Graphical Work Order Scheduling in SAP

Slides:



Advertisements
Similar presentations
Order Inquiry and Change Order eCommerce Enhancements An Overview to eCommerce Enhancements March 2012.
Advertisements

Quick Start Guide | Skill Assessments Using your Online Product Interfaces and Features Getting Started - My Account Creating/Logging into your Self Test.
WEB DESIGN TABLES, PAGE LAYOUT AND FORMS. Page Layout Page Layout is an important part of web design Why do you think your page layout is important?
Contents This guide is designed to help you perform key functions in CAR by providing high level descriptions of how they were done in SAM followed.
MICHAEL MARINO CSC 101 Whats New in Office Office Live Workspace 3 new things about Office Live Workspace are: Anywhere Access Store Microsoft.
Decision Analysis Tools in Excel
EXCEED® IEP Quick Start Card – Student Record/Events 1.Select the left vertical bar to close the student panel, giving more space for the student record.
Kanban Task Manager for Outlook ‒ Introduction
Wincite Introduces Knowledge Notebooks A new approach to collecting, organizing and distributing internal and external information sources and analysis.
Project Information: Customizing and Printing Lesson 7.
6 th Annual Focus Users’ Conference 6 th Annual Focus Users’ Conference CTE Attendance & Gradebook CTE Attendance & Gradebook Presented by: Natasha Leon.
Kanban Task Manager Single‒ Introduction
Copyright © 2003 Americas’ SAP Users’ Group Use of Impress SAP-P3 Interface for Projects – Session 3804 Stuart Graham, Halliburton Process Lead - Project.
Copyright © 2003 Americas’ SAP Users’ Group Simple Document Management in Project Systems Kent Bettisworth BETTISWORTH & ASSOCIATES, INC. Tuesday, May.
Guide to Oracle10G1 Introduction To Forms Builder Chapter 5.
PeopleSoft: Campus Solutions Navigation and Configuration.
1 Introduction to OBIEE: Learning to Access, Navigate, and Find Data in the SWIFT Data Warehouse Lesson 5: Navigation in OBIEE – Touring the Catalog Page.
Project Management Software Application PRM 705 Lecture 27.
1 Introduction to the Visual Studio.NET IDE Powerpoint slides modified from Deitel & Deitel.
Bar|Scan ® Asset Inventory System The leader in asset and inventory management.
Inventory Throughout this slide show there will be hyperlinks (highlighted in blue) follow the hyperlinks to navigate to the specified Topic or Figure.
Open and save files directly from Word, Excel, and PowerPoint No more flash drives or sending yourself documents via Stop manually merging versions.
Business Process Modeling in Microsoft Visio® Interfacing’s BPMN Modeler: Overview.
State of Connecticut Core-CT Project Query 4 hrs Updated 1/21/2011.
Integrate your people maximize your knowledge Tel SalesBase Customer.
2. Introduction to the Visual Studio.NET IDE 2. Introduction to the Visual Studio.NET IDE Ch2 – Deitel’s Book.
Integrating Microsoft Project with Other Programs
ARCHIBUS Log On Instructions. Log Into ARCHIBUS Web Central Log In Screen 1.Open your Internet browser. 2.Enter the URL to view the ARCHIBUS Login Page.
® IBM Software Group © 2006 IBM Corporation JSF Tree Control This Learning Module describes the use of the JSF Tree Control – for hierarchical organization.
What is Sure BDCs? BDC stands for Batch Data Communication and is also known as Batch Input. It is a technique for mass input of data into SAP by simulating.
Siemens Power Generation, Instrumentation &Controls
Ansys Workbench 1 Introduction
Lecture 1 Saima Gul. What is a Project? A Project is a job that has a beginning and an end (time), a specified outcome ( scope) at a stated level of quality.
AESuniversity User Tips & Tricks. Session Outline  Working with your Caseload Customers  Recording Services  Snapshot Tips  Searching Tips  Working.
Copyright © 2007, Oracle. All rights reserved. Managing Concurrent Requests.
Advanced Project Plan Formatting Lesson 14. Skills Matrix SkillsMatrix Skill Customize the calendar view Format bar styles for tasks in the Calendar view.
Audio Dial In: or CRM to RM Visual CRM to MS-CRM 2007 Visual User Group Nov 21 st 2007.
Virtual Interaction Manager
The Last Mile: Delivering the Facts – Client Side Analysis.
Project Management Software Application PRM 705 Lecture 32 1.
Microsoft Project 2010 ® Tutorial 6: Sharing Project Information with Other People & Applications.
Fourth R Inc. 1 WELCOME TO MICROSOFT OFFICE PROJECT 2003 INTRODUCTORY COURSE.
Motif 2.0 Summary Motif is built on the strength on Macromedia and Double Click. The heart of Motif is the Motif Ad Kit – let you create preview and publish.
0 eCPIC User Training: Dependency Mapper These training materials are owned by the Federal Government. They can be used or modified only by FESCOM member.
FIX Eye FIX Eye Getting started: The guide EPAM Systems B2BITS.
Building Dashboards SharePoint and Business Intelligence.
EMARS 3.9 Familiarization November Logging In Larger Font No overlap of text and picture.
Lesson 7 – Microsoft Excel 2010 Working with Tables, PivotTables, and PivotCharts.
Gold – Crystal Reports Introductory Course Cortex User Group Meeting New Orleans – 2011.
Introduction to KE EMu Unit objectives: Introduction to Windows Use the keyboard and mouse Use the desktop Open, move and resize a.
Introduction to KE EMu Unit objectives: Introduction to Windows Use the keyboard and mouse Use the desktop Open, move and resize a.
PestPac Software. Leads The Leads Module allows you to track all of your pending sales for your company from the first contact to the close. By the end.
Unit 3: Text, Fields & Tables DT2510: Advanced CAD Methods.
Microsoft Office 2013 Try It! Chapter 4 Storing Data in Access.
Chapter 3 Graphs and Charts. Agenda Chart Object linking and embedding.
Asset accounting-29.pptx This course will give an overview of the following Workbreakdown Structure Network Project Builder Project Planning.
SmartClient for Salesforce – Office 365 Excel Solution Walk-through.
Microsoft Project Mastering Microsoft Project 2010 Instructor: Tom Vorves Dial In:1 (800)
 2002 Prentice Hall. All rights reserved. 1 Introduction to the Visual Studio.NET IDE Outline Introduction Visual Studio.NET Integrated Development Environment.
Power View Overview April 25, POWER VIEW Presentation ready visualizations for the masses.
Exercises Complete Exercise 8 using profile 7, CAT2
Kanban Task Manager for Outlook ‒ Introduction
Kanban Task Manager SharePoint Editions ‒ Introduction
Student Registration/ Personal Needs Profile
All Right Reserved © JiJi Technologies Pvt Ltd
Student Registration/ Personal Needs Profile
Business Intelligence
All Right Reserved © JiJi Technologies Pvt Ltd
Kanban Task Manager SharePoint Editions ‒ Introduction
SAP University Alliances
Presentation transcript:

Graphical Work Order Scheduling in SAP Larry Wiltz and Eric Huang May 21st, 2003

Graphical Scheduling in SAP - Problem Problem Description Needs Graphical Representation of Scheduling Data Simple, intuitive format of data Links work capacity to scheduling activities Interactive interface Dynamic updates and checking with SAP Useful work order assignment prints

Graphical Scheduling in SAP – IW38 Option 1 - Operation List Edit (IW38) Advantages Comprehensive Selection Criteria Tabular Report Format - Adjustable Display Built in Graphical Representation Refresh Capability Simple Download to Excel

Graphical Scheduling in SAP – IW38 Option 1 - Operation List Edit (IW38) Disadvantages Difficult to Schedule Snapshot Graphical Display Static, non-interactive Limited data display No linking to capacity planning

Standard Gantt Chart Display Graphical Scheduling in SAP – IW38 Option 1 - Operation List Edit (IW38) Standard Gantt Chart Display

Graphical Scheduling in SAP – IW38 Option 1 - Operation List Edit (IW38) In Practice Download the data into Excel Scheduling done in Excel (still no graphical interface) Data not re-entered into SAP Performance information is lost Cost information is lost/disconnected from invoicing Work orders “forgotten” or “dropped”

Graphical Scheduling in SAP Excel Download from IW38

Graphical Scheduling in SAP – P3 Option 2 - Export to Scheduler (Primavera) Advantages Scheduling is much more robust Scheduling tools are excellent Packages are designed specifically for scheduling Hooks are provided from SAP to tools

Graphical Scheduling in SAP – P3 Option 2 - Export to Scheduler (Primavera) Disadvantages (Export Only) Data is exported only Performance information is lost Cost information is lost/disconnected from invoicing Error checking not available

Graphical Scheduling in SAP – P3 Option 2 - Export to Scheduler (Primavera) Disadvantages (Export/Import) Requires third party integrator Software (in addition to SAP and Primavera) Hardware (servers to hold interface engine) Geared to Project Systems Link data to PM objects to PS analogs Additional work required for linking * Impress software is doing pilot at Valero

Graphical Scheduling in SAP – P3 Option 2 - Export to Scheduler (Primavera) In Practice Export to Primavera used All scheduling performed in Primavera SAP scheduling data is inaccurate SAP data cannot be re-exported without date conflict SAP work orders only hold invoice/cost data No relations to scheduling dates

Graphical Scheduling in SAP – ZSC3 Valero Goals for Work Order Scheduling Scheduling “Cockpit” Graphical Representations Work Order dates Capacity Level Graphical Interaction Double-click to standard SAP transactions Drag-n-drop functionality for scheduling Reports/Document Printing

Graphical Scheduling in SAP – ZSC3 Graphical Work Order Scheduler

Graphical Scheduling in SAP – ZSC3 Solution - Graphical Work Order Scheduler Adaptation of SAP Operation List Edit (IW38) Adds interactive graphical scheduling Drill Down (IW32, CR02, expandable) Drag-n-Drop Scheduling Relationship Linking View Scheduling and Capacity Levels Built on STANDARD SAP components

ZSC3 – General Features Solution - Graphical Work Order Scheduler Zoom In/Zoom Out Printing via Microsoft Drivers (Plotters are okay) Movable/Sizable “Windows” Object orientated programming (ABAP objects)

ZSC3 – Gantt Chart (Work Orders) Overview of Features – User Elements Double Click Order - create “finish-start” relationships Operation - define lag between operations Relationship Line - define lag between operations Create/delete individual relationships between operations Menu/Menu Bar Display/Collapse Operations

ZSC3 – Gantt Chart Side (Work Orders) Overview of Features – Graphical Elements Color coded orders (e.g. - status codes, etc.) Color coded operations (e.g. - “must start on” etc.) Multiple item selections and group actions Display area scrollable Display area can be resized

Work Order Overview - Collapse Operations ZSC3 – Gantt Chart Side (Work Orders) Work Order Overview - Collapse Operations

Work Order Chart Side Functionality - Double Click ZSC3 – Gantt Chart Side (Work Orders) Work Order Chart Side Functionality - Double Click

Work Order Chart Side Functionality - Double Click ZSC3 – Gantt Chart Side (Work Orders) Work Order Chart Side Functionality - Double Click

ZSC3 – Table Side (Work Orders) Work Order Table Side – Display Elements Column Display from List Edit Report Columns adjustable Capture data from list edit (sorting, field order) Display area scrollable Display area can be resized Work Order Table Side – User Elements Double Click - Work Order Change (IW32)

Work Order Table Side Functionality - Double Click ZSC3 – Table Side (Work Orders) Work Order Table Side Functionality - Double Click

ZSC3 – Gantt Chart Side (Work Ctr.) Overview of Features – Graphical Elements Capacity loading based on work center and date HR module inclusion being developed Green - work center is below/at capacity Red - work center is above capacity Gray - non-work day or holiday Display area scrollable Display area can be resized

ZSC3 – Gantt Chart Side (Work Ctr.) Overview of Features – User Elements Double Click - Work center specific forecast report

ZSC3 – Gantt Chart Side (Work Ctr.) Work Center Barchart Side Functionality

Forecasted Man Hour Report ZSC3 – Gantt Chart Side (Work Ctr.) Forecasted Man Hour Report

ZSC3 – Table Side (Work Centers) Overview of Features – User Elements Double Click to drill-down to work center display Overview of Features – Display Elements Shows work center name, description, and plant Display area scrollable Display area can be resized

Work Center Table Side Functionality - Double Click ZSC3 – Table Side (Work Centers) Work Center Table Side Functionality - Double Click

Do it Yourself (maybe) Base Program – RIAFVC20 Copy main program (leave includes alone*) Definitely use ALV features Key Structure – RIHAFVC Display control for IW38 list edit Configuration Graphical Profile Define Shapes Define Colors Define Fields

Graphical Scheduling in SAP Demonstration ZSC3 Graphical Work Order Scheduler Manipulate Table Display Refresh Data Build Relationships Sort by ORDER HEADER DATES

Acknowledgements www.valero.com www.sapsolutions.net Denis DeSautels, IBM

Thank you for attending! Please remember to complete and return your evaluation form following this session. Session Code: 3612