1 Cal Poly CMS SA Project Common Management Systems (CMS) SA Modification Governance Overview January 4, 2005.

Slides:



Advertisements
Similar presentations
CSU Public Private Partnerships
Advertisements

Common Management System – CMS “CMS Status & Future” 1 Financial Officers Association April 2004 “CMS Status & Future” William Griffith Vice President,
Test Long and Prosper presented by Janet Gray July 26, 2005.
Collaborative Stage Version An Update From Martin Madera CS Program Administrator.
Project Insight Organization Design Meeting #1 Success Metrics and Design Criteria November 23, 2005.
Information Risk Management in the Audit Chapter 9 Presented by Dee Dee Owens, Senior Manager KPMG LLP KPMG LLP.
1 / 24 CS 425/625 Software Engineering Software Evolution Based on Chapter 21 of the textbook [SE-8] Ian Sommerville, Software Engineering, 8 th Ed., Addison-Wesley,
Graduate System for Management of Admissions, Alumni & Records Tracking (Grad SMAART) January 8, 2007 Office of Graduate Studies.
Implementation Audit and Control Background Internal Audit Role Go-Live Criteria Audit Approach - Systems Audit Approach - People Summary Agenda.
SE 555 Software Requirements & Specification Requirements Management.
COMR Process and Policy Overview. 1.Process and policy has evolved over time. 2.Yes, it is confusing…but not by design. 3.Please don’t shoot the messenger!
Report Distribution Report Distribution in PeopleTools 8.4 Doug Ostler & Eric Knapp 7264.
Software Configuration Management (SCM)
Planning the Implementation of Campus Community. Rules for Campus Community  Keep an open mind  Understand other’s processes  Realize the impact on.
Student Information system
Introduction to Systems Analysis and Design
Configuration Management
Application Security Management Functional Project Manager (s) ERP Project Director ERP Campus Executive University & Campus Administration Security Policy.
Software Engineering Tutorial. Tutorial objectives  Direct application for the SW engineering activities.  Discuss real software development case studies.
Campus Solutions Academic Advisement December 2010.
Wesleyan Financial System Kickoff Meeting for WFS Implementation June 10, 2008.
RUP Requirements RUP Artifacts and Deliverables
CS 4310: Software Engineering Lecture 3 Requirements and Design.
Chapter 15 Database Administration and Security
INFORMATION SYSTEM APPLICATIONS System Development Life Cycle.
SYS364 Evaluating Alternatives. Objectives of the Systems Analysis Phase determine, analyze, organize and document the requirements of a new information.
RUP Fundamentals - Instructor Notes
Security Management System for Department Sponsors Session #20244 March 15, 2006 Alliance 2006 Conference Nashville, Tennessee.
#watitis2014 watitisconf.uwaterloo.ca Tracey Sinclair and Joanne Voisin December 3, 2014.
RUP Implementation and Testing
Project Tracking. Questions... Why should we track a project that is underway? What aspects of a project need tracking?
Chapter 6 : Software Metrics
CS 425/625 Software Engineering Legacy Systems
IT Governance Purpose: Information technology is a catalyst for productivity, creativity and community that enhances learning opportunities in an environment.
Configuration Management (CM)
1 Local Readiness Team Lead Kick-Off Meeting May 16, 2007.
The Client/Server Database Environment Ployphan Sornsuwit KPRU Ref.
Center for Planning and Information Technology T HE C ATHOLIC U NIVERSITY of A MERICA Establishing Login Interrupts in the PeopleSoft Enterprise Portal.
©Ian Sommerville 2004 Software Engineering. Chapter 21Slide 1 Chapter 21 Software Evolution.
Some Cool Tools for the PeopleSoft Support Team Session #20649 March 13, 2006 Alliance 2006 Conference Nashville, Tennessee.
Lecture 14 Maintaining the System and Managing Software Change SFDV Principles of Information Systems.
Configuration Management and Change Control Change is inevitable! So it has to be planned for and managed.
Integrated Monitoring Dashboard SEAP/BTIS/DB&I/Mar Integrated Monitoring Dashboard An Innovative Monitoring Approach Proposal by BTIS/DB&I.
Expanding HRMS while Minimizing Impact on Future Upgrades Session 1001 Jennifer Gehrt, Human Resources John Letourneau, Information Systems Kansas State.
Software Maintenance Speaker: Jerry Gao Ph.D. San Jose State University URL: Sept., 2001.
Connecting with Computer Science2 Objectives Learn how software engineering is used to create applications Learn some of the different software engineering.
Cal Poly’s Campus Fee Advisory Committee An Overview: University Fees & the Campus Fee Advisory Committee (“CFAC”)
Course Evaluations Session 397 Monday, 03/17/2003 1:15 to 2:15 p.m. HEUG 2003 Conference - Dallas.
OPS SQL 7 – What’s New  Compliance Engine  Action History  Multi-Sheet Spread Reports  And much more  Free for users on support!
Lab 301 Populating Template Data from a Third Party Data Source Justin Pava, Software Release Manager Andrew Schoonmaker, Software QA Engineer.
IST 210 Database Design Process IST 210, Section 1 Todd S. Bacastow January 2004.
CASE Tools and their Effect on Software Quality
What’s New in SPEED APPS 2.3 ? Business Excellence Application Services.
Prepared by: Session ID: Using PeopleSoft Test Framework During Development Matt Shimel Principal Applications Systems Analyst/Developer University of.
People Inc. from P&A Software
Sample Fit-Gap Kick-off
Figure 9.8 User Evaluation Form
GeorgiaFIRST Financials V9 Upgrade Web Conference November 21, 2014
Chapter 11: Software Configuration Management
Chapter 16 Database Administration and Security
Project Intake, Evaluation and Decision Making Process Summary & Recommendations September 15, 2017.
The Client/Server Database Environment
EIN 6133 Enterprise Engineering
WIMS 7 – What’s New Action History Multi-Sheet Spread Reports
CLINICAL INFORMATION SYSTEM
National Environmental Policy Act (NEPA)
People Inc. from P&A Software
Sarbanes-Oxley Act (404) An IT Viewpoint
Chapter 11: Software Configuration Management
George Mason University
Presentation transcript:

1 Cal Poly CMS SA Project Common Management Systems (CMS) SA Modification Governance Overview January 4, 2005

2 Cal Poly CMS SA Project Purpose of Meeting u Informational Meeting u Provide overview of CMS Central & Cal Poly SA Modification Governance processes u Explain affect of CMS & Cal Poly processes to SA Technical Team

3 Cal Poly CMS SA Project Agenda  CMS Central Modification Governance  Evolution of Campus Allowed Modifications u COMR Impact Analysis u Cal Poly SA Modification Governance Process Flowchart

4 Cal Poly CMS SA Project CMS Central Modification Governance Purpose and Scope u CMS implementation approach Campuses and the Chancellor’s Office collaborate on functionality through common fit-gap/prototyping effort Results provide CSU CMS baseline Campuses will not make local changes to the application code Campuses can request campus specific changes through the central Software Operations Support and Services (SOSS) group Campus based reports & interfaces are not considered modifications to SOSS owned tables, so are not under the Modification Governance.

5 Cal Poly CMS SA Project CMS Modification Decision Criteria Delivered PeopleSoft functionality (i.e. “Vanilla”) is assumed Proposed modification to PeopleSoft software as delivered will be considered based on: 1. Modification would impact a campus’ ability to go-live or operate in production environment. 2. Modification is a result of collective bargaining, trustee requirements, executive direction, or State and/or Federal regulations. 3. Modification would result in significant reduction in manual effort. 4. Modification provides a CMS project feature that would maintain a significant service level. 5. Without modification, additional staff would be necessary to perform the business process.

6 Cal Poly CMS SA Project Evolution of Campus Allowed Modifications 1. Campus reports & interfaces allowed 2. Campus specific workflow added, including specific triggers in PeopleCode that affect workflow functionality 3. PeopleSoft delivered self-service functionality, including campus “look and feel” modifications & campus specific warning and error messages 4. PeopleCode modifications to replace campus 3 rd party products or augment Core/Non-Core functionality

7 Cal Poly CMS SA Project Campus Modifiable and Non Modifiable Objects  Modifiable  Crystal/nVision/SQR (Reporting tools)  PeopleTools Objects  Records/views  PeopleCode (cloned)  Pages (cloned)  Components (new)  Application Engine programs (cloned or new)  Workflow objects  Non Modifiable  COBOL programs & stored statements  Database-level triggers  CMS Baseline or PeopleSoft Baseline PeopleTools Objects

8 Cal Poly CMS SA Project CMS Central COMR Impact Analysis Campus-specific modifications will be subject to a CMS Central impact analysis review process if they meet the following criteria: Concurrent Users  Transactions that involve 100 or more users, including campus cloning of existing self service. Production Application Sizing  Permanent changes that will impact DB size by creating tables creating indexes materialized views Any development that exceeds 1% of a campus' total database size, regardless of type. NOTE: Run control records and temporary tables developed in compliance with CMS guidelines are exempt from impact analysis review unless they exceed the 1% threshold.

9 Cal Poly CMS SA Project CMS Central COMR Impact Analysis - Campus PD Review Process

10 Cal Poly CMS SA Project CMS Central COMR Impact Analysis - Committee Review Procedure

11 Cal Poly CMS SA Project Sample COMR Impact Analysis Forms u Cal Poly – SQR Financial Report and set flags process. u Northridge – Bolt On Screen to provide class schedule info

12 Cal Poly CMS SA Project