Dean R Walters Undulator Vacuum October 12-13, 2004 Facility Advisory Committee Undulator Vacuum System/Mechanical By Dean R Walters.

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

Rodd Pope, SLAC Undulator System October 12-13, 2006 FAC Meeting 1 Undulator System Assembly Plans Rodd Pope, SLAC.
Rodd Pope, SLAC Undulator System April 16-17, 2007 FAC Meeting 1 Undulator System Assembly, Installation, and Integration.
Stephen Milton Undulator System 12 October 2004 Undulator System Update Stephen Milton, ANL.
XFD – XF Engineering Group November 15-th, 2004LCLS Undulator Final Design Review1 Undulator for the LCLS project - design of the support and mover system.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
Geoff Pile FAC Review - Undulator 12 November 2008 LCLS Undulator System Overview and Fabrication Geoff Pile.
S. Smith LCLS Facility Advisory April 16, BPMs and Toroids Facility Advisory Committee April 16, 2007 System overview.
MICE Collaboration meeting at CERN March 28 – April 1, 2004 MICE Cooling Channel --- AFC Module work group report Wing Lau – Oxford.
Marion M. White Undulator System 07 April 2005 LCLSLCLSLCLSLCLS Undulator System Tests Marion M. White ANL-ASD-LCLS.
Apr. 16, 2007 Undulator Breakout Dean R. Walters 1 Vacuum System Undulator Vacuum System Dean R. Walters Soon-Hong Lee, James Bailey, James.
1 MOSFIRE is a Multi-Object Spectrometer for the Near Infra-Red (wavelengths ~ μm) We are deep in the component fabrication and procurement phase.
Geoff Pile LCLS Fixed support IDR 12 th January 2006 LCLS Fixed Support IDR Introduction and History Are special fixed supports needed?
Richard M. Bionta XTOD October 12, 2004 UCRL-PRES-XXXXX X Ray Transport, Optics, and Diagnostics, Overview Facility Advisory Committee.
John N. Galayda LCLS FAC 20 April Linac Coherent Light Source Overview and Charge Facility Advisory Committee John.
LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review Introduction to the LCLS Undulators Heinz-Dieter Nuhn,
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Dean R Walters Chamber and Bellows Jan. 5, Summary Chamber The plan is to construct a chamber made of 316LN stainless steel with.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Dean R Walters November 15, 2004 Integration of the Vacuum and Diagnostics with the Undulator By Dean R Walters APS.
Bob Lill LCLS FAC June 16-18, 2008 RF BPM Status and Production Test Results.
Richard M. Bionta XTOD Layout and Diagnostic October 12-13, 2004 UCRL-PRES-XXXXX XTOD Layout and Diagnostic Systems Facility Advisory.
ANL HWR Cryomodule Status Update 27 January 2015 Zachary Conway On behalf of the ANL Linac Development Group Argonne National Laboratory Physics Division.
D Walters Undulator System June 17, Undulator System Components Status Dean Walters.
Undulator System Review Closeout Erik Johnson, Kem Robinson, Dieter Walz 4 March 2004.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
XFD – XF Engineering Group November 15-th, 2004LCLS Undulator Final Design Review1 Undulator for the LCLS project – from the prototype to the full scale.
Richard M. Bionta XTOD Beam and Detector October 12-13, 2004 UCRL-PRES-XXXXX XTOD Beam and Detector Simulations Facility Advisory.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
LINACs Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
CHAPTER 4 Engineering Communication
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
Marion M. White Undulator System 27 October FAC LCLSLCLSLCLSLCLS Progress on the Undulator Module System Test Marion M.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
Sci-Fi Tracker: Progress Report Malcolm Ellis, MICE Video Conference Wednesday 6 th October 2004.
Photo-detector Tube Construction Laboratory Considerations Dean Walters Argonne National Laboratory.
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
G5 Beam Line Vacuum System. G5 Beamline Vacuum System Design  Bakeable and Particulate free to Class 100 Clean Room quality Require Clean room QA and.
MICE Target Mechanical Design l Status of Target ref. Schedule »Drawings –Drawing list created (see next slide) includes inventory –Drawings being released.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
Preliminary calculations for the vacuum system of ELENA R. Kersevan TE/VSC-IVM – 21/6/2012 The vacuum sectors, the position of vacuum pumps, flanges, and.
Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
Current Status of LASER FRAME for KEK-Nano BPM (Tentative results of resolution test) Second Mini-Workshop on Nano Project at ATF December 11-12, 2004.
Feb. 20, 2006 Diagnostics-Vacuum Overview Dean R. Walters 1 LCLS Undulator Diagnostics and Vacuum System Overview Dean R. Walters.
Outgassing Test and the Getter Specification
Pioneering Science and Technology Office of Science U.S. Department of Energy UNDULATOR SYSTEMS REVIEW MARCH 3-4, 2004 ARGONNE NATIONAL LAB. 1 LCLS Optical.
Gas system for NA62 Straw detector Roberto Guida On behalf of Gas Service Team NA62 Straw working meeting, March 26, 2012 Outline: P&I Drawing Schedule.
Proposed LCLS-II SCU Schedule Soren Prestemon (LBNL) SCU 3-Lab Review Meeting December 16, 2014.
Seungyu Rah (Pohang Accelerator Laboratory, POSTECH, Korea) Nov
S. Smith LCLS Facility Advisory October 12, Beam Position Monitors Facility Advisory Committee October 12, 2006.
© 2009, Prentice-Hall, Inc. Catalysts Catalysts increase the rate of a reaction by decreasing the activation energy of the reaction. Catalysts change the.
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
Summary of Presentation 1. Tolerances i. Vertical tolerances on BPMs (rf-BPM: ± 0.2μm, user BPMs: ±0.1μm, and X-BPMs: ± 0.1μm) ii. Tolerances on magnets’
Jan , 2008 LCLS Undulator Week Dean R. Walters 1 Vacuum Components Undulator System SH Lee, J Morgan, and D Walters.
Paul Scherrer Institut
Communication and Documentation Needs exemplified on WP 71
Beam Finder Wire Assembly Undulator System
Linac Coherent Light Source Procurement
Undulator System Components Status Dean Walters
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
LCLS Undulator System Production Management
LCLS Vacuum System Plans (July 07)
Injector/Linac Design Status C. E
Alignment Diagnostic System Status
Presentation transcript:

Dean R Walters Undulator Vacuum October 12-13, 2004 Facility Advisory Committee Undulator Vacuum System/Mechanical By Dean R Walters Advanced Photon Source Argonne National Laboratory

Dean R Walters Undulator Vacuum October 12-13, 2004 Facility Advisory Committee Talk Outline Undulator Chamber & Bellows Vacuum System Beamline Diagnostics Schedule Highlights Undulator Vacuum System/Mechanical

Dean R Walters Undulator Vacuum October 12-13, 2004 Facility Advisory Committee Undulator Chamber & Bellows Chamber Design Bellows Design Status of the Prototype Undulator Vacuum System

Dean R Walters Undulator Vacuum October 12-13, 2004 Facility Advisory Committee Undulator Moves In & Out Undulator Vacuum Chamber with Supports Vacuum Chamber & Bellows Design

Dean R Walters Undulator Vacuum October 12-13, 2004 Facility Advisory Committee Supports Chamber Strongback Tubular Chamber 6 mm OD X 5 mm ID Vacuum Chamber & Bellows Prototype Design

Dean R Walters Undulator Vacuum October 12-13, 2004 Facility Advisory Committee Chamber Drawings Vacuum Chamber & Bellows

Dean R Walters Undulator Vacuum October 12-13, 2004 Facility Advisory Committee Vacuum Chamber & Bellows Bellows Design Drawn by SH Lee

Dean R Walters Undulator Vacuum October 12-13, 2004 Facility Advisory Committee Vacuum Chamber & Bellows Drawn by SH Lee Bellows Design (Expanded View)

Dean R Walters Undulator Vacuum October 12-13, 2004 Facility Advisory Committee Status of Prototype Chamber Drawings Complete Outside shops have completed all quotations All orders have been issued ANL shop work orders are in place Fabrication to complete in December 2004 Bellows Assembly and parts design complete Need to draft assembly and part drawings Undulator Vacuum Chamber

Dean R Walters Undulator Vacuum October 12-13, 2004 Facility Advisory Committee Vacuum System System Layout Short Break Section Long Break Section Vacuum Pressure within the System Undulator Vacuum System

Dean R Walters Undulator Vacuum October 12-13, 2004 Facility Advisory Committee System Layout Vacuum System

Dean R Walters Undulator Vacuum October 12-13, 2004 Facility Advisory Committee Vacuum System

Dean R Walters Undulator Vacuum October 12-13, 2004 Facility Advisory Committee Short Break Section Schematic Vacuum System

Dean R Walters Undulator Vacuum October 12-13, 2004 Facility Advisory Committee Vacuum System Drawn by SH Lee

Dean R Walters Undulator Vacuum October 12-13, 2004 Facility Advisory Committee Long Break Section Schematic Vacuum System

Dean R Walters Undulator Vacuum October 12-13, 2004 Facility Advisory Committee Vacuum System Drawn by SH Lee

Dean R Walters Undulator Vacuum October 12-13, 2004 Facility Advisory Committee Vacuum Pressure within the System Red is at Tube Mid-Point Blue is Average Vacuum System hours Torr (Thermal Desorption only)

Dean R Walters Undulator Vacuum October 12-13, 2004 Facility Advisory Committee Vacuum System Vacuum Pressure within the System (includes Thermal Desorption plus Photon Stimulated Desorption) Red is at Tube Mid-Point Blue is Average Torr hours

Dean R Walters Undulator Vacuum October 12-13, 2004 Facility Advisory Committee Undulator Vacuum System/Mechanical Beamline Diagnostics RFBPM Different type under consideration Highlights of Schedule Vacuum Testing of Diagnostics Components What drives this issue Status of Testing

Dean R Walters Undulator Vacuum October 12-13, 2004 Facility Advisory Committee Beamline Diagnostics C-Band RFBPM now being considered instead of X-Band C-Band has the possibility of using industry supplied electronics According to published literature resolution ~30 nm

Dean R Walters Undulator Vacuum October 12-13, 2004 Facility Advisory Committee Highlights of the Schedule Design work to start March 2005 Timing of Design work based of funding during Continuing Resolution Use intervening time to research C-Band RFBPM (ANL) Goal is to have BPM mechanical design by June 2005 Goal is to have (3) test BPMs by September 2005 Currently this schedule is undergoing a review Beamline Diagnostics

Dean R Walters Undulator Vacuum October 12-13, 2004 Facility Advisory Committee Beamline Diagnostics Vacuum Testing of Diagnostics Components What drives this issue The Diagnostics Station is considering the use of motion components in the vacuum section where we do not have a lot of experience. Slides and Stages Motors The initial concept was to put the motion components in the vacuum for reasons of positional accuracy. The design is at a point where changes are possible to move things in and out of vacuum The intention is to subject components to residual gas analysis and outgassing measurement to qualify them for use.

Dean R Walters Undulator Vacuum October 12-13, 2004 Facility Advisory Committee Beamline Diagnostics

Dean R Walters Undulator Vacuum October 12-13, 2004 Facility Advisory Committee Beamline Diagnostics Status of Testing A draft test procedure has been written that covers both residual gas analysis and outgassing measurement. The Test Set-up is assembled The Set-up has completed a troubleshoot/ clean-up process The Set-up is in the process of establishing a base performance profile Suppliers are being contacted for test samples

Dean R Walters Undulator Vacuum October 12-13, 2004 Facility Advisory Committee Schedule Diagnostics Vacuum System

Dean R Walters Undulator Vacuum October 12-13, 2004 Facility Advisory Committee Conclusions: Prototype Chamber construction progressing The prototype Bellows has been modeled and after issuing drawings it will enter the fabrication phase. The order of the Beamline Components is still undergoing some adjustments but it is firming to allow design of the cradle assembly A new direction for the RFBPM is being considered and work on it is schedule for March 2005 Motion components vacuum testing has just entered the first stage of testing. Questions Undulator Vacuum System / Chamber Design

Dean R Walters Undulator Vacuum October 12-13, 2004 Facility Advisory Committee END

Dean R Walters Undulator Vacuum October 12-13, 2004 Facility Advisory Committee Resulting of Outgassing Calculations APPENDIX