Update of Water Station Changgen Yang. Main water purification station is 100m south of the intersection point of the construction tunnel with main tunnel.

Slides:



Advertisements
Similar presentations
Site selection and setting out Biogas ToT Course May 10 – 15, Kampala, Uganda.
Advertisements

LS1 & Buildings 115, 507 and 601. Building 601 Building 601 (kitchen & entrance): Power has been cut and disconnected (Patrick Gallay EL) All items removed.
Water & Wastewater Construction Back Forward Wastewater Treatment Plant and Pump Station Improvements, Haverhill, MA.
Slope intercept form of a line Y = mx+ b b is the y-intercept – point where it intersect the y – axis. m is the slope of the line. Rise over run.
An experiment.
I E Industrial Equipment Servicing the North State Environmental Cleaning Systems Site Design Comparisons Site Design Comparisons (System Pretreatment)
Onsite Wastewater Treatment Systems Module 4:1. What is a Septic System? Module 4:2 Photo credit: MOEE.
Measuring Capacity 1SMI3P2.  Can you build a set of personal references to make estimations easier and more accurate? 2SMI3P2.
January 15, 2014 Agenda 1.Roll 2.PowerPoint: Using Water Wisely 3.Possible Video.
Gathering Oil From the Fields
Simple Solutions to Green Our Homes. 60% of all Water that’s consumed in the home comes from the bathroom.
Detention Basin Saw Tooth Outlet Structure. Detention Basin Water Flow In Saw Tooth Outlet Structure On Site Water Off Site Water.
About Water Purification Station Changgen Yang. Main water purification station. It is too high in this plot, we would like to change to ~4m. It is located.
Muskegon Wastewater Treatment Facility
Water Pollution. Watershed A watershed is an area of land from which all the water drains to the same location, such as a stream, pond, lake, river, wetland.
Nunavut Water Board Public Meeting Water Licence Amendment Rankin Inlet 3AM-GRA-1015 January
Society depends on clean and safe water.
How to do an estimate. Steps 1) Estimate from bottom up –How you construct the project –Lets you get an understanding of project path –Lets you find errors.
Chapter 12: Alternative Technologies To be used with the Guide to Building Energy Efficient Homes in Kentucky.
Notes Reminder: please turn in HW, pick up new one Reminder: First Exam next Friday, 1:55-3:50pm, Jordan Hall lab room – Will cover Gravity, Fluids (Ch.13,
Solar Domestic Hot Water
Solar Energy Eco Friendly Construction Energy conservation is now a way of life for many in this region. At Eco Friendly Construction, we have embraced.
Keeping them Straight October 11,  Piping components come in two categories  Building Piping Components  Underground Piping Components.
PLANOMETRIC VIEW OF A KITCHEN.
1. Kimberley Big Hole - South Africa Apparently the largest ever hand-dug excavation in the world, this 1097 meter deep mine yielded over 3 tons of diamonds.
For Cardinal Newman Hall Randall Lessard ET Fall 2013 Dr. Cris Koutsougeras Advisors: Dr. Rana Mitra Mr. Byron Patterson.
What is EcoMachine?  It is a machine that reduces water consumption in the Aiken Center by treating sewage exiting the building and then returning it.
Pumps applications water Water intake Water treatment Water distribution Wastewater operations In irrigation concrete pumping discharging oil pumpingdischarging.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 4, 2012.
MarilynWebster Water Lesson 1 Learning outcomes To raise awareness that water is not always accessible to people To understand how we use water. To know.
Dam Placed across a river to block or control the flow of water.
Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.
By Karl Schmidt. Introduction Hello everyone, I suppose you are wondering what is an aquaponics system. Don’t worry about that now I'll tell you later.
Earth Science Daily Challenge, 11/30 There will be a TEST on Minerals and Mining this WEDNESDAY. What QUESTIONS do you have about minerals and mining or.
Each of you has a diagram of the water cycle. Write the correct name for the part of the water cycle within your diagram. Fill in the definitions on your.
Questions Before the Civil Conceptional Design Changgen Yang Daya Bay Collaboration Meeting 2006/06/09.
Gabčíkovo is the waterworks on the Danube river. it was common project of Hungary and Czechoslovakia. Later Hungary abandoned this project and Czechoslovakia.
Mission 5 By Poseidon's Goldfish (Ellie, Shin Be, Mike and Dyson)
Mike Huffington Dan Montonye North Dakota State University.
Satoshi Mihara ICEPP, Univ. of Tokyo Feb MEG Review Meeting 1 Liquid Phase Purification Satoshi Mihara.
Lunar Research Station Mrs. Gragert’s Class Holman Middle School.
Where is fresh water found? Chapter 7 Lesson 2. Learning Target/Vocabulary  Students will be able to describe the various forms of fresh water.  Vocabulary:
Event jointly staged by Steve Colella South Staffs Water.
POOL CONSTRUCTION THE 5 MAJOR STEPS 1. Plan2. Dig3. Build4. Finish 5. Swim!
 There are records of solar collectors in the united states dating back to Around the 1900’s people started to use the suns energy to heat water.
The Global Hydrological Cycle Draw and describe the Global Hydrological Cycle. Explain how a balance is maintained within the Global Hydrological Cycle.
By Molly. Things that you will need  Fish tank  Grow bed tub  Water  Clay balls  Pipes  Oxygen pump  Water pump  Garden hose  Plants  Bucket.
Strange Containers An Investigation Strange Containers The diagram shows an open cylindrical tube which sits on top of a cuboid. A liquid is poured into.
Disasters change things. Things that we take for granted every day may be hard to find.
Neelabh Pareek Charles Sie Leif Richmond Mike Rihl 2.
Key Questions What is the most cost efficient way to heat and insulate a house? Seal gaps in the walls will help with drafts and use insulation to seal.
Substructure Groundworks - Hazards
The Water.
Pumped Discharge. Brian Makin 14/
Photo Album by V. Venkatesan.
1. Check reaction 2. Check water 3. Check heater 4. Check gas
FRESNO COUNTY WEST ANNEX JAIL
Principles of a Grid Reference
Maintenance of the On-Lot Sewage System
LLANTARNAM Tree Protection
HWAT Revival Special focus on hospitals Hygiene Flexibility Economy.
8.5: Angles of Elevation and Depression
Question Explanation Latitude = 45o N Longitude = 75o W
“GO GREEN” Save Our Planet One Bottle At A Time!
On-Site Wastewater Treatment Systems
البزل Drainage ا.م.د. حياوي ويوه الجوذري.
Possible observations:
Quality Standards Fresh water can contain a variety of harmful substances and organisms. Concentration refers to the amount of substance that is in another.
WATER IS LIFE By Victoria Chinova.
A Deeper Look at the Athabasca Tar Sands
Presentation transcript:

Update of Water Station Changgen Yang

Main water purification station is 100m south of the intersection point of the construction tunnel with main tunnel. It is ~990 m to far site, ~710 m to DYB near site. ~570 m to LA near site. Main water station

Main water system 15 m x 8 m 1 m + 9 m

Water circulation room 4 m x 10 m Gas room 3.5 m x 10 m Gas bottle cabinet Pump cabinet ~5 m below ground level Pump pit 1.5 x 1.5 x 0.6 m3 at the bottom of the pool Pipes from pump cabinet to the pool, include: circu. pipe, water transfer pipe from/to main water station The pump cabinet may be not exactly as it was drawn in the plot because Yellow River realized the pumps have to be put several meters down the ground later.

Water are first purified from the main water system, then they are transferred to the water pool via pipe. When the pool is full, the circulation system start work because the water outlet is on one of the top corner of the pool ( other choice need work ) Essentially the pool in hall 4 is empty all the time. When we want to drain the experiment pool, we pump the water from hall 1/2/3 to hall 4. The water there do not need to be circulated, we just keep it off dust and bacteria. When we need water back from hall 4 to hall 1/2/3, the water are first purified in hall 4, then transferred to hall 1/2/3 via pipe. The consumption of water of water circulation is not much every day, so it is possible to use the seepage water. For ~1000 days of experiment running, this may save the same amount of money of the pre-treatment system.