reading & Thinking Strategies
Class Introduction BA 543 Financial Markets and Institutions.
A Famous Mathematician Write about only one of your choice !
1 Business Math Chapter 7: Business Statistics. Cleaves/Hobbs: Business Math, 7e Copyright 2005 by Pearson Education, Inc. Upper Saddle River, NJ
Stock Market Project. STEP 1: Pick no fewer than 7 stocks to include in your investment portfolio Print a current graph (past 6 months of activity). Use.
Planning & Writing Laboratory Reports A Brief Review of the Scientific Method.
Chapter 6 Production. ©2005 Pearson Education, Inc. Chapter 62 Topics to be Discussed The Technology of Production Production with One Variable Input.
Copyright ©2014 Pearson Education Chap 4-1 Chapter 4 Basic Probability Statistics for Managers Using Microsoft Excel 7 th Edition, Global Edition.
Engineering Economic Analysis Canadian Edition
© 2005 Pearson Education, Inc. publishing as Longman Publishers Chapter 2: Active Reading and Learning Efficient and Flexible Reading, 7/e Kathleen T.
THE IBMYP PERSONAL PROJECT. What is the Personal Project? A chance to be a Bill Gates, a Picasso, a Jamie Oliver or…. Personal interest Project completed.
CHAPTER 10 DEALING WITH UNCERTAINTY. RISK Risk and uncertainty are similar in that they both present the problem of not knowing what future conditions.
The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin 12 Financial and Cost- Volume-Profit Models.
Introduction: Course Overview Social Studies 9. Canada: Opportunities and Challenges General Outcome 9.1 Issues for Canadians: Governance and Rights Students.
Unit 3 Data Representation Passages Part 2
Engineering Economy, Sixteenth Edition Sullivan | Wicks | Koelling Copyright ©2015, 2012, 2009 by Pearson Education, Inc. All rights reserved. Figure 11-1.
1 Copyright © 2015, 2011, 2007 Pearson Education, Inc. Chapter 8-1 Quadratic Functions Chapter 8.
HOW TO WRITE A SCIENCE PAPER. Numbering  Upper right hand corner of each page including title page, type a shorthand version of your title followed by.
2014 Warren STEM Fair Tuesday and Wednesday, April 22 nd and 23 rd, 2014 “Science With a Purpose”
Copyright ©2015 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Engineering Economy, Sixteenth Edition By William.
Lecture 02.
Soc 220H1: Social Stratification Josh Curtis Department of Sociology University of Toronto Fall 2013.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Probabilistic Cash Flow Analysis.
6 - 1 Chapter 6: Analysis Using Spreadsheets PowerPoint Slides Prepared By: Alan Olinsky Bryant University Management Science: The Art of Modeling with.
Copyright © 2009 Pearson Education, Inc. 9.2 Hypothesis Tests for Population Means LEARNING GOAL Understand and interpret one- and two-tailed hypothesis.
Dealing with Uncertainty Assessing a Project’s Worth under Uncertainty or Risk.
INFO 3: Use of ICT In The Digital World Topic 8: Development Methods (Stages of the SDLC) Electronic Chapter: 9.
Chapter 4 PowerPoint Spreadsheet Analysis.
Types of tests Risk Assessment Procedures – Auditors use the results of risk assessment procedures to determine the type and amount of further audit.
In-Service Teacher Training
Lecture 02.
Science Fair Project Title of Project Student Name(s) Teacher
Welcome to Financial Studies
How to set up your compendium
Chapter 21 Formal Reports
In-Service Teacher Training
Chapter 4 Risk and Return-Part 1.
Chapter 4 Risk and Return-Part 1.
Presentation transcript:

Engineering Economics in Canada Chapter 11 Dealing with Uncertainty: Sensitivity Analysis

Sensitivity Analysis Methods Sensitivity graphs illustrate the sensitivity of a particular measure (e.g., present worth or annual worth) to changes in the uncertain parameters of a project. Break-even analysis can answer such questions as: “What production level is necessary in order for the PW of a project to be greater than zero?” Break-even analysis can also give insights into comparisons between projects. Scenario analysis allows us to look at the impact of varying several parameters at a time. Copyright © 2006 Pearson Education Canada Inc.

Copyright © 2006 Pearson Education Canada Inc. 11.4 Scenario Analysis Scenario analysis is the process of examining the consequences of several possible sets of variables associated with a project. Commonly used scenarios are the “optimistic” (or “best case”) outcome, the “pessimistic” (or “worst case”) outcome, the “expected” (or “most likely”) outcome. The best- case and worst- case outcomes can capture the range of possible outcomes for a project, or a comparison among projects. Copyright © 2006 Pearson Education Canada Inc.

Copyright © 2006 Pearson Education Canada Inc. Example 11.4 Cogenesis (refer to Example 11.1) wishes to do a scenario analysis of their cogeneration problem in order to decide whether the project should be undertaken. They have established optimistic, pessimistic, and expected estimates of each of the parameters for their decision problem. The three scenarios and the associated estimates are summarized in Table 11.5 Copyright © 2006 Pearson Education Canada Inc.

Copyright © 2006 Pearson Education Canada Inc. Table 11.5 Copyright © 2006 Pearson Education Canada Inc.

Copyright © 2006 Pearson Education Canada Inc. Example 11.4 Observations The scenario analysis reveals that the present worth of the cogeneration plant will be negative if all parameters take on their worst- case values both the expected-case and best-case scenarios lead to positive present worths There is some risk that the cogeneration project will have a negative PW if worst-case scenario occurs. However, even if the worst-case outcome does occur, the loss is not huge compared with the potential gain in the other two cases. Copyright © 2006 Pearson Education Canada Inc.

Copyright © 2006 Pearson Education Canada Inc. Scenario Analysis The use of scenarios allows an analyst to capture the range of possible outcomes for a project or group of projects. Done in combination with sensitivity graphs and break-even analysis, a great deal of information can be obtained regarding the economic viability of a project. Copyright © 2006 Pearson Education Canada Inc.

Copyright © 2006 Pearson Education Canada Inc. Scenario Analysis The one drawback common to each of the three sensitivity analysis methods covered in this chapter is that they do not capture the likelihood that a parameter will take on a certain value or the likelihood that a certain scenario will occur. This information can further guide a decision maker and is often crucial to assessing the risk of the worst case outcome. Chapter 12 will describe how these concerns are addressed. Copyright © 2006 Pearson Education Canada Inc.

Copyright © 2006 Pearson Education Canada Inc. Summary Introduction Sensitivity Graphs Break-Even Analysis For a single project For multiple projects Scenario Analysis Copyright © 2006 Pearson Education Canada Inc.

Project----Time Table Find your group: Mid-October Select Topic: End of October Survey finished: End of Nov. 7 Project: November (3 Weeks) Project Report Due: Final Quiz Copyright © 2006 Pearson Education Canada Inc.

Project----What Wei Wants You are a college student, show me your ideas No exams out of university Do a good job: Knowledge: 20-50% Teamwork, independent work, management, public relation, ability to learn>50% Wei: Put you in nowhere to see your ability Jump out of this do-the-assignment system Copyright © 2006 Pearson Education Canada Inc.

Project----Requirements Group: 3-6 Students should be done now Topic: Practical, means real data, meaningful topic , should be almost done now Length: 15 pages-30 printed pages (12pt). Report: On Time, Original, Clear, teamwork. Marks: 1 mark to 1 report, one group No spoon feed: Independent Team work Report: 25 marks out of 100 Copyright © 2006 Pearson Education Canada Inc.

Project Topic----What to do You studentS find the topic (chat chat chat chat….FEDEX DELL GOGGLE) Do what you like, and what you think is meaningful, and connected to your life Those who ask me how many equations should be in the report (>10? >=9?) again get 5 marks deduction each time. Not necessary a pure economic topic, the area is OPEN, just do with the economic backgrounds in mind, OPEN your choice Copyright © 2006 Pearson Education Canada Inc.

Project----Recourse—Be Active! Goggle, Library Canaidan Government Web Car Dealer, Dollar store owner Teacher, Unions, Lawyer Starting business, stopping business Economics Faculty Newspaper, TV Your Parents, Friends Go beyond the campus!!!!!!!!! Did you notice? Copyright © 2006 Pearson Education Canada Inc.

Copyright © 2006 Pearson Education Canada Inc. Quiz 4---When and Where Quiz: Tuesday, Nov. 8, 2005 11:30 - 12:20 (Quiz: 30 minutes) Tutorial: Tuesday, Nov. 15, 2005 ELL 168 Group 1 (<95) (Students with Last Name A-M) ELL 061 Group 2 (<60) (Students with Last Name N-Z) Copyright © 2006 Pearson Education Canada Inc.

Quiz---Based on Chapter 10, 11 Important: Wei’s Slides More Important: Examples in Slides 1 Formula Sheet is a good idea 2 Questions for 1800 seconds. Wei used 754 seconds Bring: Paper, Pen, Formula Sheet, Calculator, Student Card Write: Name, Student No. and Email Copyright © 2006 Pearson Education Canada Inc.

Copyright © 2006 Pearson Education Canada Inc. Quiz---Contact Info Wei Li wli@ece.uvic.ca Group 1 +Group 2 CraigTipping    ctipping@uvic.ca Group 1 (Last Name A-M) ELL 168 LeYang             yangle@ece.uvic.ca       Group 2 (Last Name N-Z) ELL 061 Do not send me Email at 2:00am Nov. 8 for help; Do not ask for the problems, Wei was a student. Copyright © 2006 Pearson Education Canada Inc.