Tuesday, March 31Philae Science team meeting Venice March 30 – April 1, 2009 APXS STATUS G. Klingelhöfer (PI) J. Gironés López J. Brückner (Co-I) R. Gellert.

Slides:



Advertisements
Similar presentations
During spacecraft-level environmental testing, after all instruments were integrated, the government assembled a data clerk team to support test data collection.
Advertisements

World of work How is science used in the world of work? Science in the world of work.
Data Driven Plans to Improve Student Performance Individual Student Success Plans Classroom Data Walls Targeted Interventions: During School Hours.
SOFTWARE UPDATE INSTRUCTION EXPORT DATA FOR ONLINE UPLOAD
Alert radio repeater automated backup, failover, recovery David Leader HydroLynx Systems.
Systems Engineering Breakouts George Angeli. Tuesday 11am Current Commissioning Plans – Chuck Claver Revised commissioning timeline Development plans.
January 6. January 7 January 8 January 9 January 10.
ONLINE DATA UPLOAD INSTRUCTION
Numbers
Philae Science team meeting. Venezia, March 30, 31, April 1, 2009Palazzo Cavalli Franchetti.
Long Term Science working group status LSWT Venice, 30/03-01/04/2009.
Status Venice, 30-Mar-1-Apr 2009 Philae STW 2009.
Philae Science team meeting Venezia, March 30, 31, April 1, 2009 Palazzo Cavalli Franchetti 1. Instrument status Final discussion and wrap-up.
Philae Science team meeting Venezia, March 30, 31, April 1, 2009 Palazzo Cavalli Franchetti 1. Criticality of SDL 2. Activity with Orbiter P/L ongoing.
Open Cruise Requirements status and planning LSWT#4, Venice 30/03-01/ LSWT#4.
Philae Status and News Venezia; 30 st of March th Philae Post-Launch Workshop.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 3 LOF Operations Concept 1 Gamma-ray Large Area Space Telescope GLAST.
Advanced Technology Center 1 HMI Rasmus Larsen / Processing Modules Stanford University HMI Team Meeting – May 2003 Processing Module Development Rasmus.
Extension to the Link Management Protocol (LMP/DWDM - rfc4209) for Dense Wavelength Division Multiplexing (DWDM) Optical Line Systems draft-dharinigert-ccamp-g lmp-05.txt.
airtel iCreate 2012 Business Plan
Update: Grocery Refrigeration Provisional Standard Protocol for Site Specific Savings RTF Meeting June 28,
Tuesday, April 22, 2014MAT 312. Tuesday, April 22, 2014MAT 312.
Jokes and Riddles to celebrate Π
Programmes of Work Revision lesson 5 Tuesday 29 th March.
April , 2006 HEASARC Users Group Steve Drake RXTE Archive at HEASARC Status and Plans Steve Drake.
2nd Grade March Evaluation. 1. Divide the class in four teams 2.Choose a leader per question to compete for the turn to answer. 3.The leader with the.
TUESDAY 19 TH OCTOBER a) Give you the time to consolidate your understanding of each of the 4 phases of the accelerated learning cycle. b) Share.
CPTS 580 Gerontechnology II.  Tuesday, March 25 th, 9:00am  Midterm project quadchart presentations  Send materials to by 9am on.
Project guide Asst.Prof(Sr) T.Shankar I.V.L Raghavendra (08BEC134) Energy optimisation in cluster based wireless Ad-Hoc networks.
Swift HUG April Swift data archive Lorella Angelini HEASARC.
ACES Spring 2003 Overview Where are we going? How are we going to get there?
22 March 2007 Science Simulator Overview and Status ICDS Susie Kennison.
BepiColombo Data Handling and the Science Archive Based on the presentation in Bepi-SWT #1 in April 2005 ESTEC) [J. Zender (ESTEC), Y. Kasaba (ISAS)]
BLOOMBERG ACADEMY WHAT IS BLOOMBERG ACADEMY? TIME: SPRING EVERY YEAR LOCATION: HONG KONG AND BEIJING (POTENTIALLY SHANGHAI) TARGET POPULATION: THE FOLLOWING.
UW status/report: 1. Impact of new FIR filter 2. IDPS/ADL comparisons CrIS SDR Cal/Val Telecon 25-Apr-2012.
Control Strategies for Microgrids Ali Mehrizi-Sani Assistant Professor School of Electrical Engineering and Computer Science Washington State University.
CIVA Status Venezia, Palazzo Cavalli Franchetti March 31, 2009 Philae Science Team Meeting.
School Improvement Specialist Meeting April 4, 2012.
Team 7: Sunoco Hotdog Eye Home Mid-Semester Presentation Hong, Keetaek Baek, Jinwook Lee, David.
SunSatFriThursWedTuesMon January
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Systems Engineering Mike DeKlotz GSFC Stanford Linear Accelerator Center Gamma-ray Large.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Flight Software Summary Peter Harvey Space Sciences.
Status Update Instructions (Required by NASA/Wallops) These completed slides are due to no later than Wednesday, March 6 th, 2013,
SSC Support for Sim #3 Archived MOC Data Products, and distributed via web. –Level-0 telemetry files organized by year and month –SPICE orbit and attitude.
Update on 1 st Article Test of SiPMs Yi Qiang and Carl Zorn April 7, 2011.
GIST-21 Meeting 31 March-02 April MSG PROGRAMME STATUS Presentation to the GIST-21 meeting.
Aquarius Level 0-to-1A Processing Rule #1: save everything from the Level 0 data. Rule #2: never forget Rule #1! The objective is to ensure that the Level.
MSFC Payload Training bs/kh/ExpPldsTST#1/ 3/18/2016 Page 1 Astroculture-8 (ADVASC) TST #1 April 27, 1998 DTM/Beth Skidmore NASA/MSFC Training Branch Voice.
Directions For Accessing Your “Moodle” Team Account 1 Step 1: Use your team Moodle account to access Technology Challenge Louisiana High School Technology.
{ Mastering JEE(Main) 2014 Full Paper Test Only - An intensive test series by MKCL.
STEREO Science Working Group Meeting Telecon No April 14.
LYRA Calibration Status I. E. Dammasch, ROB/SIDC PROBA2 Science Working Team Meeting ROB, Brussels, Belgium, 24 Jun 2013 LYRA the Large-Yield Radiometer.
10-1 人生与责任 淮安工业园区实验学校 连芳芳 “ 自我介绍 ” “ 自我介绍 ” 儿童时期的我.
Efficient Route Update Protocol for Wireless Sensor Networks Xuhui Hu, Yong Liu, Myung J. Lee, Tarek N. Saadawi City University of New York, City College.
Rosetta Science Ground Segment Overview
Philae status 21st Rosetta Science Team meeting
Team 1: 32 responses Team 2: 55 responses Team 3: 29 responses
Yahoo Mail Customer Support Number
Most Effective Techniques to Park your Manual Transmission Car
How do Power Car Windows Ensure Occupants Safety
پروفیل طولی یا نیمرخ طولی (Longitudinal Profile)
كار همراه با آسودگي و امنيت
THANK YOU!.
Project Net 435.
Thank you.
Thank you.
Consulate General of Spain Prize for the Promotion of Spanish Culture
1 Directions For Accessing Your “Moodle” Team Account
Liaison Operations Update
Presentation transcript:

Tuesday, March 31Philae Science team meeting Venice March 30 – April 1, 2009 APXS STATUS G. Klingelhöfer (PI) J. Gironés López J. Brückner (Co-I) R. Gellert (Co-I) C. d`Uston (Co-I)

Tuesday, March 31Philae Science team meeting Venice March 30 – April 1, 2009 APXS status Overview: 1.PC9 results: –Science Data –HKD –Telemetry 2.Objectives por PC10 3.Status of APXS

Tuesday, March 31Philae Science team meeting Venice March 30 – April 1, 2009 APXS status 1.Results of PC9 (1): Activity: –Update of the threshold values for X-ray and Alpha channels –30 minutes measurement –Download of the science data

Tuesday, March 31Philae Science team meeting Venice March 30 – April 1, 2009 APXS status 1.Results of PC9 (2): Science Data:

Tuesday, March 31Philae Science team meeting Venice March 30 – April 1, Results of PC9 (3): HKD: –Nominal Telemetry: –All packets recieved APXS status

Tuesday, March 31Philae Science team meeting Venice March 30 – April 1, Obejctives for PC10 (1): Verification of functionality & performance of the sensor head with different threshold parameters. Measurements of the internal calibration target. APXS status

Tuesday, March 31Philae Science team meeting Venice March 30 – April 1, Obejctives for PC10 (2): Strategy: –Upload parameters and measure (30 minutes) –Contingency protocol (3 pairs of threshold values) –Upload parameters and measurement (7 hours) APXS status

Tuesday, March 31Philae Science team meeting Venice March 30 – April 1, APXS status: Senorhead working nominally CDMS simulator not responding Deployment-device being tested APXS status

Tuesday, March 31Philae Science team meeting Venice March 30 – April 1, 2009 Thank you for your atention APXS team APXS status