MEP (Martian Environmental Pod) 2/16/2004 Aerospace Engineering Department University of Colorado-Boulder Interim Review.

Slides:



Advertisements
Similar presentations
Introduction to CAD/CAM/CAE
Advertisements

UNIT 16: Extrusion and Injection moulding Manufacturing Engineering Unit 16 Copyright © 2012 MDIS. All rights reserved. 1.
Fair Use Building and Research Labs Presents
Applied Control Systems
Glenair Micro-D Connectors: New Product Offerings.
1 Aerospace Soldering & Electronic Assembly Techniques Randall Pearl.
1 Ladder assembly steps HFT PIXEL updated for ultimate chip ladders 2/12/2012 ladder fixture u.SLDASM.
Vertical-Axis Wind Turbine Kang Zheng Aaron Peterson Mohd Ramjis.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
GLAST LAT Project I&T Meeting – Jan 29,2004 E. Gawehn 1 GLAST Large Area Telescope: MGSE Status Report Eric Gawehn SU-SLAC I&T MGSE Engineer
P08456-LED Lighting for an Underwater ROV Jeremy Schiele-Project Manager Jonathan Lent-Mechanical Engineer Ryan Seeber-Computer Engineer Justin VanSlyke-Mechanical.
AMS-02 tracker mechanics status of construction, assembly, integration Production: - Ladder integration - Installation on planes Inner tracker assembly:
GLAST LAT ProjectF2F, June 15, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety Assurance Manager.
Team Bi-directional -Keith Beland -Christian Brinegar -Justin Marsha.
Airbag Automaton John Bailey Hattie Hiatt Chun Hau Low Jason Harwood Wayne Gallup Jason Canaday.
Introduction CNC (Computer Numerical Control) Machines are automated machines, which uses programs to automatically execute a series of machining operations.
AUTOMATION & PRODUCTION TECHNOLOGY. PROJECTS Students learned about group dynamics and the Engineering Design Process How can we build the tallest structure.
Sponsor/Customer: Dr. Ferat Sahin Multi Agent Bio-Robotics Lab Faculty Guide: Prof. George Slack Team Members: Matthew LeStrange – Electrical Engineering.
NCSX Modular Coil Turning Fixture FDR. FDR Charge (answers were added below after the review) Modular Coil Turning Fixture FDR - Charge to Reviewers –The.
Motors Make the world go ‘round By Jackson Greer, Room 305.
New Mexico FFA Agricultural Mechanics Career Development Event Engine Power.
© UNT in partnership with TEA1 7 th Grade Career Exploration Module Career Focus: Electrical Engineer Occupation.
AQA Electronic Products Exam Format. AQA :WRITTEN EXAM PAPER 2011 TIME: 1.5 HOURS USE BLACK INK USE PENCIL FOR DRAWING.
Mickael Frotin– 15/01/2010 ECAL MACHANICAL R&D ECAL meeting - PARIS 1.
By Robbie(12), Robin(12), Lewys(12), Tim(8), Kurt(12), Josh(12) and Lachlan(10).
Chiho Wang ATLAS TRT Duke University CERN, Feb Fuse Box Status Chiho Wang Duke University.
1 Progress On The Design And Manufacture Of The New Stator Geoff Barber Imperial College.
CanSat Mid-Term Presentation Group Members: Samuel Rustan,Yasmin Belhaj, Andrew Grant, Andrew Guerr, Maxwell Sandler Technical Advisors: Dr. David Cartes,
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
Automated Industrial Wind Tunnel Controller By Daniel Monahan and Nick DeTrempe Advised by Dr. Aleksander Malinowski.
Introduction to Design. Five Stage Electronic Design and Fabrication Process Design Stage Drawing Stage Experimentation Prototyping Stage Testing / Troubleshooting.
Current Electricity Parallel Circuit Notes Rule #1: In a parallel circuit electrons have more than 1 path to follow.
1 Discussion for basic options — engineering video conference July 12, 2006 Outline Water pool — advantages — issues, problems, engineering options Aquarium.
ELECTRICAL ENGINEERING TECHNOLOGY EET 330: ELECTRONIC DESIGN Instructor: Albert Lozano.
Final Demonstration Team 2A The Charles Machine Works Downhole Generator Project.
MEP (Martian Environmental Pod) Fall 2003 Aerospace Engineering Department University of Colorado-Boulder Critical Design Review.
Key Stage 3 A Suggested Year 9-10 Project Technology & Design RA Moffatt WELB. RA Moffatt WELB.
Automotive Electricity and Electronics, 2/e By James D Halderman © 2009 Pearson Education, Inc. Pearson Prentice Hall - Upper Saddle River, NJ FIGURE.
Main Electronics Package
ELECTRICAL ENGINEERING TECHNOLOGY PROGRAM EET 105: ELECTRICAL SYSTEMS Instructor: Albert Lozano Introduction to the EET Laboratory.
EML 2023 Portfolio. EML 2023 Department of Mechanical and Aerospace Engineering HW 1 – Three View Drawings 2 Problem 1.
Sophisticated Design Automatic Tailgate Final Presentation December 5, 2001 Ted Akiskalos June Doan Tarek Elshazly Maggie Kim David Nimitz Sharon Ramey.
MEP (Martian Environmental Pod) 3/15/2004 Aerospace Engineering Department University of Colorado-Boulder Interim Review #2.
Production of Petal Mechanics. Petal plates (EUROCOMPOSITE) to be made with T300 skins (+45°/-45°) Second skins (FVT) are M40 (0°/90°) and are available.
1 Team Mieux Critical Design Review ASME Bulk Material Transporter AME 470 Ltd. December 7, 2004.
Service Learning Project SLICE Prototype Fabrication Experience Ability Switch Test Box.
Bryan McDonnel Michael Mize Ryan Taylor (presenter) Miles Whittaker
P – , TOW TANK FOR TETHERED HYDROFOIL TEAM MEMBERS: Hope Alm (ME)Tim Buckner (ME) William Lentlie (ME) Andres Santizo Matheu (ISE) Shauna.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
Main Parts of a Drilling Machine
MAE 435 Progress Report Team: Formula SAE Due Date: 2/8/2016 Advisors: Dr. Bawab; Nathan Luetke Presenter: Ryan P.
BY SAM.  Computer-aided design [CAD]  Computer-aided manufacture [CAM]  CAD/CAM systems  Computer-aided engineering (CAE) 1/17/2012 ICT on Engineering.
AMCOM MK66 IAB Presentation Adrian Lauf (Comp.E) Jason Newquist (Mech. E)
Wire and Cathode Planes - Current Concept (work in progress) PPD Internal Review – 2 nd Part April 19 th, 2005 Rafael Silva FLARE Fermilab Liquid Argon.
Meeting at Chooz PMTs Mechanical support on the Buffer. Updates. Enrique Calvo Alamillo
WIRE DRAWING: DRAWING Typical drawing processes: 1.Single draft drawing 2.Tandem Drawing - Cold working improves the mechanical properties - Intermediate.
Modeling.
7th Grade Career Exploration Module
CSU-1 Project Updates Mechanical:
Modeling Introduction to Engineering Design
Modeling.
Modeling.
Parallel Circuit Notes
Modeling Introduction to Engineering Design
Cryomodule Assembly Plan
Electronics Contract Manufacturing Service Topscom provide an extensive turnkey electronics manufacturing service range of fabrication, engineering and.
AN-NAJAH NATIONAL UNIVERSITY FACULTY OF ENGINEERING
UPPSALA UNIVERSITY_GERSEMI PROJECT
Presentation transcript:

MEP (Martian Environmental Pod) 2/16/2004 Aerospace Engineering Department University of Colorado-Boulder Interim Review

Requests for Action RFAAuthorSolution Verify clearances of deployment PetersonProved during initial testing Make jigs to aide assembly of all the parts Peterson/ Trudy Developed method of assembling parts Electronics package needs to be taller for clearance Peterson/ Rhode Corrected in Solidworks/Corel Draw drawings Control motor speed. Avoid damage. TrudyRPM of motor is low enough that no damage will result from the motor

x 10 Electronics Package Platform Mounting Box Greenhouse Thermal Petals

Design Changes Greenhouse/Pressure System –New deployment method for greenhouse –Circular top will be secured by an acrylic ring inside of the greenhouse Thermal Shield –Material of axle is aluminum Electronics/Software –Changed design of circuit to include: Op Amp Transistor Diode Capacitor

New Circuit Design

Progress Solidworks drawings → Corel Draw Prototypes of petals 7-10 –Machined/Assemblied –Tested Prototype circuit on solderless breadboard Demonstration version of circuit on wire wrap breadboard

Current Issues: Greenhouse/Pressure System Kapton is too stiff to roll for deployment –Molding tool for new design Difficulty attaching circular top to cylindrical base –Acrylic ring will be secured inside the top of the greenhouse to ease manufacturing

Current Issues: Thermal Shield During initial testing, shear stress was too great at the rotation point on the petals. –Aluminum sleeve fits over the outermost petal and is welded to the axle to distribute the torque applied. –Runs half the length of the outermost petal

Current Issues: Electronics/Software LabView class –Trying to take course to learn software programming –High risk if taken through the ITLL

Additional Parts Molding tool Acrylic ring for greenhouse manufacturing Aluminum axle Aluminum sleeves for petal 1 Mounting bracket for motor

Schedule Progress

Critical Path Elements Machining acrylic parts (1/12 – 2/23) Assemble petals and base structure (2/2 – 3/19) Machine/construct molding tool (2/16 – 3/8) Manufacture greenhouse (2/9 – 3/19) Test pressure system (2/16 – 3/1) Build final soldered circuit (2/23 – 3/15) Develop software using LabView (2/23 – 3/19)

Budget Analysis DateCompanyPartsPhone NumberContactAmount 12/15/2003Kinko'scopies /15/2003Kinko'scopies /17/2003Colorado Plastic Products Inc.acrylic, epoxy /15/2004R.S. Hughes Company Inc.epoxy /20/2004Omega Engineering Inc.thermistor, pressure transducer /21/2004Maxon Precision Motors Inc.motors, gearboxes Mike Beasley /22/2004R.S. Hughes Company Inc.epoxy gun, mixing nozzles Thomas /27/2004American DurafilmKapton /28/2004McGunkin Hardware Inc.clamps, aluminum rods, key /28/2004Colorado Plastic Products Inc.acrylic /28/2004R.S. Hughes Company Inc.mixing nozzles Thomas /28/2004The Lee Companycontrol valve John Caron0.00 1/30/2004Radio Shackelectronics /31/2004Radio Shackelectronics /31/2004Fistell'srelay switch /9/2004Colorado Plastic Products Inc.acrylic /12/2004The Beverage Factorycarbon dioxide tank Total:1,291.21

Questions?