November 24th, 2005OPERA General meeting1 CS facility A. Ariga, M. Kazuyama, S. Hiramatsu Nagoya University Overview Introduction of components.

Slides:



Advertisements
Similar presentations
BigBite Wire-Chamber Status Report Brandon Craver University of Virginia Hall A Collaboration Meeting June 23, 2005.
Advertisements

1 STILL open points: lead, ECC Packaging, CS laminated film, skates Construction Strategy Working groups BAM design and construction BAM LNGS site preparation.
KLINGE’S NMR 262 Two Independent Systems Integrated into one Unit This Requires Special Features:  Total Redundancy of Refrigeration Components  Total.
Status of the Bologna scanning laboratory G. Sirri for the Bologna Group* Nagoya 7-9 Dec 06 Bologna Group: L. Consiglio (PhD), M. Cozzi, D. Di Ferdinando.
Status of OPERA RPC production. A. Garfagnini Opera collaboration meeting Nagoya, 12 march 2002  RPC production at GT;  Schedule for OPERA in 2002; 
Performance of Compton Alignment in OPERA CS, 2008 run Seigo Miyamoto Jan., 2009, MIZUNAMI.
1 BMS activities and brick maniupulation Short summary of 2008 activities and results Extraction and filling activities foreseen in 2009 Black CS extraction.
A short “physical” self introduction I’m Naotaka Naganawa from Nagoya University. I’d been working for emulsion development and compatibility between it.
Jo Beth Folger MMF Site and October 14, Conventional Facilities – MMF Presentation Outline Facility Design.
OPERA brick (16215) scanning results Luisa Arrabito on behalf of Lyon Scanning Group Emulsion Workshop Nagoya 22th-23th January 2008.
CS Distortion Kazuyama Yoshioka. Scanning Samples Realistic CS film x 10  2 nd refresh from ’06 July (include Aug. run TTCS)  Some are installed to.
Status Report on OPERA Emulsion Nakamura M. Nagoya 2006,Dec.7.
Location in CSD of electronic detector reconstructed events Scanning results from LNGS scanning lab N. D’Ambrosio, N. Di Marco, L.S. Esposito, P. Monacelli.
Film Storage and book-keeping Scanning Quality Control Cosmic Ray Density Vertex Confirmation Vertex Location WG4 summary.
Wed 17 Jun 2009ATF2 weekly meeting Oxford MONALISA 1 MONALISA at ATF2 Plans for first installation 30 June to 19 July 2009.
EMCal Meeting CERN – July 2 nd 2007 LPSC Status 1 J-F Muraz LPSC Status LPSC Status.  Assembly Hall. - Removal starts and is in progress. - Main infrastructure.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
Neutrino Event location Connection from Electric Detector to Emulsion Detector Tsutomu FUKUDA Fundamental Particle Physics Lab, Nagoya-univ 9th March,
CS Edge part Distortion analysis T.Yoshioka M.Kazuyama.
CS to brick and track follow-up ● Cosmic ray test ● CS scanning ● CS to brick connection ● Track following Napoli Scanning Lab.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
Research History of Tsutomu FUKUDA Tono-Refresh facility Facility construction Mass production shift leader Refreshing control Sensitivity.
CSd scanning report from LNGS Nagoya OPERA workshop January 22 nd, 2008.
1 BAM Activity at CERN New welding tools Alternative folding brick: dimension measurements Leakage test measurements in destructive mode Pressure test.
Emulsion quality WG2 report Thanks to all the OPERA colleagues who are engaged on handling and developing emulsion.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
Thomas Jefferson National Accelerator Facility Page 1 IPR October Independent Project Review of 12 GeV Upgrade Jefferson Lab October 18-20,
LNGS Scanning Station Nicola D’Ambrosio (LNGS group) Maiori, 4-6 June 2007.
OPERA bricks LNGS G.Rosa, C.Sirignano Emulsion Workshop, 7-9 December 2006.
Emulsion Gluing Bologna Group Outline: - Adhesive tape - PVC frames - Vacuum supports for emulsion - 2 nd gluing machine.
LNGS Scientific Committee Status of OPERA/CNGS1 April 8 th, 2005 Yves Déclais on behalf of the OPERA Collaboration.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
Production of Forward RPC Gaps CMS Forward RPC EDR (10/10/2002 – 11/10/2002) Seong Jong Hong KODEL, Korea University.
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
OPERA Emulsion Workshop – Nagoya, 7-9 Dec From CS to Brick: first results from low density cosmic ray exposure at LNGS M. De Serio from Bari emulsion.
SLHC Introduction to the “Workshop on Cryogenics and Vacuum Sectorization of the SPL” R. Garoby – 9/11/2009.
RPC Upscope : An overview with Indian perspective L. M. Pant Nuclear Physics Division Bhabha Atomic Research Centre L. M. Pant India-CMS Meeting, BARC.
RP detectors CTS Sensors now in production, full delivery between February and June 07 Production GUI and DB being finalised Test Procedure being defined.
Compressor status AWAKE Technical Board meeting 19 August 2015.
Emulsion Development Activity C.Sirignano Opera CM - Mizunami - 20/01/2009.
Brick gas tightness & emulsion-lead compatibility Opera Collaboration Meeting Hamburg, June 2004 F.Laudisio, G.Romano, C.Sirignano Salerno Emulsion.
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
1 DT critical items status: HVBoards Control and Trigger Boards Assembly in Torino fgasparini june 2004.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
ATLAS Endcap Signal Feedthrough Project Status Report Pin carrier Procurement Summary Feedthrough Production QA/QC Shipment to CERN Reception Tests at.
14-Dec-15S.Movchan Straw manufacturing and QC1 Straw manufacturing procedure and QC tape and straw parameters specification conditions of straw production:
Page 1 Sapphire Training Report in Mineral from Anice Lee and Sky Huang ~
Update on Micro Channel Cooling Collaboration Meeting , G. Nüßle.
Summary of RIKEN visit. Chamber Top plate Bottom plate Middle cylinder.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
KEK-STF Vertical Test and Diagnostics Brief History & Future Plan Vertical Test Facility Cavity Diagnostic System Example of MHI#7 Cavity Summary of T-mapping.
Event Location Rehearsal in PEANUT Bricks OPERA collaboration meeting Gran Sasso, May 2006 Kodama, Sato, Fukuda, Komatsu, Narita, Nonoyama NAGOYA.
Dec
Emulsion processing at Gran Sasso a brief update The new building Meetings between Company’s management and GS staff to fully define the project ‘Work.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
Emulsion Test Beam first results Annarita Buonaura, Valeri Tioukov On behalf of Napoli emulsion group This activity was supported by AIDA2020.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
News from PNPI Presented by N. Bondar for B. Bochin Cagliari 8/10/2015.
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Institut für Experimentelle Kernphysik
AIR COOLING & PROFILOMETRY OXFORD SYSTEM IMPLEMENTATION P.A. COE – OXFORD THURS 08 SEPT 2016 AIR COOLING & PROFILOMETRY.
Teleconf ACS – FREIA 28th March 2017
Teleconference ACS – FREIA 18th April 2017
Teleconference ACS – FREIA 10th May 2017
Vacuum System Failures at HERA
IBBelle: Status Commissioning at MPP Transport to KEK
Mission Hall Updates Ask & Learn Christine Shaff UCSF Real Estate
Teleconference ACS – FREIA 19th June 2017
General Overview of WP 12 ESS Vacuum System
Presentation transcript:

November 24th, 2005OPERA General meeting1 CS facility A. Ariga, M. Kazuyama, S. Hiramatsu Nagoya University Overview Introduction of components

November 24th, 2005OPERA General meeting2 CS barrack in Hall B

November 24th, 2005OPERA General meeting3 CS facility Refresh Packing Clinching top floor : CS production facility bottom floor : CS development facility Loading to CS box

November 24th, 2005OPERA General meeting4 CS Facility status Refresh Chamber  HIRAMATSU –COMPLETED in underground in July Packing machine  KAZUYAMA –3/3 system COMPLETED in lab –Demonstrated in Nagoya emulsion workshop Clinching equipment  HIRAMATSU –2/2 COMPLETED in lab –Demonstrated in Nagoya emulsion workshop… Emulsion film (conventional gels) –first batch film was shipped from Tono on Sep 22nd.

November 24th, 2005OPERA General meeting5 CS Facility Schedule Nov 18th 28th ~ all equipment shipping to LNGS Start to construction Dec construction & test emulsion shipment 25% Jantest operation & feedback Feboperation start emulsion shipment 25% Mar Production capacity 2800 CS / day (1 CS refresh) 1400 CS / day (2 CS refresh) today

November 24th, 2005OPERA General meeting6 Refresh & chamber construction S. Hiramatsu, A. Ariga

November 24th, 2005OPERA General meeting7 Barrack drawings Refresh Room Completed Packing room Clinching room top floor : CS production facility bottom floor : CS development facility Packing system construction will start from next week.

November 24th, 2005OPERA General meeting8 Chamber construction 22/07/05

November 24th, 2005OPERA General meeting9 Chamber construction 22/07/05

November 24th, 2005OPERA General meeting10 Refresh Chamber in CS Barrack Heater humidifier Chamber1Chamber2 Electric fan Sensor (temperature,humidity) outlet

November 24th, 2005OPERA General meeting11 Good collaboration in 1 st construction,July Japan – NagoyaAriga, Hiramatsu Italy – SalernoChiara,Fulvio – RomeG.Rosa(Barrack) Romolo, Paola – BariVito – BolognaEmilia, Claudia, Luigi Turkey – AnkaraMurat Many country collaborators contributed!! Thanks a lot !

November 24th, 2005OPERA General meeting12 Test Running 30 films inside chamber. Temperature : 27 ℃ Humidity : more than 98% Sensitivity GD (8/16 Okazaki UVSOR electron beam ~100MeV) –Ch grains / 100 micron –Ch –reference Fog Density –Ch grains / 1000μm 3 –Ch –reference No damage from GS environment.

November 24th, 2005OPERA General meeting13 Packing system M.Kazuyama

November 24th, 2005OPERA General meeting14 Packing system Air Bag (press sealer) Sealer 1.Insert CS doublet to support 2. Close Vacuum Seal 3. FINISH! Seal here Support (Hold CS doublet)

November 24th, 2005OPERA General meeting15 Into CS doublet Laminated pack sealed 150mm 140mm 110mm …Production by company

November 24th, 2005OPERA General meeting16 CS doublet in laminated pack And set into Packing system Close Vacuum Seal Leak Open Next step to clinching Auto sequence ~15 sec Manual sequence Sequence of Packing system

November 24th, 2005OPERA General meeting17 Clinching system S. Hiramatsu

November 24th, 2005OPERA General meeting18 Longitudinal-clinchingLateral side-clinching Clinching system

November 24th, 2005OPERA General meeting19 Clinching equipment set CS heater clinching and heat

November 24th, 2005OPERA General meeting20 Clinching system Last page photo is prototype. I can success to put into CS box with prototype. Real machines are more durable system. 3 lateral, 3 longitudinal machines were made. Last Friday, sent from Nagoya to here.

November 24th, 2005OPERA General meeting21 Emulsion shipment

November 24th, 2005OPERA General meeting22 CS Film Shipping 25 non refreshed film Boxes were Shipped, Sep 22 nd = 25 box × 2000 films = film = 25 % In the future, we will send films for CS at the same timing of refreshed films shipment from Tono mine.

November 24th, 2005OPERA General meeting23 Summary 1 st construction (July) finished successfully. Start to 2 nd construction from next week. We can provide refreshed film from the middle of December. Mass production can start from February.

November 24th, 2005OPERA General meeting24

November 24th, 2005OPERA General meeting25

November 24th, 2005OPERA General meeting26 Fog up check by heating x : 12V 35A ~ 1sec y: 8.4V 44A ~ 0.5sec 2.1±0.3 (reference) 1.9± ± ± ±0.3 Non effect by heating!

November 24th, 2005OPERA General meeting27 CS doublet connection shift value CS(U) to CS(D) CS Cosmic ray Exposed Time Shift in X Shift in Y Method by CS1 1min-4064Drill CS2 5min Drill CS3 20min tracks CS4 1min Drill CS5 5min-40-80tracks CS6 8h35min227-92tracks Mechanical Shift Between doublet was Around mm By realistic packing machine Feeling is well less than 0.5mm Unit in micron