GLAST LAT Project Oct 5, 2007 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems Engineering.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
Advertisements

GLAST LAT Instrument 1 Summary of Progress  Completed TVAC with no additional reboots  Ran refresh rate test showing that the refresh rate was not an.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 5 of 12 Subsystem Acceptance 1 GLAST Large Area Telescope Pre-Environmental.
GLAST LAT Instrument GLAST Monthly Mission Review May 2, 2007 K.A. Fouts, SLAC 1 Monthly Mission Review Project Status Overview May 2, 2007 Ken Fouts SLAC.
1 GLAST Large Area Telescope Monthly Mission Review LAT Flight Software Status June 6, 2007 Jana Thayer Stanford Linear Accelerator Center Gamma-ray Large.
© 2007 General Dynamics. All rights reserved. Integrated Space Systems 1196 EB-R GLAST Pre-Ship Review (PSR) LAT Payload I&T Review CONTRACT NO.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT Project LAT System Engineering 1 Test Definition Planning Pat Hascall SLAC System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Instrument GLAST Monthly Mission Review October 29, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview October 29, 2007 Ken.
1 GLAST Large Area Telescope Monthly Mission Review LAT Flight Software Status October 29, 2007 Jana Thayer Stanford Linear Accelerator Center Gamma-ray.
GLAST LAT Project June 6, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall.
GLAST LAT Project Aug 1, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems.
1 GLAST Large Area Telescope Monthly Mission Review LAT Flight Software Status May 2, 2007 Jana Thayer Stanford Linear Accelerator Center Gamma-ray Large.
GLAST LAT Instrument GLAST Monthly Mission Review October 5, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview October 5, 2007 Ken Fouts.
GLAST LAT Project IA weekly meeting, February 3, 2006 ACD subsystem Alex Moiseev 1 ACD Pedestals ACD Team at Goddard: Alex Moiseev Dave Thomspon Bob Hartman.
GLAST Large Area Telescope Instrument Flight Software F2F Meeting March 17, 2005 Jeff Fisher FSW Manager Stanford Linear Accelerator Center Gamma-ray Large.
GLAST LAT Instrument GLAST Monthly Mission Review July 12, 2007 N. Johnson, NRL 1 Monthly Mission Review Project Status Overview July 12, 2007 Neil Johnson.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Project July 12, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall.
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
GLAST LAT Project Technical/Cost/Schedule Review 03/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review LAT Test Verification Process Presentation 4 of 12 GLAST Large Area Telescope Gamma-ray Large.
GLAST LAT Project28 March 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review LAT Requirement Verification Presentation 5 of 12 GLAST Large Area Telescope Gamma-ray Large Area.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
GLAST LAT Project Oct 5, GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems Engineering.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST Large Area Telescope ISIS Post Acceptance Test Review 28 January 2005 ISIS Completion Status Jana Thayer Stanford Linear Accelerator Center
GLAST LAT Project May 2, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Current Status Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Diagnostics Framework James Swain Stanford Linear Accelerator.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Project ACD G3 Talks - 1 March, Gamma-ray Large Area Space Telescope GLAST Large Area Telescope GASU Based Trigger Systems Jim Panetta.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Software Watchdog Steve Mazzoni Stanford Linear Accelerator.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 8 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Systems Engineering Mike DeKlotz GSFC Stanford Linear Accelerator Center Gamma-ray Large.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Suites (Backup) Stanford Linear Accelerator Center Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectGSFC Monthly, 30 March 2006 LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering LAT Quality Assurance Pat Hascall.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST LAT Project5 April 2006 LAT System EngineeringLAT Verification Process GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR FSW Overview Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Software Quality Assurance Kelly Burlingham SQE Stanford Linear Accelerator Center Gamma-ray.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 D. Nelson 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Instrument Configuration by File James Swain Stanford.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
EMI/EMC GLAST Large Area Telescope LAT Pre-Shipment Review
GLAST Large Area Telescope:
GLAST Large Area Telescope
Gamma-ray Large Area Space Telescope
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST LAT System Engineering
GLAST Large Area Telescope:
Thermal Vacuum Test: Plans and Procedures
GLAST LAT System Engineering
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope: I&T Test Readiness Review
GLAST Large Area Telescope
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT Project Oct 5, GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems Engineering Joe Cullinan Quality Stanford Linear Accelerator Center Gamma-ray Large Area Space Telescope

GLAST LAT Project Oct 5, LAT Test Status –Radiator Installation Electrical test completed –Performed Absolute Time Retest –Performed Pre Vib Aliveness Test –Performed Post Z Axis Aliveness Test –Performed Post XY Axis Aliveness Test –Performed Post Shock Aliveness Test Included no chiller test to assess margin for launch base operations –Issues seen Thermistor swap Blob in recon plot FREE 5 power up

GLAST LAT Project Oct 5, Thermistor Swap Issue –During aliveness test data review, thermistors were observed to be swapped as follows: L_MCH_PY_R_HTRV and L_MCH_PY_P_HTRV L_MCH_NY_R_HTRV and L_MCH_NY_P_HTRV Analysis –Previous data reviewed and swap was confirmed –Continuity of all 4 paths on the spacecraft B side was confirmed –Source of the swap has not yet been determined LAT TV test was as expected Spacecraft pre-LAT integration electrical checkout as expected Resolution –Tim is working on a data base update to swap the telemetry points Impacts –None

GLAST LAT Project Oct 5, The Blob Issue –During the post XY vib aliveness test, “The Blob” was seen on one of the recon report plots Analysis –Background The digi report is the primary tool for review of science runs The recon report provides a few additional plots One of these plots shows a map of the event trajectories We expect the highest rate of events coming straight down, with the rate falling off away from the vertical –Review of plots from the entire sequence (including high bay) indicates that “The Blob” is the door to the test chamber

GLAST LAT Project Oct 5, Post XY Reconstructed Event Direction The Blob Plot shows counts of events with particular destinations, so events entering a door on the –x side of the LAT show up on the +x side of the plot

GLAST LAT Project Oct 5, Recon Plot Sequence High Bay Testing Post Z axis LAT higher on stand, farther from the door, +x face to west wall. Event counts reduced due to walls Post XY axis LAT lowered, moved closer to the door and rotated +y to west wall Post Acoustics LAT centered in the room and slightly rotated for acoustic test

GLAST LAT Project Oct 5, FREE Power Up Issue –During the post XY aliveness test, config 2, FREE 5 had both veto drivers enabled after power up. Analysis –The power up sequence is: FREE card powered Both veto drivers disabled When the bias voltage is set (for all FREE cards) the desired veto driver is enabled –With both veto drivers enabled, the 3.3V telemetry is slightly decreased for that FREE card and the 3.3V current sum is slightly elevated –Review of historical data in 450 power-ups since early 2006 Showed 15 previous incidents starting in September All but 1 using redundant GASU Appears equally likely across FREE cards –Likely cause for the redundant GASU cases was determined (courtesy Erik Siskind) and the fix addressed in JIRA FSW-1001 –The configuration 1 instance is still being investigated Appears to be a power up susceptibility –Data from 248 power ups through the primary GASU resulted in a single instance (both FREE 7 and 11) –Same command path used for LATC operations (about 400 interactions per run per FREE card), with no issues observed Mechanism not yet understood

GLAST LAT Project Oct 5, FREE Power Up (continued) Resolution –JIRA-1001 was approved and will be implemented in the next FSW load Impacts –In all cases, the FREE card properly responded to the command that sets the bias voltage, resulting in the desired veto driver configuration

GLAST LAT Project Oct 5, Operating Hours As of Sept 4, 2007 the LAT passed 600 operating hours since the timer fix was installed As of Sept 20, the LAT is at 630 operating hours since the timer fix was installed B1.0.1 has 209 operating hours UnitHours SC-P1922 SC-R2111 SIU-P Feed1965 SIU-R Feed2068 Pri Htr Feed1992 Red Htr Feed2040 SIU-P1965 SIU-R2068 GASU-P1923 GASU-R2110 EPU-P02052 EPU-P13910 EPU-R2104 Towers4033 ACD4033 ACD HV11947 ACD HV Y HCB4033 -Y HCB4033 PDU-P1967 PDU-R2066

GLAST LAT Project Oct 5, NCR Summary Status Closure Plan DefinitionCount Work continuing QARCND or other issue transferred to a QAR9 Draft of closure statement for reboot NCRs/QAR prepared, currently in review

GLAST LAT Project Oct 5, LAT Level Verification Status Progress this month –All 458 VPs are Final –1 New VP moved to approved from conditionally approved (EMI test report released) –410 of 411 VPs planned for execution have been approved by GSFC 1 SRD VP (Background Rejection) in work by GSFC Status –VCRM version 27 released –All deferred GRB reqts will be sold post FSW B1.0 installation