2.12.03TRD Status meeting GSI Clemens Adler TRD ROC Status.

Slides:



Advertisements
Similar presentations
Make friends with it as soon as you can. Whats it for? For you educational tool for your continuing professional development the means by which you gather.
Advertisements

3D Printing Change this title.
Mainttobe Breakdown Maintenance Process Production Operator/supervisor Investigate fault Breakdown event Quick Fix Yes No Fix it Maintenance Team Repair.
TRD Production at GSI Joerg Hehner TRD Collaboration Meeting Bucharest
TRD Collaboration Meeting GSI Clemens Adler TRD Chamber production issues General Issues, Planning and Hd Status.
TRD Status meeting Münster Clemens Adler TRD ROC Status The long and winding road to production start.
TRD August 2007 A. Marín (GSI) 6/11/2015 STATUS TRD COOLING TRD STATUS MEETING August 2007 STATUS TRD COOLING TRD STATUS MEETING August 2007.
TRD ROC Status Clemens Adler TRD Status Meeting TRD ROC Status.
Thinking Mathematically
TRD status meeting GSI Clemens Adler TRD (Pre-)Production Status New Results/Experiences Problematic issues Production Plans Timescale.
Hd Status and Planning TRD Chamber Construction Meeting Clemens Adler.
CMS Tracker Week – Gantry Meeting – 21 st October 2003 – Dean White 1 Status of the UCSB Gantry Dean White University of California Santa Barbara October.
TRD Status Meeting Münster Clemens Adler TRD ROC Status Status Meeting Münster
TRD Collaboration meeting GSIClemens Adler First TRD Production Chambers Production Tests Results Documentation.
Chamber production status 75% of production (of 1st half of detector) reached in May Currently ~80% is produced 100% (1st half) expected in October. End.
TRD Status meetingClemens Adler TRD Production Status -Material -Tooling -Timescale.
TRD Status meeting IKFClemens Adler TRD ROC Status -Dubna -Bukarest -GSI -Frankfurt -Heidelberg.
8.7.04TRD Status meeting HdClemens Adler TRD ROC Status.
TRD Collaboration meeting GSIClemens Adler First Production Chambers Production/tests/results.
Technical Forum Alice week Clemens Adler Transition Radiation Detector Status Participating Institutions: Athens University, NIPNE Bukarest, JINR.
TRD Status meeting HeidelbergClemens Adler Chamber production Production status/ Material status.
TRD Status meeting GSIClemens Adler Chamber production Production status/ Material status.
TRD Status meeting Alice week HdClemens Adler TRD Chamber Status News: New leak rate measurements Production is imminent Some material arrived Soldering.
Production NIPNE Completely finished and tested: L1C sent to GSI L2C sent to GSI L2C sent to GSI L3C Total: 36 =
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
1 times table 2 times table 3 times table 4 times table 5 times table
Engineering Design Review for TRD-Readout Chamber
Technology Brief: Self Propelled Vehicle Competition.
LHCb MUON MPWC STATUS OF TOOLING, SITES, PRODUCTION AND MATERIAL PROCUREMENT.
Barbour County Board of Education
TB Peter Glässel, Heidelberg1 TPC Progress Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
computer
SQXF Winding Test Proposal Concept at LBNL Dan Cheng Sept 17, 2013.
TRD and Global tracking Andrey Lebedev GSI, Darmstadt and LIT JINR, Dubna Gennady Ososkov LIT JINR, Dubna X CBM collaboration meeting Dresden, 27 September.
Basic Ceramic Tool Set A. Wire Tool B. Metal Rib Tool C. Needle Tool D. Metal Loop Tool E. Modeling Tool F. Metal Ribbon Tool G. Sponge H. Wood Rib Tool.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
Previous Week’s Goals Status Goal Status Narrow down materials through 98% Complete testing (all) Continue to learn Inventor In Process TestingIn Process.
G. PassalevaRoma - July 28, 2004 Status of MWPC production site in Florence G. Passaleva.
JINR-BMBF Workshop, Dubna Clemens Adler PI Heidelberg ALICE TRD Transition Radiation Detector Overview and Status Clemens Adler Physikalisches.
Notes 4.1 Patterns, Tables, and Expressions A table of values is a table that is used to organize several values of an expression. Example 1 A skating.
09/07/20021Muon Meeting Status of MWPC activities at CERN and PNPI Outline: Module 0 status and plans –M3R1 (CERN) –M3R2 (CERN) –M3R4 (PNPI) Tooling status.
WEEK 1 You have 10 seconds to name…
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
By Levi Koller. SCHOOL  Spend 8 hours a day four days a week HOME WORK  1 ½ hours after school to work on it five days a week.
Appmon: a tool for monitoring of application jobs Current status of T2.1 Subtask: Monitoring of application jobs coordinator: A. Kryukov (SINP MSU), V.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
TRD Workshop RomaniaClemens Adler Heidelberg ROC Status Material procurement, Chamber Status TRD workshop Cheile Grandistei, Romania,
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
Tables Learning Support
1. Take HV harnesses with label (IHV2) and transfer on the Stacking table. 1.1 Inspect HV harnesses visually. 2.1 Insulate HV Flex with 3M™ VHB™ Tape.
EMCal Meeting Nantes – July J-F Muraz  Grenoble Status  Assembly and test Hall.
GSZAJNB818\MSSQLSERVER_SORD,1500 Table – OC_ST_Plan_Transactions_BPF GSZAJNB818\MSSQLSERVER_SORD,1500 Table – vw_Site_Action_Register_BPF Cancelled.
Maintain Home with Best Roof Repairs Services in Roseville
Unit 1 week 5 Ava.
Cost functions A small T-shirt factory One machine is leased at the rate of $20 per week, The machine is operated by one worker Hourly wage : $1 during.
Soldering process 1 Add the soldering material on the soldering pad of speaker in order to solder the wire on the speaker.
Learn To Fix Errors On Dell PC. We are a third-party service provider for Dell users in Nederland. Call us on Website:
ROD model assessment ROC FR
A new beginning.
Turing Machine
Times Tables.
COMPUTER SERVICE NEAR ME. Is there any problem in your COMPUTER device. There's no need to worry. NCENTRIC offers reasonably priced computer repair.
Vereinfachung der CBM TRD Elektronik
UNIT 1 PROJECT PLANNING.
TECHNOLOGICAL PROCESS
Heidelberg Module Production
3 times tables.
6 times tables.

Extended Registration KS3
Presentation transcript:

TRD Status meeting GSI Clemens Adler TRD ROC Status

TRD Status meeting GSI Clemens Adler Tooling Winding machine modifications done Hecht measuring table and computer fixed Vacuum/gluing tables are fine after first experiences

TRD Status meeting GSI Clemens Adler Material Padplanes: Optiprint offer came last week (reasonable price)...

TRD Status meeting GSI Clemens Adler

TRD Status meeting GSI Clemens Adler Problem: Radiators not perfecty flat: glue seeps through

TRD Status meeting GSI Clemens Adler David‘s Viagra tool

TRD Status meeting GSI Clemens Adler

TRD Status meeting GSI Clemens Adler

TRD Status meeting GSI Clemens Adler

TRD Status meeting GSI Clemens Adler

TRD Status meeting GSI Clemens Adler Next steps Wiring Glue Padpane panel (with AW106, rubber roller) Whatever else has to be done...