Conditioning the new bag DAY 1: 25 Feb 2008. Particle number concentration (wcpc 3786) Lights on at 15:58.

Slides:



Advertisements
Similar presentations
ALL CLUBS MEETING 2. Dont publicize until you have received an saying your event has been approved Turning in forms early = more publicity time.
Advertisements

Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0.
Taking the Password Knowledge and Writing Test
FoamPro 1600 Series Fully automatic Class A foam ONLY
StatSensor® Creatinine Operator Training Program
This is a guide for using the Zeiss LSM510 Confocal Microscope. Do not attempt to use this microscope without the proper training. If you have any queries.
Limonene 50ppb on b-caryo 50ppb seed Chamber DMPS setup using wCPC 3786 (software thinks it is 3785)
A-Pinene 50ppb Nox 33 ppb Fill completed, allowing 20 min for instruments to stabilise and measure background.
Meso: Exp 15 Figs1-Exp6 5ppb Limonene and 20ppb O
Background Lights on at 11:23 DMPS is not reading the 3025 on the short DMA.
Isoprene 300ppb on Beta-Caryo SOA VOC/NOx
Chamber Background Friday Lights on 10:39 Long DMA has a leak… ignore the first few points.. An update is in the next slide..
Chamber Background Friday 14 March Still 5000 p/cc just before the final fill is supposed to start! Bag is NOT clean enough, will do a couple more.
Limonene 250ppb NOx 136 ppb Tuesday Stopped pre-exp to do more cleaning… particle numbe 32cm-3.
First Background Exp Friday 29 Feb First Bkgd Exp after 4 days of harsh O3/lights cleaning Conditions: –RH between 50 – 60% (sensirion is not working)
B-Caryophyllene 250ppb NOx 130ppb Thursday
Limonene 50ppb on B-Caryo SOA Final flush!!
Limonene 50ppb on Beta-Caryo SOA Lights on at 09:49.
IR2 Vacuum Status M. Sullivan for S. Ecklund, A Fisher, S. Novokhatski, F-J Decker, A. Kulikov, S. DeBarger, U. Wienands, S. Gierman, M. Petree, many BaBarians.
Beta-Caryophyllene 50ppb NOx 33 ppb RH 50 % First real experiment 12 March 2008.
Background New 3mm thick optical filter
Mesocosm: Figs1 Exp :09 Before final flush Bkgd: 0.14ug/m3 and ~200p/cc.
Limonene 50ppb on Beta-Caryo SOA Lights on at 10:11.
Chamber testing A/C on Flushed and ran 3 fill/flush cycles Fill complete, A/C still on.
Chamber background – brand new bag (first day of use)
Mesocosm: Figs – Exp :57 towards the end of the fill via plant chamber.
Isoprene 300ppb on B-Caryo SOA Seed VOC/NOx
Mix Plants: Exp :45 Pre-exp (during filling)
Limonene 50ppb NOx 54ppb! Tuesday 22 April Lights on at 12:53.
Beta-caryophyllene 250ppb NOx 117 ppb Dp 13.6 Thursday 13 March 2008.
Meso: Figs2 (Benjamina) – Exp :46 after 2 fill/flush cycles.
Beta-Caryophyllene 50ppb New bag Modified pre-exp.
Chamber has just been flushed. CPC counts increased almost immediately after flushing was stopped.
Limonene 4.5ppb O3 20ppb :17 sampling chamber housing air.
Limonene 5ppb, Isoprene 120ppb O3 20ppb
Beta-Caryophyllene 50ppb NOx 37ppb Seed testing.
TRAVEL GEAR. Travel Checklist Jerseys Shorts Shooting shirts Game Socks Adidas Rolling bags Shower Towels and bench towels Laundry baskets Markers + clipboard.
1 Life Products LP-6, LP 6 Plus and LP 10 Home Ventilator By Bryce Younger.
Operation of the S4700 FESEM
PGF follow up procedure 1. What’s required  Contract specifications - Follow up each brief, full & facilitation interventions -1, 3, 6, 12 months after.
Domina PLUS B WORKING DIAGRAMS TROUBLESHOOTING INTERNAL VIEWS WIRING DIAGRAMS INSTALLATION 03 PREVIOUS MODEL.
Contact person: E. Swietlicki, A. Massling NMR – Nordic Aerosol Project DMPS/SMPS Intercomparison Division of Nuclear Physics, Lund University,
Chemical Kinetics TURN ON SPECs NOW!. First things first… Safety: Put bags away Goggles Lab Jacket Gloves Basic Reactants! LAB! Warm up Spec 20.
Measurement of aerosol and VOC turbulent fluxes and in-canopy particle characterization at a pristine forest in Amazonia Luciana Rizzo.
BAKE BROIL - SELECT PROGRAM - CONV BAKE CONV BROIL SELF CLEAN On any diagram screen, double click any of the following components to bring you to a description.
BMC Medical Co., Ltd. Nov Training Course. 1 Table of Contents 1. CATALOGUE 2. INSTALL& DISASSEMBLE 3. SET UP.
GLS PALLET MOVEMENT LIFT DRIVER SCREENS. Putaways  Putaway drivers and replenishment drivers will both login and use the same GLS screen. They will log.
BMC Medical Co., Ltd. Nov Training Course. 1 Table of Contents 1. CATALOGUE 2. INSTALL& DISASSEMBLE 3. SET UP.
© Institute for International Research, Inc All rights reserved. Module 6: Manufacturing Throughput.
How to use the scanner This process will teach you how to use the scanner Press yellow button to turn power on In the top left corner tap “start”
SS Space Science MO&DA Programs - August Page 1 ACE Instrument Status Report Cosmic Ray Isotope Spectrometer (CRIS) Normal Operation. Electron Proton.
TrueSTEAM™ Humidification Systems Module 6: User Interface.
Eight tips for burning wood. Tip 1 Air! The wood is utilised in the best way when the draught control is fully open and the flames are intense. That will.
Pre-Lab 10A: Pure Substance or Mixture
Service Section Technical Training December 2005.
ASCOS planning meeting, 8 th April 2008 IAC ETH Single Particle Chemical Characterization and Measurements of Cloud Condensation Nuclei Berko Sierau, Maria.
© English Language Testing Ltd Taking the Password Knowledge Tests.
CHARMEX VHTMA quick look Operational from: 5th July to 12th of July Selected sizes: 40 nm, 80 nm Oven temperature: 120 o C Problems Charging in DMA at.
Secondary Aerosol Formation from Atmospheric Gas and Particle Phase Reactions of Toluene Department of Environmental Science and Engineering, UNC, Chapel.
BMC Medical Co., Ltd. Nov Training Course. 1 Table of Contents 1. CATALOGUE 2. INSTALL& DISASSEMBLE 3. SET UP.
Data Editing Strategies Common edits Invalidation vs. contamination? What is a considered a spike? What not to edit! Automatic edits Reasons for edits.
MM Status Mostly unchanged (Feb. 3 rd 2016). Parts Mildly modified bridges, allowing to actually move 130nm pickup tools along r*phi –Turned out to be.
Equipment Familiarization Hanse Environmental Inc. VTC Series.
Methane Update and Run Plan Ben Jones. Configuration 8 inch PMT with TPB plate - 8” from alpha source - Now includes magnetic shield - 2 inch PMT without.
Basics of Medical Equipment Lecture 5
Angie’s Top 10 Suggestions to Help you Write Better
Instructions Get a bubble sheet.
500 nm WRITE VOLTAGE 0 V.
Taapsi Ramchandani Setting up the vote center 9:30am – 9:45am
Thursday 30th September De-bunching test
Presentation transcript:

Conditioning the new bag DAY 1: 25 Feb 2008

Particle number concentration (wcpc 3786) Lights on at 15:58

DMPS after one hour of lights on Mass = 11 ugm-3 (density 1), mode about 52 nm

Status at the end of day 1 of cleaning After about 2 hours of lights on, 17 ugm-3 of mass (DMPS) were formed in the chamber and particle size mode was about 70 nm. The bag was flushed and post exp procedures were perfumed. The bag was left full of ozone overnight.

New bag Cleaning: Day 2 Tuesday 26 Feb 2008 Started at 08:50. Bag had 6500 p/cc. Flushed the bag Started pre-exp procedures

Particle number dropped to 40p/cc after the first flush

First fill is complete: 17p/cc

Completed 3 flush/fill cycles Bag is now in flushed position and being tested for leaks…started test at 09:45 and there was a small increase in number but not close to our previous problem!

Ozonolysis increased number dramatically! Lights were turned on at 10:17

Mass and number after 50min of lights on 9.8 ugm-3 and 1.2e5 p/cc

CPC problem!!

16:45 lights off (i.e. cleaned for more than 6 hours) Post-exp procedures started Bag was left full of O3 overnight

18:11Post-exp procedure completed. The Ozone box thinks there is 720 ppb of O3 in the bag

New Bag Cleaning Day 3: 27 Feb 2008

Bag was left full of ozone over night Flushed the bag and started the pre-exp procedures Completed 4 fill/flush cycles Ozone at the beginning is 1.2ppm

Lights on at 10:09 Yellow error sign saying CPC is still in warm up mode (flow range and temp errors)

Last scan before lights on measured 13 ugm-3!! (note the long DMA scan!!)

First scan after lights on measured 77 ugm-3!! (note the long DMA scan!!) DMPS appears to be wet and arcing at high voltages.. The reported mass is wrong

DMPS, mass=9.08, 1 hour after lights on, no arcing on this scan

11:49

End of day 3 Lights were switched off after 5 hours Flushed the bag Performed post-exp procedure Last fill was done manually with O3 pulsing Bag was left with 870 ppb of O3 overnight C:\elena\Tank_Feb_08

New Bag Cleaning Day 4: 28 Feb 2008

First background Exp Flushed the bag from the overnight o3 fill Pre-exp procedure to cycle fill/flush for 4 times Final fill via humidifier and inject NOx Humidifier is NOT working!! Change of plans Another harsh cleaning day (O3 + lights) 980 ppb O3 according to ozone box

Bag is flushed and still: note particle number is slightly increasing (could be mixing or small leak) Most likely it is fresh nucleation! Do it again next time with doors closed

Immediate response to ozone

Response to lights (on at 10:49)

First 10 min after lights on

Fab!! It is now down to 2.3 ugm-3 after 1 hour of lights on

CPC problem appears to be coming back