Dennis Prentice – Project Manager (ME) Anthony Culotta – Mechanical Engineer Jason Nichols – Mechanical Engineer Belinda Segui – Electrical Engineer Sponsor/Advisor:

Slides:



Advertisements
Similar presentations
Community Preparation for Caring for Mechanical Circulatory Device Patients University of Wisconsin Hospital And Clinics Ventricular Assist Device Program.
Advertisements

1 Distribution Capacity Analysis P09721 MSD II Final Presentation Distribution Capacity Analysis P09721 MSD II Final Presentation Aaron Heyman – Lead Jose.
P11462: Thermoelectric and Fan System for Cook Stove Jared RuggProject Manager (ME) Brad SawyerLead Engineer (ME) Jeff BirdMechanical Engineer Tom GorevskiElectrical.
Dennis Prentice – Project Manager (ME) Anthony Culotta – Mechanical Engineer Jason Nichols – Mechanical Engineer Belinda Segui – Electrical Engineer Sponsor/Advisor:
P10057: Delivery and Scale-Up of a Monitoring Device for Human Smoking Behavior Ryan Miller – Project Manager Chris Oxley – Lead Engineer Ryan Enyeart.
Project Review. Current State Currently on track to meet our mission objectives and cover all customer needs – Unpredictable to know whether or not sensors.
MSD-I Project Review Modular Motion Tracking Sensors 1.
6/10/2015SYSTEMS LEVEL DESIGN REVIEW 1 HEALTH-MONITORING OF A RECIPROCATING COMPRESSOR MSD1 – P12453 SYSTEMS LEVEL DESIGN REVIEW.
P08009 Audible Memo Board Phase II Friday, February 22, 2008 P08009: Audible Memo Board Phase II Sponsor: Dr. Hopkins Advisor: Professor Slack Jon GosligaElectrical.
P10054 Enhancements to Cigarette Smoking Machine Senior Design Fall/Winter 2009 Team Lead Frank Forkl (ME) Slide 1 of 8 P10054.
Project Reviews.1 KGCOE Multidisciplinary Sr. Design Borkholder 2006 R I T MSD I Project Review Objectives of the Project Review Proposed Review Structure.
Project Status Update II R09230: Open Architecture, Open Source Unmanned Aerial Vehicle for Imaging Systems A. Benjamin Wager (ME) B. Michael Skube (ME)
EDGE™ Centering Magnet Device P08028 By: Aaron Burger.
04013 Micro Turbine Senior Design Micro Turbine Senior Design CDR – May 14 th, 2004 Project
Space Engineering Institute (SEI) Space Engineering Research Center Texas Engineering Experiment Station, Texas A&M University Integrated Thermal Energy.
Detailed Design Review of Magnetic Field Centering Device Project # P08028 “Develop a Design and Methodology to Ensure the Concentricity between the Magnetic.
Jon Klein Project Manager Kyle Menges Technical Lead Priya Narasimhan Electrical Engineer Julie Coggshal Industrial and Systems Engineer Christine Lowry.
FINAL PRESENTATION P The Team Austin Frazer Role: Lead Engineer - Analysis Major: Mechanical Engineering Eileen Kobal Role: Lead Engineer – Mixtures.
Systems Engineer An engineer who specializes in the implementation of production systems This material is based upon work supported by the National Science.
Introduction to Ventricular Assist Device (VAD)
3D Imaging Software Brad Boldizar, Aubrey McKelvey, and Mackenzie Thomas Advised by: Dr. Paul King Matt Moore.
Team Members: Allen Baragar Dustin Thompson Jose Membreno Katelyn This
Design Completion A Major Milestone System is Presented to Users and Management for Approval.
Jon KleinISEProject Manager Nguyen VuMETechnical Lead Kyle MengesMETechnical Lead Christine LowryMEDesign Engineer Chris SteinMEDesign Engineer Priya NarasimhanEEElectrical.
Transmission Oil Pump Audit Test Stand Project Overview.
Gravity Fed System Team Members: James Brinkerhoff, Christopher Kulbago, Patrick O’Connell, Lauren Pahls, Ted Rakiewicz, Sarah Salmon Group Number: P13631.
Feasibility Study.
Automatic Shift Controls for ATV Sponsored by: Joel Notaro Polaris Industries Advised by : Professor George Slack Project Family: Modular, Scalable, Open.
Mike Allocco, Soham Chakraborty, Leslie Havens, Danielle Koch, Andrew Miller, Kristeen Yee, Stephanie Zambito TEAM 14026: SYSTEM DESIGN REVIEW P14026_System.
MSD I – Mid Project Presentation Winter 08/09 P09454: Design & Testing of Centrifugal Pump Components.
Heather Beam Thomas Bean Megan Chapman Steven Geiger Kimberly Keating.
Microbial Detection Arrays Interim Review I February 6 th, 2007 Aerospace Senior Projects University of Colorado – Boulder Advisors: Dr. Forbes and Dr.
Preliminary Detailed Design Review P15080 Flow Culture System November 13, 2014.
Team Members: Allen Baragar Dustin Thompson Jose Membreno Katelyn This MECT 4275 Spring 2014 Industrial Advisors: Paul Tyllick- System Interface Supervisor,
Nick Dominesey Matthew Myers Michael Edson Ellie Sanford Chris Smith Jason Inman.
Kaitlin Peranski Spencer Wasilewski Kyle Jensen Kyle Lasher Jeremy Berke Chris Caporale.
Gravity Fed System Team Members: Chris Kulbago, Lauren Pahls, Ted Rakiewicz, Patrick O’Connell, Sarah Salmon, James Brinkerhoff Group Number: P
Joe TartakoffCustomer/Graduate Matthew MyersISE Project Nick DomineseyME Lead Jason.
Tracheostomy Care Overlay System J. Biggs, D. Bond, N. Campagnola, E. Doll, N. Hott Advisor: Dr. Liyun P. Wang Special Thanks to: Amy Cowperthwait UD Healthcare.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
Jon KleinISEProject Manager Nguyen VuMETechnical Lead (MSD1) Kyle MengesMETechnical Lead Christine LowryMEDesign Engineer Chris SteinMEDesign Engineer.
P12022: LVAD P OWER T RANSMISSION T EST R IG Erin McNally Pedro Baez Paul Parthemore Kris Stichter.
Air Conditioning Experiment Department of Mechanical Engineering University of Delaware.
Path The purpose of this project is to design a universal data recording device to monitor the health of a Dresser-Rand compressor during operation. In.
Maintaining and Sustaining System Integrity Configuration Management for Transportation Management Systems Configuration management (CM) describes a series.
P08311: FPGA Based multi-purpose driver / data acquisition system Sponsor: Dr. Marcin Lukowiak Team MemberDisciplineRole Andrew FitzgeraldCEProject Manager/FPGA.
P16680: AATech Universal Oil and Bag System System Design Review 9/29/15.
Electrophotographic Cascade Development Apparatus Team 15503:Zach Foggetti (ME) Dalton Mead (ME) Bridget Kearney (EE) Ruishi Shen (ISE) Tom Wossner (ME)
What has been accomplished at the end of MSD 1 & 2?
Allen Luccitti (ME). Mission Statement Product Description ▫ Test stand consisting of a centrifugal pump, closed loop flow system with control through.
P P09042 : Lap Band Test Stand Ilya RivkinTeam Lead(EE) John MatrachisiaLead Engineer (ME) Michael BatykoMechanical Engineer Kevin SandoMechanical.
Robotics Engineering and Computer Aided Design By: Andrew Steele Mentor: Anthony Lapp, NASA Engineer Mentor Workplace: Johnson Space Center Teacher: Mrs.
P10203 LV1 MOTOR CONTROLLER FINAL REVIEW MAY 14, 2010 Electrical: Kory Williams, Adam Gillon, Oladipo Tokunboh Mechanical: Louis Shogry, Andrew Krall.
Midpoint Project Review P10454 VAD Test Loop
P07307: Controls for Dynamic Suspension
Turbomachinery Flow Visualization P08453
P10021 – Miniaturization Team
HEMODYNAMIC SIMULATOR II P09026
HEMODYNAMIC SIMULATOR II P09026
P07021: Instrument to Detect Thromboemboli
Heart Pump and Circulatory System
Survival on the Heart Transplant Waiting List: Impact of Continuous Flow Left Ventricular Assist Device as Bridge to Transplant  Jaimin R. Trivedi, MD,
Elucidating the intricate mechanisms of gastrointestinal bleeding in a continuous-flow left ventricular assist device will lead to future therapeutic.
Mechanical circulatory assist device development at the Texas Heart Institute: A personal perspective  O.H. Frazier, MD  The Journal of Thoracic and Cardiovascular.
Left Ventricular Assist Device Inflow Angle and Pump Positional Change Over Time Adverse Impact on Left Ventricular Assist Device Function  Toshinobu.
Early Outcomes With Marginal Donor Hearts Compared With Left Ventricular Assist Device Support in Patients With Advanced Heart Failure  Erin M. Schumer,
P18325: Automated Breast Pump Cleaning System (Team ABC’s)
Detailed Design Review Solar Thermal Water Heater
Simulation in cardiothoracic surgical training: Where do we stand?
Team Members: Sagar Sheth Team Leader Leonardo Silva Industrial Eng.
Presentation transcript:

Dennis Prentice – Project Manager (ME) Anthony Culotta – Mechanical Engineer Jason Nichols – Mechanical Engineer Belinda Segui – Electrical Engineer Sponsor/Advisor: Dr. Steven Day Advisor: Dr. Rick Lux On Site Customers: Dr. Bill Hallinan and Dr. Todd Massey

 A working replica of a human thoracic cavity to use as a surgical training device for implanting a left ventricular assist device (LVAD)  Market: Surgeons training for this surgery Companies such as Thoratec, which create LVADs and may desire to provide training services

 Pressurized Heart  Surgical Field/Confined Workspace  Cleanable  Replaceable Connected Tubing to Heart  Ease of Storage  Durability  Quick Setup and Teardown  Match Average Patient

 Fluid/Control Subsystem  to provide pressurization and proper flow rate to the heart  Reservoirs and material selection provide the ability for it to be cleaned  Ribs/Frame  Dimension of trainer matches that of an average patient  Organs/Organ Tray  Incorporation of lungs, diaphragm, abdominal pocket and skin provide the appropriate surgical field and confined space

 Control System Labview Program and DAQ were tested with simulated inputs Test was successful  Pressure Sensor was tested to find successful calibration  Pump was tested to confirm that it provides the proper pressure and flow rate needed This was barely achieved

 The entire system was tested and successful integration was seen.  A real heart was not obtained, so tests requiring one were not able to be performed. Quick heart-to-tubing connector verification Actual heart pressurization/incorporation into system Quick setup and teardown verification

Project Status: Plan vs Execution  Project is on schedule Risks mitigated:  All material arrived on time  Machined and built in timely fashion  LabView successfully programmed  Demo completed on time Everything that could be tested in a timely fashion was  Still need to show to Bill Hallinan and Dr Massey

$$ Budget $$  Overall proposed budget: $1, The total had we not had items donated: $2,  We spent a little over our proposed budget due to not accounting for the shipping and handling costs Actually have a few extra materials/supplies

Overall Evaluation:  MSD II went much smoother than MSD I Followed schedule more closely Followed Plans and design almost to the letter  Met most specifications All important needs met  Test plans executed for major specs, minus ones requiring an actual heart  Focused more on getting trainer built rather than testing small components for verification

From Here?  It may be nice to have a 2 nd Generation of the project Test what we could not  Design to meet specs that P10023 did not meet