EPIC TTD#16 SCIENCE OPERATIONS MPE, 04 May 2006 L. Metcalfe SCI-SDX XMM-Newton Science Support Manager 1 Science Operations & Data Systems Division Research.

Slides:



Advertisements
Similar presentations
WORK PLAN FOR THE EPIC CALIBRATION TEAM (AND BEYOND)
Advertisements

EPIC Calibration Meeting, K. Dennerl VILSPA/Spain, 2003 Mar Temporal variation of the energy response determined with the internal calibration source.
Epic-Cal 4 Feb 2003 Flux check Richard Saxton XMM-SOC/SSC Flux Comparisons.
Chandra X-Ray Observatory CXC Paul Plucinsky EPIC Cal April ACIS Calibration: Recent Updates, Planned Updates, & Future Issues 2.E0102: Joint.
Bruno Altieri EPIC Calibration meeting, Feb. 1-3, 2005 European Space Astronomy Centre Page 1 XMM-Newton ESAC Status of XMM-Newton cross-calibration with.
XMM 1 EPIC MOS Monitoring CAL/OPS Meeting MPE
EPIC Calibration Meeting, MPE K. Dennerl, 2006 May 04 CTI.. update for EPIC pn Long-term behaviour of the CTI.. for EPIC pn.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring MPE, May 2006.
XMM EPIC MOS Steve Sembay ESAC 04/10/05 Implementation of the MOS spatial/temporal DRM: Does it work ? Zeta Puppis: Checking the line.
MPE, 4th of May 2006 Page 1 XMM-Newton Status of EPICs Operations Stéphane RIVES 4th of May 2006.
XMM-Newton 1 Maria Santos-Lleo Science Operations Status EPIC Ops-Cal Meeting November 6, 2007, Mallorca María Santos-Lleó (XMM-Newton Science Support.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton EPIC The XMM-Newton cross-calibration.
Isabel Caballero, Anne Wellbrock Page 1 XMM-Newton ESAC XMM-Newton EPIC relative timing analysis Isabel Caballero Anne Wellbrock M.G.F. Kirsch.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring Palermo, April 2007.
European Space Astronomy Centre Villafranca del Castillo, Madrid, Spain Andy Pollock XMM-Newton SOC RGS calibration Calibration of the XMM-Newton RGS Andy.
XMM-Newton 1 M.Stuhlinger/M.Smith, ESAC PN Monitoring Mallorca, November 2007.
European Space Astronomy Centre Villafranca del Castillo, Madrid, Spain A.M.T. Pollock XMM-Newton SOC EPIC calibration October 2006 Calibration of.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Marcus G. F. Kirsch Mallorca, Summary status of the EPIC calibration.
XMM-Newton 1 M.Stuhlinger, March 2010 Status of XMM-Newton cross-calibration using SASv10.0 Madrid, 24. March 2010.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton MOS Timing Mode calibration Marcus.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton EPIC Calibration of the EPIC MOS Timing.
XMM-Newton 1SCI-SA Populating the CCF Immediate needs are driven by the requirement to test the SAS over the summer before public release. (A release called.
Chandra Calibration Status  Recent releases  Current Calibration projects  Cross-Calibration between Chandra and other X-ray telescopes  Revisions.
XMM-Newton 1 M.Stuhlinger/P.Calderon, ESAC Re-appearance of the MOS1 CCD1 meteorite column during revs Madrid, 23. March 2010.
MOS 3x3 mode slow slew survey Richard Saxton October 2006.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton EPIC Results from the EPIC- Calibration-Workshop.
Images script M. Ehle & Rosemary Willatt (ESAC) April 2007.
XMM-Newton 1 Maria Santos-Lleo Science Operations Status EPIC Ops-Cal Meeting April 8, 2008, Mallorca María Santos-Lleó (XMM-Newton Science Support Manager)
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton XMM Newton cross calibration M.G.F.
I. de la Calle Astronomy Science Operations Division Science Operations Department Background Working Group Meeting, Mallorca – 30/03/2009 XMM-Newton ESAC.
EPIC TTD#14 SCIENCE OPERATIONS Mallorca, 01 February 2005 L. Metcalfe SCI-SDX Science Support Manager 1 Science Operations & Data Systems Division Research.
Pedro Calderón/Guillermo Buenadicha SOC Operations Support Group Page 1 XMM-Newton Status of EPICs Operations Pedro Calderón Riaño Guillermo Buenadicha.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton EPIC Cross calibration PKS
Slews: Fast and Slow. Fast Slew Status  XMMSL1: catalogue of slew sources released May 2006 Revs , 5180 detections, 2692 Revs , 5180 detections,
XMM-Newton 1 Michael Smith, ESAC PN Monitoring Mallorca, October 2006.
Martin Stuhlinger Mallorca, European Space Astronomy Centre Page 1 XMM-Newton ESAC Status of XMM-Newton cross-calibration with SASv7.1 CAL Meeting.
XMM EPIC MOS Andy Read EPIC CAL/OPS Meeting Mallorca, Spain 26-27/10/06 EPIC BGWG XMM-Newton EPIC BackGround Working Group founded.
Mallorca, 1st of February 2005 Page 1 XMM-Newton Status of EPICs Operations Stéphane RIVES 1st of February 2005.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC XMM-Newton Instrument Anomaly Tool & Cross-Calibration Tool Marcus G. F. Kirsch.
XMM 1Michael Smith, ESAC EPIC PN Monitoring Provided by Michael Smith.
XMM EPIC MOS Jenny Carter 8 th EPIC BGWG Meeting Mallorca, March 09 Jenny Carter, University of Leicester Andy Read, University.
The XMM slew survey: status and future Richard Saxton, Andrew Read, Michael Freyberg, Bruno Altieri.
Ops. AGENDA Status of open Action Items Metcalfe Science Operations Status Metcalfe Instrument Operations Buenadicha EPIC Monitoring Stuhlinger/Smith 1.
EPIC Calibration Meeting, K. Dennerl VILSPA/Spain, 2004 March Detector noise & Vela observations application to Vela observations EPIC pn detector.
Page 1 ACTIONS EPIC_10/1 on Munoz. EPIC_10/1 on Munoz. –Closed: MS delivered Slew Data Files  EPIC_10/2 on Smith: to verify whether PHS_tools checks for.
XMM 1 EPIC MOS Monitoring CAL/OPS Meeting Mallorca
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Energy calibration refinement of the EPIC-pn Burst mode M.G.F. Kirsch 1, E.
1 Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton Ops. AGENDA Operations status and.
Martin Stuhlinger X-Ray Universe 2005, Sep.26-30, 2005 European Space Astronomy Centre Page 1 XMM-Newton ESAC Status of XMM-Newton cross-calibration with.
Guillermo Buenadicha SOC Operations Support Group Page 1 XMM-Newton Status of EPICs Operations Guillermo Buenadicha PALERMO 11/04/07.
XMM EPIC MOS Steve Sembay EPIC Calibration Meeting Ringberg 2-5/April/2002 Broad-Band MOS v PN Cross-Calibration Study •8 Observations.
XMM 1 EPIC MOS Monitoring. XMM-Newton 2 Martin Stuhlinger, ESAC MOS Bad Pixel Monitoring.
XMM EPIC MOS Andy Read EPIC CAL/OPS Meeting MPE, Germany 04-05/05/06 EPIC BGWG XMM-Newton EPIC BackGround Working Group founded (~1.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Long term EPIC in-orbit calibration plan Marcus G. F. Kirsch.
XMM EPIC MOS Andy Read 4 th EPIC BG WG Meeting Mallorca, Spain 25/10/06 Agenda: EPIC BG working group: 4th meeting 25/10/06 – Mallorca.
Science Operations Status Maria Santos-Lleo EPIC cal & ops meeting, Madrid March, 2010.
RGS/MOS-cooling Results February 03, 2003 L. Metcalfe 1 Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton.
XMM EPIC MOS Steve Sembay Mallorca 06/11/07 Report on three NRCO calibration observations On axis observation of absorbed Seyfert.
Chandra X-Ray Observatory CXC Paul Plucinsky EPIC Cal Update on ACIS Calibration 1) Update to the ACIS contamination model 2) Temperature-dependent.
XMM EPIC MOS Andy Read OPS/CAL/BG (OCB) Meeting Mallorca, Spain 05-07/11/07 Report from the BGWG (05/11/07) Andy Read, on behalf.
EPIC Calibration Meeting, Madrid Correcting spatial inhomogeneities of the absolute energy scale K. Dennerl, 2010 March 23 Correcting spatial inhomogeneities.
SAG+SASWG Meeting Potsdam /15 PN Tasks – Status Report (update since Leicester) Hermann Brunner - MPE  epframes:  The dark quadrant problem.
Chandra X-Ray Observatory CXC Paul Plucinsky IACHEC March Thermal SNR Working Group: Summary Report Paul Plucinsky on behalf of the IACHEC Thermal.
M. Pilar Esquej, XMM-Newton European Space Astronomy Centre Page 1 Status of the XMM-Newton Slew Survey P. Esquej, R. Saxton, B. Altieri, A. Read, M. Freyberg,
The Slow Slew Survey Richard Saxton / Pedro Rodriguez November 2006.
Status of EPIC operations Pedro Calderón Riaño, ESAC Leicester BOC meeting 6-8 March 2012.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Status of the EPIC calibration Presentation for XMM Newton UG 18 May 2006 Marcus.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring Mallorca, April 2008.
XMM-Newton Users Group Meeting #6 Science Support ESAC, 19 th. / 20 th. May 2005 L. Metcalfe SCI-SDX 1 Science Operations & Data Systems Division Research.
EPIC Calibration & Operations Meeting
Presentation transcript:

EPIC TTD#16 SCIENCE OPERATIONS MPE, 04 May 2006 L. Metcalfe SCI-SDX XMM-Newton Science Support Manager 1 Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton

OPS: EPIC-TTD- 14/3Explain increases in pn offset variance in the 840 to M. Smith plus revolution range. 14/5Provide an agenda draft for a hypothetical OBSW G. Buenadicha contract meeting addressing all concerns raised during the presentation. 14/9Make MOS2 CCD5 effect public.M. Stuhlinger /1Implement activation of MOS1 CCD6 every three S. Rives months (by performing e.g. a diagnostic) to check any changes in its condition. 15/2Identify what is needed for testing and preparing for M. Casale the use of redundancies. 15/3 Subsequently to evaluate and decide which of the A. Abbey 200?-??-?? items resulting from action 15/2 can be delivered. 2 Science Operations & Data Systems Division Research & Scientific Support Department Page 2 XMM-Newton OPEN ACTIONS - EPIC TTD

CAL: EPIC-CAL- 12-4JB to provide VILSPA with a tool to check MOS data Ballet for "3 missing raws" feature. 14-1Additional time column with other 0 point for ODFKirsch MK to update frame times according to analysisKirsch presented in MK to implement time jump in a Q-check type Kirsch procedure in the long term. 14-5MS to implement KDs values into CCFStuhlinger /1Provide update of MOS drm parameter files (SS) Kirsch /2 Provide eff mode CTI degradation parameters to SOCDennerl /3Implement mode-dept. pn CTI-degradation in SASKirsch/Saxton /4 NRCO on Eta Carinae in SW and FF mode, obs. time Kirsch like rev 115. Ask for Chandra Cross (HETG) Stuhlinger 3 Science Operations & Data Systems Division Research & Scientific Support Department Page 3 XMM-Newton OPEN ACTIONS - EPIC CAL

CAL: EPIC-CAL- 15/5MOS-CTI update, to sort out responsibility Kirsch/Sembay /6Update MOS CTI CCFs DB/MSt /7Provide input for column region dept. CTIBaskill /8Implement column region dept. CTI into SAS Saxton/Kirsch /9NRCO for Pulsar timing PSRB0540 PSRB1509 checks MK/MSt/ME simultaneous with RXTE and radio 15/100.75sec star tracker delay to get into system Kirsch/Saxton /11Track implementation of "switch all 1 CCD slews for Smith pn to CLOSED' Specify implementation by end Oct. 15/12Describe feature of off axis badpixfind behaviour MSt, WNP for pn at (TBD) appropriate place 15/13Get in contact with Suzaku for RXJ1856 X-Cal.MSt Science Operations & Data Systems Division Research & Scientific Support Department Page 4 XMM-Newton OPEN ACTIONS - EPIC CAL

CONTENTS Personnel changes at SOC Significant dates and meetings Operations General Calibration Points Data Processing - SAS Data Processing - SSC XSA Miscellaneous 5 Science Operations & Data Systems Division Research & Scientific Support Department Page 5 XMM-Newton

PERSONNEL CHANGES AT SOC  Arvind Parmar has replaced Fred as Mission Manager  Stephane (at his final TTD Meeting) will hand over his functions to Guillermo & Neil (Cheek).

SIGNIFICANT DATES AND MEETINGS 7 Science Operations & Data Systems Division Research & Scientific Support Department Page 7 XMM-Newton

SIGNIFICANT DATES Users Group Meeting #7 18/19May2006 SAS Workshop 30 May-02 Jun.2006 ICWG meeting, Iceland 14-16Jun.2006 Variable & Broad Fe Lines around Black Holes 26-28Jun.2006 AO6 Call AO6 Call 28 Aug.2006 Close Phase I 06 Oct.2006 Open phase II 15 Jan.2007 Close XRPS 09 Feb.2007 Begin AO6 observations May2007

OPERATIONS 9 Science Operations & Data Systems Division Research & Scientific Support Department Page 9 XMM-Newton

OPERATIONS  All instruments essentially stable  MSG LEOP took out Revs to 1110  Rev.1147 HotBird and SpainSat support  We’re probably due another (micro-)meteoroid !!

11 Science Operations & Data Systems Division Research & Scientific Support Department Page 11 XMM-Newton

12 Science Operations & Data Systems Division Research & Scientific Support Department Page 12 XMM-Newton

13 Science Operations & Data Systems Division Research & Scientific Support Department Page 13 XMM-Newton

14 Science Operations & Data Systems Division Research & Scientific Support Department Page 14 XMM-Newton

15 Science Operations & Data Systems Division Research & Scientific Support Department Page 15 XMM-Newton

16 Science Operations & Data Systems Division Research & Scientific Support Department Page 16 XMM-Newton

17 Science Operations & Data Systems Division Research & Scientific Support Department Page 17 XMM-Newton

18 Science Operations & Data Systems Division Research & Scientific Support Department Page 18 XMM-Newton

GENERAL CALIBRATION POINTS A few remarks approaching UG#7 CCFs released since previous TTD NRCOs in period 19 Science Operations & Data Systems Division Research & Scientific Support Department Page 19 XMM-Newton

3C273 (1) SASv6.1  Rev  Medium filter  All EPICs in SW modes

3C273 (2)  Rev  Medium filter  All EPICs in SW modes SASv6.1

Corrected-RGS comparison with EPIC : PKS

Corrected-RGS comparison with EPIC : 3C273 RGS response to Stuhlinger et al. XCal document spectrum without adjustment

CCF RELEASE NOTES IN PERIOD XMM-CCF-REL-204 EPIC PN Bad Pixels 06Mar2006 XMM-CCF-REL-202 EPIC MOS Response 22Nov2005 XMM-CCF-REL-200 Update of EPIC MOS gain 21Oct2005 XMM-CCF-REL-199 OM Grisms Calibration: Update 19Oct2005 XMM-CCF-REL-198 PN Spatial Gain 14Oct2005

NRCOs 54 The RGS response to the Crab X-ray standard The RGS CTI calibration Verification of the EPIC high energy resolution Investigation of random EPIC-pn gain scatter Verification of the EPIC-pn relative timing RGS long- response & MOS CTI with Vela Verification before MOS1 medium filter check Calibrating the SWCX contamination SWCX  Solar Wind Charge eXchange emission

DATA PROCESSING - SAS 26 Science Operations & Data Systems Division Research & Scientific Support Department Page 26 XMM-Newton

SAS  7 th. SAS May 30 to June 2, 2006  Debugging reprocessing pipeline at SSC continues  2XMM  Release of SAS 7 June(ish)  Slew catalogue released in XSA yesterday  OM filter response matrices created

DATA PROCESSING - SSC 28 Science Operations & Data Systems Division Research & Scientific Support Department Page 28 XMM-Newton

29 Science Operations & Data Systems Division Research & Scientific Support Department Page 29 XMM-Newton Turn-around time between data acquisition and GO (PIPE) delivery as of 31-March-2006

XSA 30 Science Operations & Data Systems Division Research & Scientific Support Department Page 30 XMM-Newton

Recent XSA versions XSA v2.9 (March 2006) Simple access to external archival facilities XSA v3.0 (May 2006) EPIC Sources Slew Catalogue

Simple access to external archives

Slew Catalogue Access Query panel Results DSS Soft band Hard band X-rays

MISCELLANEOUS PUBLICATIONS OTHER … 34 Science Operations & Data Systems Division Research & Scientific Support Department Page 34 XMM-Newton

35 Science Operations & Data Systems Division Research & Scientific Support Department Page 35 XMM-Newton

36 Science Operations & Data Systems Division Research & Scientific Support Department Page 36 XMM-Newton

37 Science Operations & Data Systems Division Research & Scientific Support Department Page 37 XMM-Newton