GLAST June 8, 2000, P. Roger Williamson, BFP - 1 Balloon Flight Planning Roger Williamson June 8, 2000.

Slides:



Advertisements
Similar presentations
Controller Tests Stephen Kaye Controller Test Motivation Testing the controller before the next generation helps to shake out any remaining.
Advertisements

STARLight PDR 3 Oct ‘01I.1 Miller STARLight Control Module Design Ryan Miller STARLight Electrical Engineer (734)
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Online 1 GLAST Large Area Telescope: I&T Integration Kickoff Meeting EGSE Hardware March 9th,
GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Gunther Haller 1 Electronics, Data Acquisition & Flight Software Gunther Haller.
GLAST LAT Project 1 Tracker “mini-tower” Full Size Calorimeter module Face to Face IDT meeting March 20, 2002 Convener: E. do Couto e Silva Engineering.
GLAST LAT ProjectGLAST Flight Software IDT, October 16, 2001 JJRussell1 October 16, 2001 What’s Covered Activity –Monitoring FSW defines this as activity.
GLAST LAT Project Quarterly Review, Aug. 14, 2001 Gunther Haller1 GLAST Large Area Telescope: Electronics, DAQ & Flight Software Gunther Haller Stanford.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT Project4.1.7 July 17, 03 LAT Meeting G. Haller V41 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S LAT.
GLAST LAT Project SE Test Planning meeting October 4, 2004 E. do Couto e Silva 1/13 SVAC Data Taking during LAT SLAC Oct 4, 2004 Eduardo.
ISOC Peer Review - March 2, 2004 Section GLAST Large Area Telescope ISOC Peer Review Test Bed Terry Schalk GLAST Flight Software
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT Project Analysis Meeting April 22, 2004 E. do Couto e Silva 1/5 SVAC Status SVAC Status Eduardo do Couto e Silva April 22, 2004.
GLAST Calorimeter SLAC LAT Meeting 17Jul 2003 Naval Research Lab Washington DC wnjohnson 1 SLAC Meeting Calorimeter Subsystem 17 July 2003 W. N. Johnson.
GLAST LAT ProjectPDU/GASU MRR, February 3, DAQ & FSWV1 1 GLAST Large Area Telescope: B. Estey, G. Haller SLAC xxxx LAT Quality Engineer
GLAST LAT ProjectI&T PDR Presentation – Jan. 9, 2002 R. Claus1 Integration and Test Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 LAT Housekeeping Sergio Maldonado Stanford Linear Accelerator.
14 Sep 2005DAQ - Paul Dauncey1 Tech Board: DAQ/Online Status Paul Dauncey Imperial College London.
PHENIX upgrade DAQ Status/ HBD FEM experience (so far) The thoughts on the PHENIX DAQ upgrade –Slow download HBD test experience so far –GTM –FEM readout.
GLAST LAT ProjectEGSE Peer Design Review, August 17, S. WilliamsEGSE Overview Electrical Ground Support Equipment Overview Scott Williams Stanford.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 GLAST Large Area Telescope: LAT System Engineering WBS Dick Horn.
TRIO-CINEMA 1 UCB, 2/08/2010 Instrument Interface Board Dorothy Gordon CINEMA - EE Team Space Sciences Laboratory University of California, Berkeley.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
EUDRB: the data reduction board of the EUDET pixel telescope Lorenzo Chiarelli, Angelo Cotta Ramusino, Livio Piemontese, Davide Spazian Università & INFN.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Cosmic Ray Tests at RAL AFE-IIt Firmware Development VLSB Firmware Development Summary.
Management of the LHCb DAQ Network Guoming Liu * †, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
DAQ Development P. Roger Williamson Hansen Experimental Physics Laboratory Stanford University GLAST Collaboration Meeting GSFC February 10, 1999.
Beam Test Plan 1999 P. Roger Williamson Hansen Experimental Physics Laboratory Stanford University GLAST Collaboration Meeting GSFC February 10, 1999.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
GLAST LAT ProjectI&T Face-to-Face Online Presentation – May 30, 2002 R. Claus1 I&T Online Status and Plans Ric Claus.
Source Controller software Ianos Schmidt The University of Iowa.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT ProjectI&T&C Pre PDR Presentation – Oct 2, 2001 B. Grist1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT Project4.1.7 G. Haller V2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S April Status Gunther.
GLAST LAT Project CU Beam Test Workshop 3/20/2006 C. Sgro’, L. Baldini, J. Bregeon1 Glast LAT Calibration Unit Beam Test Status Report on Online Monitor.
GLAST LAT ProjectSAS PDR, Aug. 17, 2001 R.Dubois1 Schedule Balloon Science Tools, Analysis Platforms Calibrations Performance Tuning, Tracking Data Production.
1 MICE Tracker Readout Update Introduction/Overview TriP-t hardware tests AFE IIt firmware development VLSB firmware development Hardware progress Summary.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR447 Command, Telemetry, and Ground Support Equipment (CTG)
LKr readout and trigger R. Fantechi 3/2/2010. The CARE structure.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
Management of the LHCb DAQ Network Guoming Liu *†, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: I&T Overview Elliott D. Bloom Stanford.
13-1 MAVEN PFP ICDR, May 23 – 25, 2011 Particles and Fields Package Critical Design Review May , 2011 GSE Timothy Quinn.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST Large Area Telescope Instrument to Spacecraft Interface Simulator (ISIS) Test Readiness Review 15 December 2004 Jana Thayer Eric Hansen Stanford.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 D. Nelson 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT ProjectSLAC Internal Review, April 16-18, 2002 LAT-PR Electronics and Flight Software WBS GLAST Large Area Telescope: Electronics,
BIS main electronic modules - Oriented Linac4 - Stéphane Gabourin TE/MPE-EP Workshop on Beam Interlock Systems Jan 2015.
C osmic R Ay T elescope for the E ffects of R adiation 27 June 2005 Digital Engineering Digital Sub-System Bob Goeke.
Eric Hazen1 Ethernet Readout With: E. Kearns, J. Raaf, S.X. Wu, others... Eric Hazen Boston University.
GLAST Large Area Telescope:
Modeling event building architecture for the triggerless data acquisition system for PANDA experiment at the HESR facility at FAIR/GSI Krzysztof Korcyl.
I&T&C Organization Chart
GLAST Large Area Telescope:
TELL1 A common data acquisition board for LHCb
GLAST Large Area Telescope:
Hall A Compton Electron detector overview
Electrical Ground Support Equipment Verification Test Support
Integration, Test, and Calibration
GLAST Large Area Telescope:
GLAST Large Area Telescope
Digital Sub-System Bob Goeke.
GLAST Large Area Telescope:
Integration and Test Organization Chart
Introduction and Overview
Integration & Test Instrument Operations Coordination
TELL1 A common data acquisition board for LHCb
Presentation transcript:

GLAST June 8, 2000, P. Roger Williamson, BFP - 1 Balloon Flight Planning Roger Williamson June 8, 2000

GLAST June 8, 2000, P. Roger Williamson, BFP - 2 SCOPE DAQ subsystem –Detector Interfaces –Balloon Command, Data, and Electrical –Instrument Power Supplies Onboard Software Ground Support Equipment

GLAST June 8, 2000, P. Roger Williamson, BFP - 3 Requirements There is a Balloon Flight Objectives document in preparation that will serve as a source document. Derived Requirements –L1T Trigger at the environmental rate –Event deadtime of less than 100 microsec –Save data from all events –Send subsample of events to ground realtime

GLAST June 8, 2000, P. Roger Williamson, BFP - 4 Assumptions Balloon flight 1st week of Sept, 2001 Use modified BTEM tower Downlink not sufficient for full bandwidth data Power from +28V batteries Command uplink and primary +28 V power supplied by gondola

GLAST June 8, 2000, P. Roger Williamson, BFP - 5 Overview Onboard data storage requirement –1 kHz L1T average rate –1 kbyte/event(TBR) average event –10 hour total record time –1e3*1e3*36e3 = 36 Gbytes (need more) CPU processing load risk mitigation –FIFO buffers permit full rate bursts if CPU readout/processing cannot keep up –TKR FIFO ~ 200 events 200 ms burst

GLAST June 8, 2000, P. Roger Williamson, BFP - 6 Existing Hardware Tracker Interface –No modification required Calorimeter Interface –No change to readout interface –Dead time hold off input to L1T --- or --- –Use 100 microsecond hold off timer in CAL readout FPGA ACD Interface –No modification required –Front end noise fix required - Modification –HSK readout software - Modification –Additional joint testing

GLAST June 8, 2000, P. Roger Williamson, BFP - 7 Existing Hardware Global Level 1 Trigger –OR FPGA in ACD TEM –Requires added functionality for balloon flight Dead time hold off - New Global live time counter - New Global L1T counter reset scheme - New Possibly other science requirements for trigger logic

GLAST June 8, 2000, P. Roger Williamson, BFP - 8 Existing Hardware GPS Receiver –Battery powered –Provide RS-232 Interface –Revise Software to include timestamp and position IDB --- Ethernet CISCO switch Cable Harness –L1T cables –Ethernet IDB cables

GLAST June 8, 2000, P. Roger Williamson, BFP - 9 Existing Hardware SIU TEM –GPS sync with L1TCNT –Ethernet to BIU for command and downlink TM –Fiberoptic link via CISCO switch for GSE

GLAST June 8, 2000, P. Roger Williamson, BFP - 10 New Hardware Merge Detector TEMS into 1 VME chassis –Use 21 slot VME chassis –One Master CPU for data acquisition and control –VME backplane BLT to speed up data acquisition to higher L1T rate –Omit Ethernet packet building for most data packets –Send 1(TBD) event per second to downlink (depends on bandwidth and event size) –Accepts change to modified data flow hardware on daughter card or VME –Add HSK and LRS (rate counter) readouts –Add Onboard Storage using VME chassis

GLAST June 8, 2000, P. Roger Williamson, BFP - 11 New Hardware Balloon Interface Unit (BIU) simulates SC –TEM type VME Chassis –Ethernet to TEM (instead of 1553B) –New interface to balloon system for commands –BIU provides downlink telemetry subsystem –Provided by NRL with downlink telemetry system

GLAST June 8, 2000, P. Roger Williamson, BFP - 12 New Hardware Power switching/control –Controls power to each TEM from +28VDC –Balloon Discrete Commands 21 Slot VME chassis Power Supplies –110VAC changed to +28VDC Detector power supplies mounted and controlled via VME boards –On/off control via commands –Detector bias voltage setting via commands –Monitor currents and voltages, in/out

GLAST June 8, 2000, P. Roger Williamson, BFP - 13 New Hardware Packaging Cable Harness – Existing + New Mechanical - New

GLAST June 8, 2000, P. Roger Williamson, BFP - 14 Housekeeping Temperature monitors –ACD - 16 (TBR) places –CAL - 16 (TBR) places –TKR (Existing) 16 places –BIU – 16 (TBR) places Power Supply Voltages - 14 (TBR) places Power Supply Currents - 14 (TBR) places Strain gauges (TBR)

GLAST June 8, 2000, P. Roger Williamson, BFP - 15 Ground Support Equipment Record and display variable length packets Displays – –Existing event real-time display –Housekeeping monitors –Status and software monitors –Additional histograms –Science displays –Command web page - Modified Balloon interface simulator - –+28 V power –Command –Data –Ethernet fiber optic link to CISCO switch

GLAST June 8, 2000, P. Roger Williamson, BFP - 16 Software Post Beam Test Cleanroom Software – Ran at rates above 1 kHz for FIFO readouts with direct read from FIFO –Detector control and test suites from Beam Test (TBR) –Modify for BLT readout of FIFOs to provide higher speeds and more CPU margin for other tasks –Variable length event packets

GLAST June 8, 2000, P. Roger Williamson, BFP - 17 Options Hardware Data Transfer (to 128 Mbyte DRAM) –New data push technique to move event data to DRAM CAL Zero Suppression –FPGA hardware version TKR FPGA Zero Suppression –Hardware suppression of no-hit headers TKR Rate Counters –TREQ rates for each layer (TBR) Poisson Rate Generator for L1T (commandable rate)

GLAST June 8, 2000, P. Roger Williamson, BFP - 18 Schedule (June 2001 Flight) July, 2000Balloon Flight Requirements Review July, 2000ACD Testing at GSFC July, 2000PDR Hardware & Software July, 2000TKR TEM at Stanford, 2 weeks test/devel Sept, 2000CDR Oct, 2000Power System Fab, pkg, HSK,... Oct, 2000GSE Release 1 Oct, 2000All TEMS at Stanford for software development Nov, 2000ACD I/F Test at GSFC Dec, 2000TKR I/F Test at UCSC Jan, 2000CAL I/F Test at NRL Mar, 2001Gondola I/F Test Mar, 2001GSE Release 2 Apr 1-15, 2001Hardware Integration at SLAC Apr 16-May 16, weeks Software Integration at SLAC May 17 Ship to GSFC May 192 week Gondola Integration at GSFC June 14 week software test at GSFC Aug 1Ship to launch site

GLAST June 8, 2000, P. Roger Williamson, BFP - 19 ISSUES L1T maximum trigger rate MC data simulation –Data Flow Requirement –Onboard Storage –Trigger design Downlink bandwidth Schedule & staffing Plan for modified data flow and trigger system

GLAST June 8, 2000, P. Roger Williamson, BFP - 20 ISSUES ACD HSK readout debug ACD noise Power supply plan Onboard software plan

GLAST June 8, 2000, P. Roger Williamson, BFP - 21 WBS