BUILDING STRONG ® US Army Corps of Engineers BUILDING STRONG ® For Planning Associates Jim Walker Navigation Branch Chief HQ USACE 16 May 2011 Navigation.

Slides:



Advertisements
Similar presentations
US Army Corps of Engineers Budgeting Process
Advertisements

Slide1 Managing Flood Risk U.S. Army Corps of Engineers Steven L. Stockton, P.E. Director of Civil Works U.S. Army Corps of Engineers 14 July 2009 Presentation.
Bill Dawson Chief, Policy and Policy Compliance U.S. Army Corps of Engineers Bill Dawson Chief, Policy and Policy Compliance U.S. Army Corps of Engineers.
US Army Corps of Engineers BUILDING STRONG ® Transforming Civil Works for the 21 st Century Major General Michael J. Walsh Deputy Commanding General, Civil.
US Army Corps of Engineers BUILDING STRONG ® COL Richard P. Pannell District Commander, Galveston District U.S. Army Corps of Engineers United States Army.
1 Presentation for the 11th Annual Atlantic Intracoastal Waterway Conference By David B. Sanford Director, Navigation Policy & Legislation American Association.
Returning to Our National Waterways Dabney Hegg U.S. Senate Committee on Commerce, Science and Transportation.
1 Ports and Harbors – Transitions and Challenges Ms. Doris J. Bautch Commissioner, U.S. Section of PIANC U.S. Maritime Administration Presented at the.
US Army Corps of Engineers BUILDING STRONG ® JACKSONVILLE DISTRICT COASTAL DAMAGE REDUCTION FLOOD DAMAGE REDUCTION NAVIGATION ECOSYSTEM RESTORATIONREGULATORYINTERAGENCY.
Department of Industrial Engineering1 Economic Evaluation of the Impact of Waterways on the Port of Cincinnati-Tristate Heather Nachtmann, Ph.D. River.
A Report to Congress Addressing “the Critical Need for Additional Port and Inland Waterway Modernization to Accommodate Post- Panamax Vessels”
US Army Corps of Engineers BUILDING STRONG ® Eastern Shore Community College Workforce Development Center Melfa, Virginia August 16, 2013 “ A Unified Voice.
Washington Port Issues Washington State Freight Advisory Committee Seattle, WA December 9, 2013.
US Army Corps of Engineers BUILDING STRONG ® Vertical Team Roles & Responsibilities Planning Principles & Procedures – FY11.
Channel Portfolio Tool (CPT)
Developing Navigation Performance Measures Barry Holliday Navigation Program Manager US Army Corps of Engineers Headquarters Washington, DC 14 December.
Winter Leader Conference February 4, 2009 “ Building Strong “1 The FY 2011 CW Program Mr. Pete Luisa 1 March 2010 PNWA.
Ports and Waterways: A State DOT Perspective Secretary Sherri H. LeBas, P.E. April 29, 2015.
1 Great Lakes Maritime Task Force 14th Annual Informational Briefing for the Great Lakes Delegation Tom Buck, C.E.O. Carmeuse Lime and Stone April 2, 2009.
US Army Corps of Engineers BUILDING STRONG ® Eastern Shore Navigation Partnership Meeting “ A Unified Voice for Navigation, Project Prioritization, and.
Dredging, Disposal Management and Impacts on Lake Sediments US Army Corps of Engineers.
NASA Real Property Program August 20, 2014 Scott Robinson Director, Facilities Engineering Division Acting Director, Integrated Asset Management Division.
PORT EVERGLADES. 3.7 MILLION CRUISE GUESTS 6 MILLION TONS OF CARGO AND 924,000 CONTAINERS The total value of economic activity at Port Everglades in FY.
CHARLESTONMOBILE WILMINGTON SAVANNAH JACKSONVILLE US Army Corps of Engineers BUILDING STRONG ® NC Water Resources Congress Christine Brayman Deputy For.
1 Water Resources Development Act (WRDA) Overview Why the Federal Government Must Invest in Seaport Related Infrastructure for AASHTO/ITTS Webinar Jim.
Study conducted for the Coalition of Alabama Waterway Associations by Troy University Center for International Business and Economic Development.
The Importance of Our Nation’s Waterways Presented to Congressional Waterways Caucus Jim Walker HQUSACE 22 July 2009.
Governor’s Advisory Commission on Coastal Protection, Restoration and Conservation August 20, 2009.
Winter Leader Conference February 4, 2009 “ Building Strong “1 Creating the CW Budget Mr. Pete Luisa 2 March 2009 PNWA.
Program Development & Management: U.S. Army Civil Works Program Gary Loew, Chief, Programs Integration Division Directorate of Civil Works U.S. Army Corps.
Coastal Texas Protection and Restoration Project
US Army Corps of Engineers BUILDING STRONG ® Charleston District Charleston Harbor Post 45 Deepening Feasibility Study Barbara Melvin Senior Vice President.
MnDOT-ACEC Annual Conference March 5,  Capital planning and programming at MnDOT  Major considerations  A more transparent and collaborative.
L&D Inspection and Emergency Repairs Workshop Mike Kidby Navigation and Operations CoP 18 April 2006.
Theodore A. Brown, P.E., SES Chief Planning and Policy Division
Module 11 STEPS 4 & 5 Conduct Reconnaissance Study & Report Certification Civil Works Orientation Course - FY 11.
WRRDA and WRDA: How are they different, and does it make any difference? Inland Rivers, Ports and Terminals, Inc. Tuesday, April 29, 2014 James A. Kearns.
Corps of Engineers Funding for Navigation Infrastructure David V. Grier Institute for Water Resources Presented at Financing Freight Transportation Improvements.
US Army Corps of Engineers BUILDING STRONG ® NC WATER RESOURCE CONGRESS ANNUAL RALEIGH MEETING Jim Medlock Chief, Programs Management Branch Wilmington.
Inland Waterways: The National Perspective Amy Larson Executive Director National Waterways Conference, Inc PNWA Annual Meeting.
1 Transportation Infrastructure Programs Past, Present & Future Transportation Association of Canada Fall Conference September 2011 Edmonton, Alberta.
World Association for Waterborne Transport Infrastructure (PIANC) and the International Environmental Commission Technical Seminar October 28, 2009 Westin.
U.S. Army Corps of Engineers USACE Navigation Data/Information Workshop July 7, 2005 Arlene L Dietz, Director, Navigation Data Center.
NOAA Restoration Center Implementing the Gulf Regional Sediment Management Master Plan …responding to an ongoing emergency, improving responses to new.
Harbors Module NH1: Authorities and Policies. NH1 - 2 BU ILDING STRONG SM Student Learning Objectives Student will be able to:  Describe the Federal.
Paul Rohde Water Resources (& Reform) Development Act 113 th Congress.
US Army Corps of Engineers BUILDING STRONG ® Planning Principles & Procedures – FY11 AUTHORIZATION AND APPROPRIATION OR “It Takes Two to Tango"
Building Strong! May Deep Draft Navigation Module 2011 Planning Associates Class Jeremy LaDart Office of Water Project Review HQUSACE Mission Overview.
US Army Corps of Engineers Chicago District FY04tpr\skbcongressional Civil Works Program Missions Missions Process Process Select Authorities Select Authorities.
Alabama Water Resources Assoc. * September 5-7, 2007 * CAWA Emerging Opportunities for Our Inland Waterways Alabama Water Resources Association September.
US Army Corps of Engineers Great Lakes & Ohio River Division US Army Corps of Engineers Great Lakes & Ohio River Division Achieving Navigation Systems.
US Army Corps of Engineers BUILDING STRONG ® USACE-IOOS Missions, Priorities, Recommendations Linda Lillycrop IOOC Member USACE Liaison, U.S. IOOS US Army.
Harbor Maintenance and Dredging: A Legislative Update CAPT Bill Diehl, USCG (Ret.), P.E. President Greater Houston Port Bureau.
Winter Leader Conference February 4, 2009 “ Building Strong “1 Budgets and Appropriations: Restoring our Infrastructure Budgets and Appropriations: Restoring.
1 Coal Handling & Storage Conference 2015 Paul Rohde, Vice President Waterways Council, Inc.
1 Louisiana: Our Energy Future 2009 American Recovery & Reinvestment Act.
Implementing the Master Plan Kyle Graham Deputy Executive Director CPRA June 20, 2012 committed to our coast.
Mark R. Pointon Operations/Navigation COP U.S. Army Corps of Engineers Mark R. Pointon Operations/Navigation COP U.S. Army Corps of Engineers Presentation.
1 Smart Rivers Conference September 15, 2011 New Orleans, Louisiana “Status of Inland Waterways Infrastructure Funding”
Inland Navigation - A National Perspective Jim Walker USACE, Headquarters November 8, 2007.
US Army Corps of Engineers BUILDING STRONG ® US Army Corps of Engineers BUILDING STRONG ® Building Strong Collaborative Relationships for a Sustainable.
US Army Corps of Engineers BUILDING STRONG ® OVERVIEW OF THE CIVIL WORKS PROCESS Planning Principles & Procedures – FY 11.
“If you think we’ve got problems now... and …what can we do about it” Transportation Day-Pittsburgh May 17, 2007 James R. McCarville Port of Pittsburgh.
House Transportation Policy and Finance April 13, 2016 Tracy Hatch Deputy Commissioner Chief Financial Officer / Chief Operating Officer.
Beneficial Use of Dredge Materials: Introduction to Dredging and Policy J. Bailey Smith US Army Corps of Engineers April 4, 2011.
US Army Corps of Engineers BUILDING STRONG ® 1 Inland Marine Transportation System Capital Investment Strategy Jeanine Hoey, PE, PMP Program Manager 15.
BUILDING STRONG SM Revitalizing and Expanding Partnerships Charles E. Shadie, P.E. Senior Hydraulic Engineer Mississippi Valley Division U.S. Army Corps.
THE ARMY CIVIL WORKS PROGRAM
AASHTO Freight Update WRDA, PRIIA and MAP-21
Navigation Funding for CMANC
Presentation transcript:

BUILDING STRONG ® US Army Corps of Engineers BUILDING STRONG ® For Planning Associates Jim Walker Navigation Branch Chief HQ USACE 16 May 2011 Navigation Program Overview

BUILDING STRONG ® Topics Navigation Overview Capital Investment Plans – a new model? Remaining Relevant WRDA – Nav Studies Contributed Funds 2

BUILDING STRONG ® Corps Navigation Mission Provide safe, reliable, efficient, effective and environmentally sustainable waterborne transportation systems for movement of commerce, national security needs, and recreation.

BUILDING STRONG ® USACE Navigation Assets INLAND NAVIGATION 27 Inland River Systems 207 lock 171 lock sites 12,000 miles of inland river channels COASTAL NAVIGATION 1067 Navigation Projects 19 lock chambers 13,000 miles of channels 929 navigation structures 844 bridges

BUILDING STRONG ® Administration Objectives Double exports in 5 years Improve the environment Reduce Green House Gas (GHG) emissions Reduce fossil fuel consumption Navigation has a key role in all of these! 5

BUILDING STRONG ® Navigation Funding – Pres Budget ($million) Pres Bud CoastalInlandNavCW total Nav Percent FY12$832$744$1576$ FY11$873$779$1652$ FY10$971$796$1767$ FY09$969$931$1900$ FY08$957$1057$2014$ Trend is declining funds Navigation down 22% in the last 5 years. Reductions masked by ARRA funding in FY09 and FY10 Flood Damage Reduction increased due to DSAC results; Environment also increased.

BUILDING STRONG ® FY12 O&M Budget Coastal Navigation CategoryInventoryCommerceFY12 O&M Projects FY12 O&M Funds FY11 O&M Proj. FY11 O&M Funds High Use5990%5462% Moderate Use1009%6125%120*21% Low Use9081%416%12410% Other7% Total %156100%244100% 7 Prior to FY12 we adjusted to budget decreases by minor reductions at almost all nav projects. The low use category was proposed as a program for 50% reduction in the FY12 budget development; This was a 50% dollar reduction, not a 50% projects reduction ‘Other’ includes Nav R&D, Project Condition Surveys, Remaining Items, etc. IMPACT: Risk of navigation related incidents and fatalities increase at non-dredged projects. *High and moderate use were not separately identified in FY11

BUILDING STRONG ® Coastal Navigation Capital Investment Program Replace, Recapitalize, Retire Plan Operate & Maintain DesignConstruct 3 Projects NY/NJ Delaware Rvr (Cong Add) Sacramento/Stockton 1 Project In PED: Savannah 7 Projects: Jax, SNWW, Boston, Freeport, Brazos Island, Great Lakes, Palm Beach Annual O&M Budget Divest

BUILDING STRONG ® Ready for the Panama Canal: US Harbors 45’ or Greater WEST COAST Seattle/Tacoma (>50’) Oakland (50’) LA/LB (>50’) San Diego (47’) GULF COAST Mobile New Orleans Houston/Galveston/Texas City Corpus Christi Freeport EAST COAST NY/NJ (50’ underway) Baltimore (50’) Hampton Roads (50’) Charleston Morehead City

BUILDING STRONG ® Coastal Navigation Channel Performance High Use Projects, >10M tons/year Goal: Half channel width, 95% of time Actual: 35% of time 10 CL Toe Qtr Pt Advanced Maintenance Allowable Overdepth Qtr Pt Toe Analogy to building a 2-lane road; Present funding allows one lane, one-third of the year

BUILDING STRONG ® Coastal Navigation Initiatives Need a capital investment strategic plan for coastal navigation –Studies: No new starts or new phases –Efficiently fund study, design and construction 11

BUILDING STRONG ® Coastal Nav Future Status Quo Continued O&M funding reductions –Reduce number of maintained projects –Scope dredging to available funding –Reduced channel availability Minimal Capital Investment work – channel deepenings Proactive Efforts HMTF revision Establish a Coastal Nav Capital Investment Program Pursue Environmental Improvements in BCR Establish Administration Projects of National Priority 12

BUILDING STRONG ® FY12 O&M Budget Inland Navigation CategoryRivers/ Waterways LocksCommerce Ton-Miles FY12 O&M FY11 O&M High Use %93%90% Moderate UseN/A Low Use11373%7%10% Total % 13 Low commercial use projects took a 50% reduction in FY12 budget. FY13 Budget guidance establishes Moderate Use for Inland as 1-3B ton-miles IMPACT: Lower transportation savings impacts global competitiveness of US exports. Risk of navigation related incidents and fatalities increase at minimally maintained projects. ACTION: Determine minimal O&M requirements for ‘Caretaker’ status

BUILDING STRONG ® Inland Navigation Capital Investment Program Replace, Recapitalize, Retire Plan Operate & Maintain DesignConstruct 4 Projects Olmsted, Emsworth, Monongahela Locks 2, 3 &4, PA MS River Lock 27 2 Projects In PED: Upper Miss, GIWW - Bayou Sorrel, LA 4 Projects: Upper Ohio, PA Missouri River GIWW – Calcasieu GIWW channel, TX Annual O&M Budget Divest Note: 2 Projects suspended in FY12 Chickamauga, TN Kentucky Lock, KY

BUILDING STRONG ® Navigation Performance USACE Campaign Goal Objective 3c: Deliver reliable infrastructure using a risk-informed asset management strategy High Performing Goal: INLAND NAVIGATION: Scheduled & Unscheduled lock closures due to mechanical breakdowns -Less than 5-yr average -Not achieving

BUILDING STRONG ® Inland Navigation Initiatives IMTS Board of Directors –Navigation Lock Staffing –Navigation Lock Levels of Service IMTS Working Group –Lock Operator Training and Certification –Lock Operator Position Descriptions –IMTS Maintenance Standard Inland Waterways Users Board –Implementing CPBM Recommendations –IWTF: Status Quo - 3 projects Maintenance Engineers 16

BUILDING STRONG ® Which Way for IMTS? Proactive Efforts IWTF revision implemented IMTS Capital investment program implemented – thousands of US crafts jobs Reliability and Resiliency increases Presidential objectives accomplished Status Quo Continued O&M funding reductions –Increased risk of major mechanical breakdown and extended IMTS closure –Reduced IMTS availability –Reduced reliability Minimal Capital Investment work

BUILDING STRONG ® Navigation Topics Capital Investment Plans – a new model? Planning Program – Nav Studies Remaining Relevant WRDA Contributed Funds 18

BUILDING STRONG ® Coastal Nav Investment Plan Build on success of IMTS CPBM and Hydropower Modernization Initiative Determine key projects Team of Corps, Ports and Shippers Post Panama Canal and beyond Others studies continue but selected projects funded at capability 19

BUILDING STRONG ® Planning Program Trends InlandCoastal NavigationEnviron. Restor. MixedTotal Chiefs RptsReports SinceProjects WRDA ‘07$B Add’l Chief’sReports Rpts by Dec 11Projects TotalsReports TotalsProjects Flood Risk Mgmt Notes: 1.The MsCIP Chief’s Report accounts for two Coastal Flood Risk Mgmt projects and 10 ecosystem restoration projects. The LCA 6 Chief’s Report accounts for 6 ecosystem restoration projects. The impetus for the MsCIP and LCA projects was post-Katrina authorizations by Congress. The only other ENV project is Mid-Bay, which supports a navigation project by containing 95 mcyds of dredged material. 2.The 7 additional ecosystem reports included 3 from Coastal Louisiana (LCA 4, LCA Barataria, and MRGO) and 2 from the Everglades (Broward County and Biscayne).

BUILDING STRONG ® Navigation Studies - Strategic Failure?? FY12 Budget, Navigation Studies, Investigations Account –$18M Total; $7M for Studies, $11M for Remaining Items –$18M of $104M total GI (Nav: 17% of GI vs 32% of total program) –Recons: Funded: 0; Unfunded: 30 projects for $3.9 million of which 28 were new starts –Feasibilities: Funded: 9 (3 completions; 6 continue) $4.5M Unfunded: 34 projects for $21.4 mil (12 new starts) –PEDs Funded: 2 projects for $2.6 million Unfunded: 26 projects for $37.4 million (14 new starts) –Are we preparing the Nation for post-Panamax Vessels? –If we did fund more Nav studies….which ones?

BUILDING STRONG ® Remaining Relevant Trend of ports/sponsors choosing to abandon the Federal planning process Port of Miami Freeport channel widening Port of Corpus Christi – LaQuinta Channel Takes too long, costs too much 22

BUILDING STRONG ® WRDA Key to Navigation program’s future - Most significant legislation since WRDA ’86 WRDA viewed as a spending bill –Possible ‘CW BRAC’ of inactive navigation projects –Estimate dredging cost for these projects and show CW BRAC as a cost avoidance to offset perception of a WRDA ‘spending bill’ April letter to Budget Comm from 34 House Reps Be optimistic! 23

BUILDING STRONG ® Contributed Funds Increased consideration by sponsors and non-sponsors in contributing funds –New Work and O&M –Beneficial Use of Dredged Material Existing process very time consuming Need to review process and streamline process 24

BUILDING STRONG ® Channel Portfolio Tool (CPT) Portfolio management for USACE navigation channels should account for both physical condition and depth utilization in prioritizing projects for O&M funding. By focusing on the cargo at the marginal, shoal-vulnerable depths, CPT provides a more complete indication of the significance of maintenance dredging.

BUILDING STRONG ® Mission and Safety Importance Factors (MIF and SIF) from MSC Teams Economic Consequences from Nav PCX Probability of Failure from MSC SME’s led by Risk Management Center Condition Assessments developed by IMTS BPR group implemented by MSC Teams OCAP(f) MIF SIF $ Pieces of the Navigation Budget Process

BUILDING STRONG ® Key Points Navigation funding is an essential component for the Nation’s Global trade – Economy, Jobs and Exports WRDA is key to the Nation’s economic future Need senior Administration discussion on national commitment to shipping, global trade and navigation infrastructure –What does this Administration seek as its legacy for navigation?

BUILDING STRONG ® Summary What do we do? Provide Navigation infrastructure that is Reliable, Efficient, Resilient and Environmentally Sustainable. Why is it important? This infrastructure enables American goods to compete in the Global marketplace Economy, Jobs and Exports!