MICE Target Status Chris Booth Sheffield 10 th May 2006.

Slides:



Advertisements
Similar presentations
MICE MICE Target Mechanism Paul Smith University of Sheffield 8 th June 2010 (Based upon talk given by Chris Booth at CM26)
Advertisements

K. Long, 18 April, 2015 Beam-line status — red sky at night?
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
MICE Target Report Video Conference 15/03/07 Chris Booth Sheffield 15 th March 2007.
MICE Target Report Chris Booth (for target team) Sheffield 23 rd April 2009.
The MICE Target Lara Howlett University of Sheffield.
Progress on Target Design Chris Booth Sheffield 2 nd August 2004.
Target Status Report Lara Howlett University of Sheffield.
MICE TARGET HARDWARE C. Booth, P. Hodgson, R. Nicholson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 - The MICE Experiment.
MICE Target Development Chris Booth Sheffield 8 th June 2006.
MICE Target Report Chris Booth (for target team) Sheffield 7 th May 2009.
MICE: Hall Infrastructure Chris Nelson CEng CM16 8 th Oct 2006.
MICE Target Schedule Chris Booth Sheffield 12 th June 2006.
MICE Target Report Chris Booth (for target team) Sheffield 24 th March 2010.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
Target Update – Mico Meeting Monday 21 st April 2008 General Expect to obtain new coils for stators anytime New Shafts at RAL for metrology. Will be back.
Stator Plan & Schedule Chris Booth 2 nd March stators to construct for mid-April. One complete coil assembly recovered from ISIS drive. Coils recoverable.
MICE Target Review Chris Booth Sheffield 12 th June 2006.
A Tale of Two Targets … 7 th September 2009 Chris Booth The University of Sheffield.
Target Assembly and Installation Update 20 th August 2009 Paul Hodgson The University of Sheffield.
DESIGN AND OPERATIONAL EXPERIENCE OF THE MICE TARGET Target Drive The linear electromagnetic drive that has been designed to meet these requirements consists.
MICE Target Report Video Conference 05/07/07 Chris Booth Sheffield 5 th July 2007.
Target Design – Status and Plans Chris Booth Sheffield 12 th January 2005.
MICE Target Mechanical Design l Jason Tarrant – STFC »Working on upgrade of Target Mechanics l Contents »Main features of upgrade design »Progress & schedule.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
MICE Target Mechanism P J Smith University of Sheffield MICE CM 18 RAL June 2007.
Chris BoothMICE-UK I.C. 16th January Useful meeting held at RAL last Thursday. Representatives of MICE, ISIS & others with Sheffield electronic &
NuMI NBI2006 September 9, 2006 NuMI Repairs for Hot Components Jim Hylen / FNAL Page 1 NuMI Repairs for Hot Components (1 sievert = 100 rem) Problem On.
VELO workshop, Amsterdam, april ‘00M.Ferro-Luzzi Difficulties with current mechanical design recent FEA results: to obtain sufficient stiffness of center.
MICE Target – Design Update and Test Plans Chris Booth Sheffield 22 nd October 2005.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
Flat Saw Training. Flat Saw Sizes –Low Horsepower Blade diameters range from 8” (200mm) to 18” (450mm) Power ranges from 4 to 25 horsepower.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
MICE Target - Risk Lara Howlett University of Sheffield.
Target Status Target installed in ISIS “Demonstrator” target in R78 Chris Booth Sheffield 7 th February 2008.
Target Status CM19 RAL October 2007 P J Smith – University of Sheffield.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
MICE Target Mechanical Design l Status of Target ref. Schedule »Drawings –Drawing list created (see next slide) includes inventory –Drawings being released.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
MICE Target Development Lara Howlett University of Sheffield.
Status of Target Design Chris Booth Sheffield 28 th October 2004.
NuMI/MINOS Status All Exp. Mtg. June 2, 2008 Jim Hylen/FNAL Page 1 FAR DETECTOR: 98.0% live time (wall clock) There was a power outage on the morning of.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
1 MICE Beamline Installation, status & plans Contents: Upstream & Target, BPM Decay solenoid DSA, D2, Q4,5,6 cKOV support Q7,8,9 Open issues & concerns.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
1 Status of Vacuum Process Facilities at SSL 16 October 2009 Sharon R Jelinsky Space Sciences Laboratory, UC Berkeley.
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
Target Status Report Chris Booth & Paul Hodgson Sheffield 18 th Sept ember2008.
Chris BoothUniversity of Sheffield 1 Target Status & Progress 1 st February 2006 Disappointingly slow progress over last 2 months. However, progress is.
CM2 Repair Status 8/13/2012 Tug Arkan 1. Latest Status After the warm end couplers were disassembled, it was decided to disassemble all the lower aluminum.
CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 1 The CMS Electromagnetic Calorimeter UK Responsibilities Procurement and testing of VPTs Design.
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
MICE Target – Status & Plans Chris Booth Sheffield 28 th February 2006.
US Construction Project: SSs, PRY, Cavities and test program MICE Project Board and RLSR – November 17, 2014 Alan Bross1.
Target Status 27 th August 2009 Chris Booth The University of Sheffield.
The Target Drive For The MICE Experiment Control and Infrastructure Optical Readout and Drive Electronics Target Drive A linear electromagnetic drive has.
Chris Booth Sheffield 29th March 2006
Stator Plan & Schedule Chris Booth 2nd March 2009
Target Installation Plan
Completion of the MICE-US construction project
F.E.T.S. Mechanical Engineering Update
MICE Target Report Video Conference 29/11/07
Hall A Target Status 9/27/16 Dave Meekins.
Status of Target Design
Overview of the TARGET Monolith Rough Vacuum
Polarized 3He target installation
Presentation transcript:

MICE Target Status Chris Booth Sheffield 10 th May 2006

Chris BoothUniversity of Sheffield 2 Focus of recent work has been assembly tests at RAL 24 th -28 th April. –Review of components –Results of tests –Preliminary follow-up plans

Chris BoothUniversity of Sheffield 3 Components Stator body Ceramic tube Glass readout tube Target shuttle Ceramic bearings Electronics Frame, jack, bellows, gate-valve

Chris BoothUniversity of Sheffield 4 Stator Micro-surgery on Manchester body has allowed insertion of ceramic tube! Tolerances around ceramic slightly tight. We have learned how to make all components for future stators in house.

Chris BoothUniversity of Sheffield 5 Ceramic tube Test flanges & dummy stator built at RAL. Indium vacuum seals tested. Pronounced satisfactory!

Chris BoothUniversity of Sheffield 6 Optical readout enclosure Quartz glass tube and flange procured. Flange machined, tube fixed with cryostat cement.

Chris BoothUniversity of Sheffield 7 Shuttle Oxford agreed to assemble shaft, target, alignment fin, stop, magnets, readout vane (see picture) – many thanks! Magnets, readout vane supplied by Sheffield. For prototype, shaft produced from steel tube rather than titanium. Assembly cleaned in Oxford, delivered direct to RAL.

Chris BoothUniversity of Sheffield 8 Titanium target Steel shaft Alignment fin Stop Magnets Optical readout vane

Chris BoothUniversity of Sheffield 9 Ceramic bearings Slot for alignment fin Hole for alignment pin

Chris BoothUniversity of Sheffield 10 Control electronics Cards now rack- mounted. Extensive tests with prototype drive. Several hours pulsing at 0.3 Hz (10 A). Some reliability & noise problems to be addressed.

Chris BoothUniversity of Sheffield 11 Bellows

Chris BoothUniversity of Sheffield 12

Chris BoothUniversity of Sheffield 13 Indium seals Ceramic bearings

Chris BoothUniversity of Sheffield 14 Beam pipe Gate valve Bellows Drive mechanism Support frame

Chris BoothUniversity of Sheffield 15 Assembly test: April First time many parts came together: –Stator first connected to electronics 20 th –Glass readout tube assembled 21 st –Target shuttle finished morning of 24 th –Some RAL parts and flanges not previously assembled.

Chris BoothUniversity of Sheffield 16 What did we learn? 1.Glass tube is very fragile! –Broken near metal flange. –Ground down and re-glued – vacuum tested ok. –New crack when tightened down onto full assembly. –Covered in epoxy! Amazingly, this appeared to seal ok!

Chris BoothUniversity of Sheffield 17 2.Target shuttle was distorted –Slot cut along thin-walled tube to take alignment vane caused shaft to distort. –Vane was twisted and slightly off-axis at one end. –Would not pass through ceramic bearing. –Slot & hole in bearing machined out to allow shaft and vane to pass. –Some play and roughness, but movement satisfactory.

Chris BoothUniversity of Sheffield 18 3.Indium seals did not work! –Despite success with test pieces, could not pump down below 3  10 –3 mbar. –Flanges found to have too large diameter and chamfer; rebates incorrect so inadequate closure of seal. –Attempts to seal with extra indium. –Only partial improvement. –Prevented vacuum quality checks with mass spectrometer.

Chris BoothUniversity of Sheffield 19 4.Temperature sensitivity –Operation of drive (power-off to park position) caused deterioration in vacuum. –Chilled water cooling (12°C) also worsened vacuum. –Partial recovery on return to ambient temperature. –Movement of ceramic tube disturbing (imperfect) seal?

Chris BoothUniversity of Sheffield 20 5.Optical readout block did not fit –Insufficient space for readout block around glass tube when drive in raised position. –Large guide flange removed – appears not to be necessary. –Flange could also be machined down to allow space. 6.Extremely difficult to align optics –Higher refractive index of quartz tube? –RAL restrictions on use of laser in hall.

Chris BoothUniversity of Sheffield 21 Solutions 1 & 6 Replace glass tube with steel plus flat glass windows –Robust, much simpler optics. –Redesign optical mounts to allow off-line alignment. 3 & 4 Flanges for indium seals to be re- ground or re-made –Vacuum and temperature tests will be performed at RAL.

Chris BoothUniversity of Sheffield 22 2 Oxford redesigned target shuttle –Target, shaft, stop, alignment fin machined out of single piece of titanium. –Cross-shaped cross-section. –Strong, no tendency to twist. –Only magnets and readout fin to be added. –New (or modified) ceramic bearings will be required – design to allow insertion of shaft through lower bearing for easier assembly.

Chris BoothUniversity of Sheffield 23 Conclusions(1) Still digesting results of week before last! Despite problems, a lot was learned. Practical details of assembly tested for first time. Learned what does, what doesn’t work. Improved design of major components (optical windows & readout mount, target shuttle). No proper vacuum tests. No reliability or vibration tests. Review (with ISIS) 23 rd May.

Chris BoothUniversity of Sheffield 24 Conclusions(2) Parts (flanges etc) now in Sheffield for full system tests under vacuum. Will repeat assembly in hall. Will conduct reliability tests in Sheffield, then in assembly hall. Will not be able to install in ISIS for June – must perform thorough off-line checks to demonstrate readiness for October access. High-current driver electronics should be ready mid-summer (was not planned for June).