In the Name of God Most Greasiest the Most Merciful.

Slides:



Advertisements
Similar presentations
Create Your Own Instruction Manual. Objectives Create an instruction manual, step-by-step guide to perform a task or project. Create an instruction manual,
Advertisements

Managing the Health and Safety of Contractors
Change Order Missouri Local Programs How to Complete a Change Order & Get it Approved.
Using the Self Service BMC Helpdesk
SUPPLIER VA/VE SUGGESTION FORM ATTN: ___________________________ SUBMITTED DATE: ____________________________ COMPANY: _______________________________________.
Key Reliability Standard Spot Check Frank Vick Compliance Team Lead.
Project Management Shuffle Directions: take the definitions from the following cards and write a song using the tune from “Cupid Shuffle”
Accounting Information Systems 9th Edition
4 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Process Analysis 4.
CRICOS Provider Number 00103D OHS Management of Contractors in Capital Works and Maintenance Physical Resources / Risk, Health and Safety.
Case Tools Trisha Cummings. Our Definition of CASE  CASE is the use of computer-based support in the software development process.  A CASE tool is a.
These materials are prepared only for the students enrolled in the course Distributed Software Development (DSD) at the Department of Computer.
109 Civil Engineer Support Equipment SEABEE COMBAT WARFARE NCF OFFICER SPECIFIC.
Project quality management Cody Ronning 3/23/2015.
EHS Fire Safety Goals and Measures for 2005 Goals and Measures for 2005 Fire Safety on the March.
Claims Flowchart Improvement Abdulrahman Al-Wohaibi KFUPM | CEM515 | Dr. Abdulaziz Bo-Bsahit.
Pertemuan 25 Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
KFUPM, Department of Construction Engineering and Management CEM 520 LIABILITY ALLOCATION AMONG THE PARTIES TO FIXED-PRICE CONSTRUCTIN CONTRACTS IN SAUDI.
Fundamentals of Information Systems, Second Edition
Mitun PatelMXP07U. Organisational structure Top management; this includes the organisation’s general manager and its executives Department managers; this.
SEO PACKAGES. Types of Plans Starter Plan Business Plan Enterprises Plan.
Done by: Abdulrahman A. Al-Hussain I.D Done for: Prof. Abdulaziz Bubshait Term 082 – June 2009 King Fahd University of Petroleum and Minerals.
SQA Work Procedures.
ولقد خلقنا السماوات والأرض وما بينهما في ستة أيام وما مسنا من لغوب (سورة ق )
Firefighter III Introduction Mod A Identify the Firefighter III’s role as a member of the organization. (4-2.1) The role of a firefighter III.
© 2006 ITT Educational Services Inc. SE350 System Analysis for Software Engineers: Unit 6 Slide 1 Chapter 5 Initiating and Planning Systems Development.
Bridge Engineering Section Bridge Rehabilitation.
CEM 515 Saeed A Al-Saeed (936091) Prepared for Dr. Abdulaziz A. Bubshait.
CSI315 Web Applications and Technology Overview of Systems Development (342)
SYSTEMS ANALYSIS FORM 4 Included in this topic: Information Systems Systems Analysts System Life Cycle (incl. Case Study) Documentation.
GlobalProjectManagement.org 1 PROJECT Lessons learned.
Chapter 8: Actor-System Interaction Modeling
University of Palestine Faculty of Applied Engineering and Urban Planning Software Engineering Department Prepared By Ahmed Obaid Wassim Salem Supervised.
EU-TURKEY CHAMBER FORUM PROJECT (ETCF) ETCF is funded by the European Union. 1 EU-TURKEY CHAMBER FORUM EU TURKEY CHAMBERS PARTNERSHİP GRANT SCHEME PROCUREMENT.
Project management Dr. Khaled Bubshait 1 Dr. Khaled A. Bubshait Project Management.
Chapter 18 cont.. Sub Assemblies  Smaller assembly that is part of a larger assembly  Drawings for subassemblies are shown in their own assembly drawings.
CHAPTER#17 ENGINEERING MAINTENANCE MANAGEMENT Lecture No. 16Course: Engineering Management MED DEPARTMENT, U.E.T TAXILA COURSE INSTRUCTOR : PROF. DR. SHAHAB.
Fundamentals of Information Systems, Second Edition 1 Systems Development.
Configuration Management and Change Control Change is inevitable! So it has to be planned for and managed.
TQM Study For Telecom Towers King Fahd University of Petroleum & Minerals Department of Construction Engineering & Management CEM 515: Project Quality.
SFTW241 Programming Languages Architecture I University of Macau Faculty of Science and Technology Computer and Information Science Year2 Class A Group.
GROUP 2 HARDIK SEMLANI (08FT-79) HIMANSHU GOYAL (08FT-81) KANIKA NAGPAL (08FT-082) MANASI GUPTA (08FT-085) RUBIN JAMES (08FT -099) Business Process Reengineering.
ANALISA & PERANCANGAN SISTEM Disusun Oleh : Dr. Lily Wulandari Program Pasca Sarjana Magister Sistem Informasi Universitas Gunadarma.
NEW TANK REPAIR PRODUCTS INSPECTION COATING Global AST Solutions Provider Since Personal Safety Awareness Initiative.
Process Overview. Page 2 Agenda Problem Reporting and Escalation Procedure RMA Process Overview.
State Codes, Licensing and ITM Updates One stop shop for entering information.
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
King Fahd University of Petroleum & Minerals Department of Construction Engineering & Management CEM 515: Project Quality Management Case study of Implementation.
SYSTEM ANALYSIS AND DESIGN LAB NARZU TARANNUM(NAT)
Software Engineering Process - II 7.1 Unit 7: Quality Management Software Engineering Process - II.
Module Code : AURH453 Management Principles Assessment Number 1 (a) Nature of Industry In the form of an illustrated written report Weighting : (part)
My Internship at Saudi Aramco Company
ECVET PERMIT: methodology
Software Project Configuration Management
Mechanical Engineering Facilities Engineering
VCE Product Design and Technology
4.2 Contract preparation and signature
4.4 Procurement by grant beneficiaries
PROCESS IMPROVEMENT OF AL-REYAD COMPANY
Clinical Engineering Lecture (3).
Systems Development and Documentation Techniques
MnDOT Office of Civil Rights Disadvantaged Business Enterprise (DBE) Special Provisions Update March 2017.
GE 6757 TOTAL QUALITY MANAGEMENT
Fire Extinguisher Monthly Inspection
Aftermarket Parts and Services
In the Name of God Most Greasiest the Most Merciful
ECARS - INCOMPLETE SERVICE REQUESTS.
Chapter # 5 Supporting Quality Devices
This presentation has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational purposes.
CIM Cooperative Work Program (COOP)
Presentation transcript:

In the Name of God Most Greasiest the Most Merciful

Construction Engineering And Management Department CEM 515 Semester th march 2009

FLOWCHRAT

Supervised by Dr. Abdulaziz Bubshait

Request of fire extinguisher Process at KFUPM Presentation of

Prepared by AL-Yamani Muhammad

Problem Description The “ delay in the response ” to a request of inspection a fire extinguisher, was a major problem facing the S.S department, that which had always negatively affect our commitment to OSHA codes. Next, we can see the key steps of the overall process, which called “ High level Process Diagram. ”

High level Process Diagram

Request Restore data Check Fire Extinguisher Tack needed action

FLOWCHART TECHNIQUE Pre to flowchart Technique – one of the quality tools - those steps of the process must to be brought to the detailed level. the purpose of that is to locate the roots of delaying the responses to the request of the customer. After locating those roots, redesigning and modifying the process flowchart will help in improving the response time.

Detailed Process Flowchart

Customer Customer D.G. D.G. Contracted Contracted Company Company Secretary Secretary Safety Safety Technician Technician IT IT Classify Request Receive Request Send to Safety Technician Receive Request Accomplish Request Inform Customer Receive Request Send To Contracted Company Report To D.G Assign Safety Technician Take needed Action Evaluate Fire Extinguisher Submit Request Date Update Need maintenance Need Replacement Data Restore

Customer Customer D.G. D.G. Contracted Contracted Company Company Secretary Secretary Safety Safety Technician Technician IT IT Classify Request Receive Request Send to Safety Technician Receive Request Accomplish Request Inform Customer Receive Request Send To Contracted Company Report To D.G Assign Safety Technician Take needed Action Evaluate Fire Extinguisher Submit Request Date Update Need maintenance Need Replacement Data Restore

Receive Request Accomplish Request Inform Customer Receive Request Send To Contracted Company Report To D.G Take needed Action Evaluate Fire Extinguisher Submit Request Date Update Need maintenance Need Replacement Data Restore C.C. of the Request RequesterD.GSafetyDepartmentContractorIT

Conclusion The effectiveness of this methodology can be easily noticed throughout its direct outcome in a form of the saved time. The practical implementation of the shown modifications resulted a saving in the response time upto (50%).

Thank you