HLT Collaboration (23-Jun-15) 1 High Level Trigger HLT PRR Planning Volker Lindenstruth Kirchhoff Institute for Physics Chair of Computer Science University.

Slides:



Advertisements
Similar presentations
IEEE/FIPA WG Mobile Agents Ulrich Pinsdorf Fraunhofer-Institute IGD, Germany Dept. Security Technology
Advertisements

Status of the CTP O.Villalobos Baillie University of Birmingham April 23rd 2009.
HLT Collaboration; High Level Trigger HLT PRR Computer Architecture Volker Lindenstruth Kirchhoff Institute for Physics Chair of Computer.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
Torsten Alt - KIP Heidelberg IRTG 28/02/ ALICE High Level Trigger The ALICE High-Level-Trigger.
Stefan Moeller XES FAC Review – April 16, 2006 X-Ray Endstation Systems (XES) Status Stefan Moeller.
CHEP04 - Interlaken - Sep. 27th - Oct. 1st 2004T. M. Steinbeck for the Alice Collaboration1/20 New Experiences with the ALICE High Level Trigger Data Transport.
CHEP04 - Interlaken - Sep. 27th - Oct. 1st 2004T. M. Steinbeck for the Alice Collaboration1/27 A Control Software for the ALICE High Level Trigger Timm.
Update on DAQ Klaus Schossmaier CERN PH-AID ALICE TPC Meeting 21 April 2006.
> IRTG – Heidelberg 2007 < Jochen Thäder – University of Heidelberg 1/18 ALICE HLT in the TPC Commissioning IRTG Seminar Heidelberg – January 2008 Jochen.
Timm M. Steinbeck - Kirchhoff Institute of Physics - University Heidelberg - DPG 2005 – HK New Test Results for the ALICE High Level Trigger.
1 HLT – ECS, DCS and DAQ interfaces Sebastian Bablok UiB.
CHEP03 - UCSD - March 24th-28th 2003 T. M. Steinbeck, V. Lindenstruth, H. Tilsner, for the Alice Collaboration Timm Morten Steinbeck, Computer Science.
Project Plan The Development Plan The project plan is one of the first formal documents produced by the project team. It describes  How the project will.
1 FEE Installation & Commissioning TPC Meeting, 21 April 2006 L. Musa.
Jochen Thäder – Kirchhoff Institute of Physics - University of Heidelberg 1 HLT for TPC commissioning - Setup - - Status - - Experience -
Timm M. Steinbeck - Kirchhoff Institute of Physics - University Heidelberg 1 HLT and the Alignment & Calibration DB.
PXL Electronics Status update for HFT TC meeting on May 11, 2010 at LBNL 1HFT TC 05/11/ LG.
Hans-Åke GustafssonLHCC review January 31, ALICE meets LHCC referees 31/01/ :00  Milestones report H-A Gustafsson  FMD questions H. Boggild.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
MSS, ALICE week, 21/9/041 A part of ALICE-DAQ for the Forward Detectors University of Athens Physics Department Annie BELOGIANNI, Paraskevi GANOTI, Filimon.
ALICE O 2 Plenary | October 1 st, 2014 | Pierre Vande Vyvre O2 Project Status P. Buncic, T. Kollegger, Pierre Vande Vyvre 1.
TMDB delay and production plan Augusto. TMDB Prototype Status The prototype boards almost fully assembled should be delivered this week ( May 5 th ) First.
The High-Level Trigger of the ALICE Experiment Heinz Tilsner Kirchhoff-Institut für Physik Universität Heidelberg International Europhysics Conference.
CLBv2 Planning: Production of 6 prototypes -> December st Pre-serie 50 units -> April 2014 (following with the current planning) (Need to purchase.
DCS Ethernet Switch Volker Lindenstruth Kirchhoff Institute for Physics Chair of Computer Science University Heidelberg, Germany Phone:
ALICE DAQ Plans for 2006 Procurement, Installation, Commissioning P. VANDE VYVRE – CERN/PH for LHC DAQ Club - CERN - May 2006.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
Fermilab User Facility US-CMS User Facility and Regional Center at Fermilab Matthias Kasemann FNAL.
Status and plans for online installation LHCb Installation Review April, 12 th 2005 Niko Neufeld for the LHCb Online team.
SPSC Questions to the 2014 NA62 Status Report 1 Beam: which is the beam structure expected in October? Which is the intensity you can reasonably expect?
SALTRO TPC readout system Presented by Ulf Mjörnmark Lund University 1.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
ALICE Upgrade for Run3: Computing HL-LHC Trigger, Online and Offline Computing Working Group Topical Workshop Sep 5 th 2014.
DAQ & ECS for TPC commissioning A few statements about what has been done and what is still in front of us F.Carena.
1 Status and Plans DCS workshop L.Jirdén u Budget u Status u Planning u Goals for end 2002.
Project Overview How to get here…. Half Way to the Test Run October 18, 2012HPS Project Overview2 …starting from here? John Jaros HPS Collaboration Meeting.
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
A need exist to define & establish Consumer replacement services and Technology to replace absolute technology to enable automation of all existing manual.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
Volker Lindenstruth ( Kirchhoff Institute for Physics Chair of Computer Science University Heidelberg, Germany Phone:
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
US ATLAS Tier 1 Facility Rich Baker Brookhaven National Laboratory Review of U.S. LHC Software and Computing Projects Fermi National Laboratory November.
Hall-D/GlueX Software Status 12 GeV Software Review III February 11[?], 2015 Mark Ito.
ESFRI & e-Infrastructure Collaborations, EGEE’09 Krzysztof Wrona September 21 st, 2009 European XFEL.
All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule.
15/2/2006 LHCC Status Report J. Schukraft General News LHC progress & Schedule  continuing well, approx 2-4 month delay in some areas  NEW schedule:
CERN September 29, 20041W.H.Trzaska HIP Jyväskylä T0 – TDR 22 nd LHCC meeting; Open Session CERN, September 29, 2004 W.H.Trzaska (for T0 collaboration)
CM19 Vassil Verguilov DAQ Status  Progress  DAQ  Next steps  Summary.
CD FY09 Tactical Plan Status FY09 Tactical Plan Status Report for Neutrino Program (MINOS, MINERvA, General) Margaret Votava April 21, 2009 Tactical plan.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
O 2 Project Roadmap P. VANDE VYVRE 1. O2 Project: What’s Next ? 2 O2 Plenary | 11 March 2015 | P. Vande Vyvre TDR close to its final state and its submission.
The Worldwide LHC Computing Grid Introduction & Housekeeping Collaboration Workshop, Jan 2007.
1 DCS Status & Plans 22 June 2004 L.Jirdén. 2 URD Status DCS Detectors TOF SPDSDDSSD TPCTRDZDCPMDHMPITS PHO CPVCAL FMDV0T0 TRATRG MU ACCEMC HV LV FEE.
R.Divià, CERN/ALICE 1 ALICE off-line week, CERN, 9 September 2002 DAQ-HLT software interface.
COMPASS DAQ Upgrade I.Konorov, A.Mann, S.Paul TU Munich M.Finger, V.Jary, T.Liska Technical University Prague April PANDA DAQ/FEE WS Игорь.
Time to resolve Design Issues 1. Disclamer Due to the engineering meeting last week I have not had time to coordinate this material with Tim or the L3.
09/05/2006Project Status Report1 Nova DAQ Software Development Project Status Update for 09/05/2006 Gerald Guglielmo (CD/CEPA/OAA)
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
HFT Overview Flemming Videbæk BNL 3/14/12 F2F LBNL.
TPC Commissioning: DAQ, ECS aspects
ProtoDUNE SP DAQ assumptions, interfaces & constraints
Slice Test Planning Schedule(s) and Milestones.
New Calorimeter Trigger Receiver Card (U. Wisconsin)
CMX Status and News - post PRR -
Commissioning of the ALICE-PHOS trigger
TSF Upgrade Project Overview Resources Plans and Timetable
Project Phases ‘98 ‘00 ‘02 ‘04 ‘06 Preparatory Phase
Presentation transcript:

HLT Collaboration (23-Jun-15) 1 High Level Trigger HLT PRR Planning Volker Lindenstruth Kirchhoff Institute for Physics Chair of Computer Science University Heidelberg, Germany Phone: Fax: WWW: L0 L1 L2 HLT

HLT Collaboration (23-Jun-15) 2 HLT LHCC Milestones - status 542: RORC PPR (FPGA decision), Sep-05 –A number of suitable FPGAs were evaluated and a preliminary decision was taken. –The H-RORC design is progressing and details are being optimized such as packaging and chip size versus cost. We expect to have a small number of prototype modules ready for the RORC PRR in September 2005.DONE 543: HLT PRR (including network), Apr-06 –A number of HLT integration tests and data challenges have been and are currently being conducted. Most components are available to date. –We expect to have a prototype available in due time for the PRR. Delayed 1 month 544: Start of HLT commissioning, Sep-06 –This milestone requires the first batch of all production modules to be available, allowing 4 months for the production of the HLT specific hardware, such as the RORCs, which is feasible. STARTED 545: HLT with full connectivity - approx 30% computing power, Apr-07 –The required compute power for the first running will be evaluated and decided by the collaboration. Noting that the HLT can be segmented into independent sub-parts, for instance serving a TPC sector each, the commissioning can be well done between Sept-06 and April-07 ON TRACK 546: HLT fully installed for HI (3 months prior scheduled full HI run), Apr-08 –This milestone basically requires the ordering and installing of the remaining computer resources (PCs) and their infrastructure, which does not present a particular challenge. ON TRACK

HLT Collaboration (23-Jun-15) 3 HLT combined Milestones status Milestone 540: combined Trigger/DAQ/HLT/TPC tests at SXL May ’06ON TRACK –TRG: LTU –DAQ: »DDLs from SXL to CR1 and CR2 »DATE V5.13 –HLT Mode A –HLT Mode B »All physics raw data to HLT. HLT results read back by DAQ. Milestone 541: large scale test (2 TPC sectors) of data distribution to HLT and final DAQ software for HLT decision handling June ’06ON TRACK –TRG: LTU –DAQ: same as above. –HLT Mode C »All physics raw data to HLT. HLT results read back by DAQ. HLT decisions applied by DAQ