John Arthur Photon Systems April 16, 2007 1 LCLS Photon Systems Status Technical status and accomplishments Response to.

Slides:



Advertisements
Similar presentations
Richard M. Boyce FAC Review – Accelerator Installation October 29-31, Installation – Accelerator Systems Installation Planning.
Advertisements

LCLS Transition to Science DOE Status Review of the LUSI MIE Project LCLS NEH ARR John Arthur LCLS Experimental Facilities Division August 11, 2009 Welcome.
John Arthur X-ray October 12, 2004 X-Ray Detector Program Status John Arthur.
Hal Tompkins FEE/FEL June 16, FEE/FEL Commissioning Overview By Hal Tompkins Photon Beam Systems Deputy.
1 John Arthur 1 FEH Status CXI Review June 3, 2009 FEH Layout, Status John Arthur – LCLS Expt’l Facilities Div June 3, 2009.
Stefan Moeller XES FAC Review – April 16, 2006 X-Ray Endstation Systems (XES) Status Stefan Moeller.
John N. Galayda LCLS Facility Advisory November 11, LCLS Update November 11, 2008 Construction Status LCLS Instruments.
John Arthur X-ray November 11, 2008 SLAC National Accelerator Laboratory 1 X-ray Overview LCLS Directorate structure.
Richard M. Bionta XTOD October 12, 2004 UCRL-PRES-XXXXX X Ray Transport, Optics, and Diagnostics, Overview Facility Advisory Committee.
John N. Galayda LCLS FAC 20 April Linac Coherent Light Source Overview and Charge Facility Advisory Committee John.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project The Instrument Readiness Review Process John Arthur LCLS Experimental Facilities Division.
Stefan Moeller Revised XES April 7, 2005 Revised X-Ray Endstation Scope Stefan Moeller.
John Arthur X-ray June 17, X-ray Overview XTOD current status XES current status Schedule to first experiments.
Diffraction studies of stimulated dynamics (pump-probe) Coherent-scattering studies of nanoscale fluctuations Atomic, molecular and optical science High.
1 Stefan Moeller 1 AMO Instrument Schedule ARR AMO Instrument Schedule Stefan Moeller – XES Manager June 30, 2009.
X Ray Transport / Optics / Diagnostics Overview Richard M. Bionta Facility Advisory Committee Meeting April 29, 2004 Richard M. Bionta Facility Advisory.
John Arthur Photon October 18, 2005 LCLS Photon Systems Status John Arthur SLAC.
Accelerator Systems Division FACET Project Management John Seeman for the FACET Study Group PPA Directorate Stanford Linear Accelerator Center DOE FACET.
John Arthur Photon October 29, Photon Systems Update FAC recommendations Current status New plan for Photon Systems.
John Arthur Photon October 27, Photon Systems Overview John Arthur SLAC.
M. Reichanadter LCLS Project June 2008 FAC Meeting Report to the LCLS Facilities Advisory Committee Project Management.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project NEH status and XFD operations Hal Tompkins, John Arthur LCLS Experimental Facilities.
Richard M. Boyce FAC October 29-31, Installation Planning Integration process – IMT update Installation Planning &
John Arthur X-Ray Optics October 12, 2004 X-Ray Prototype Optics Specifications John Arthur.
John N. Galayda LCLS FAC October Linac Coherent Light Source Overview and Charge Facility Advisory Committee.
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
John Arthur Photon April 20, 2006 Photon Systems Update John Arthur SLAC Photon Systems Manager.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
1 Michael Rowen 1 SXR Instrument FAC SXR Instrument Michael Rowen – Engineering Physicist June 9, 2009.
John N. Galayda LCLS Facility Advisory 29 October 2007 Linac Coherent Light Source Overview 29 October 2007  Project.
John Arthur X-Ray Endstation April 29, 2004 X-Ray Endstations Overview John Arthur.
Steve Lewis XTOD 4-8 April, 2005 UCRL-PRES LCLS Week 4-8 April, 2005 Steve Lewis X-ray Transport, Optics, and Diagnostics:
1 T. Fornek 1 LUSI CXI FIDR June 3, 2009 Thomas Fornek Project Manager June 3, 2009 LUSI Coherent X-Ray Imaging Instrument Final.
John Arthur PIXEL Project April 7, 2005 Status of the Proposed PIXEL Project John Arthur SSRL/SLAC Photon Instrumentation.
1 T. Fornek 1 LUSI XCS FIDR June 17, 2009 Thomas Fornek Project Manager June 17, 2009 LUSI X-Ray Correlation Spectroscopy Instrument.
John Arthur X-ray April 20, 2006 X-Ray Beamline and Experiment Layout John Arthur LCLS Photon Systems Manager.
John Arthur Photon October 12, Photon Systems Update John Arthur SLAC 1.
Hal Tompkins Photon October 30, LCLS Photon Systems Installation and Commissioning Presentation to Facility Advisory.
1 Sébastien Boutet 1 Coherent X-ray Imaging Instrument FAC Meeting, June Coherent X-ray Imaging Instrument Sébastien Boutet.
LCLS Undulator Systems TDR Charge Linac Coherent Light Source Stanford Linear Accelerator Center Technical Review, March 3, 2004.
Stefan Moeller XES Plan for FAC Review - April 20, 2006 X-Ray Endstation Systems (XES) Status and Plan for FY06 Stefan Moeller.
John Arthur Photon Systems April 7, 2005 Photon Systems Overview John Arthur.
XCS Aymeric ROBERT 1 LUSI X-ray Correlation Spectroscopy Instrument Advanced Procurement Review : Large Offset Monochromator.
1 E. Bong 1 XCS Final Instrument Design Review Engineering Status April 21, 2009 LUSI WBS 1.4 X-Ray Correlation Spectroscopy Final.
David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 1 Undulator Complex Status LCLS Introduction.
M. Reichanadter LCLS Project November 2008 FAC Meeting Slac National Accelerator Laboratory Report to the LCLS.
John N. Galayda LCLS Accelerator Readiness December 2, LCLS Overview December 2, 2008 Project Construction Status.
Mark Reichanadter LCLS October 9-11, 2007 LCLS BCR Overview and EIR LOIs Project Progress / Status Revised Project Baseline.
LUSI Coordination with LCLS
Experimental Facilities Planning
DOE Review May, 2005 Steve Lewis
LCLS Ultrafast Science Instruments
John N. Galayda – Director of LCLS Construction March 30, 2009
Installation of Photon Beam Transport to FEH
X-Ray Endstation Design & Management/Commissioning
X-Ray Transport, Optics, and Diagnostics WBS Alan J
X-Ray Endstations Update
Project Management Issues John N. Galayda, SLAC April 24, 2002
John Arthur – LCLS Experimental Operations
NEH - Status Stefan Moeller.
The Transition to User Operations
PIXEL Project Status John Arthur Photon Instrumentation for
X-ray Correlation Spectroscopy Instrument
DOE Review 7-9 February, 2006 Steve Lewis
X-Ray Endstation Design & Management/Commissioning
LCLS Lehman Review February 7-9, 2005
X-Ray Endstation Systems (XES) 2006 Schedule
LCLS Instrument MIE Project: Staffing, Schedule
LCLS Photon Systems Overview
LUSI Controls and Data Systems W.B.S. 1.6
Presentation transcript:

John Arthur Photon Systems April 16, LCLS Photon Systems Status Technical status and accomplishments Response to FY2007 continuing resolution LCLS/LUSI coordination John Arthur LCLS Photon Systems Manager

John Arthur Photon Systems April 16, Recommendations from Oct 2006 Put effort into design of critical x-ray optics components (mirrors and thin crystals) Make LCLS Photon Systems and LUSI work together to optimize designs and commissioning plans Putting both recommendations into practice

John Arthur Photon Systems April 16, XTOD Status Still in advanced design phase Nearly all components at least through conceptual review Staying on schedule About to start major procurements Hardware installation can start LLNL team is working well with SLAC

John Arthur Photon Systems April 16, XTOD design for attenuators and x-ray intensity monitors 4.5 meter long, gas attenuator high pressure N 2 section Embedded (Be) solid attenuators Upstream embedded gas detector Downstream embedded gas detector

John Arthur Photon Systems April 16, LLNL Zygo 20× images of Si test substrates by two vendors 0.37 mm vendor 2, loc. 1vendor 1, loc mm LLNL full-aperture interferometry images of Si test substrates by two vendors Vendor 1 Vendor 2 XTOD working with x-ray mirror vendors

John Arthur Photon Systems April 16, Effects of 2007 CR on XTOD Procurements and some design effort were delayed New plan was developed Commissioning optics in FEE ready for first light Beam transport to NEH ready by late FY2008 All work on Tunnel and FEH delayed until FY2009 All work finished by early FY2010

John Arthur Photon Systems April 16, XES Status In design phase AMO instrument design going well 2-d detector development going well Controls area was behind, catching up Working with Radiation Physics on PPS items Ready for installation starting 11-07

John Arthur Photon Systems April 16, Concept for AMO Instrument Focusing optics Experimental chamber Diagnostics chamber

John Arthur Photon Systems April 16, X-ray shutter and mirror layout From the LCLS operating modes Physics Requirements Doc

John Arthur Photon Systems April 16, Effects of 2007 CR on XES Some design effort was delayed New plan was developed Safety and controls work in NEH ready late FY2008 First-stage AMO instrument ready late FY2008 Work in FEH delayed until FY2009 Some AMO instrumentation delayed until FY2009 All work finished by early FY2010

John Arthur Photon Systems April 16, LUSI-LCLS Integration Working Group Define the interface between LCLS and LUSI Resolve issues overlapping this interface Formalize with Interface Control Documents Find common solutions to common problems Experimental instrumentation, diagnostics Standardization where appropriate The Working Group was created by Keith Hodgson and John Galayda to:

John Arthur Photon Systems April 16, Jerry Hastings (LUSI) John Arthur (LCLS) Yiping Feng (LUSI instrument scientist, controls) David Fritz (LUSI instrument scientist, diagnostics) Stefan Moeller (LCLS Endstation Systems Manager) Hal Tompkins (LCLS x-ray installation, commissioning) Other LCLS/LUSI staff as needed Co-chairs Working Group Members

John Arthur Photon Systems April 16, Issues before the Working Group Experimental data flow and interface standards Vacuum hardware and controls standards Conventional facilities/hutches Installation/commissioning

John Arthur Photon Systems April 16, Summary XTOD and XES are still in design phase, though XTOD is moving into procurement and XES will follow soon FY2007 continuing resolution forced some delays, extension of project Technical issues are being resolved with no big problems Should be ready for installation starting FEE, NEH ready in FY2009, FEH ready in FY2010 Coordination with LUSI is going well, has been formalized