© C.Hicks, University of Newcastle IGLS06/1 Laissez-faire or full control? An evaluation of various control strategies for companies that produce complex.

Slides:



Advertisements
Similar presentations
Introduction to Transportation Systems. PART II: FREIGHT TRANSPORTATION.
Advertisements

IGLS/1 © P. Pongcharoen Using Genetic Algorithms for Scheduling the Production of Capital Goods P. Pongcharoen, C. Hicks, P.M. Braiden, A.V. Metcalfe,
© C.Hicks, University of Newcastle IGLS04/1 Stochastic simulation of dispatching rules in the capital goods industry Dr Christian Hicks University of Newcastle.
ICMR/1 © Colin Herron & Chris Hicks University of Newcastle upon Tyne Improving the competitiveness of the North East companies by implementing lean manufacturing.
Due Date Planning for Complex Product Systems with Uncertain Processing Times By: Dongping Song Supervisor: Dr. C.Hicks and Dr. C.F.Earl Dept. of MMM Eng.
© C.Hicks, University of Newcastle HIC288/1 A TOOL FOR OPTIMISING FACILITIES DESIGN FOR CAPITAL GOODS COMPANIES Christian Hicks
© C.Hicks, University of Newcastle IGLS02/1 A Genetic Algorithm Tool for Designing Manufacturing Facilities in the Capital Goods Industry Dr Christian.
ENBIS/1 © Chris Hicks University of Newcastle upon Tyne An analysis of the use of the Beta distribution for planning large complex projects Chris Hicks,
Rescheduling Manufacturing Systems: a framework of strategies, policies, and methods Vieira, Herrmann and Lin.
Genetic Algorithms for multiple resource constraints Production Scheduling with multiple levels of product structure By : Pupong Pongcharoen (Ph.D. Research.
MODELING AND ANALYSIS OF MANUFACTURING SYSTEMS Session 6 SCHEDULING E
© C.Hicks, University of Newcastle KNOW99/1 Knowledge Management in Capital Goods Companies Dr. Christian Hicks University of Newcastle upon Tyne.
© C.Hicks, University of Newcastle Manufacturing Systems Research Chris Hicks.
© C.Hicks, University of Newcastle HICKS/1 Research Overview Christian Hicks.
© C.Hicks / P.M.Braiden EDIN/1 Knowledge Management: An Engineering Perspective Dr. Christian Hicks Professor Paul Braiden University of Newcastle upon.
Stochastic Models in Planning Complex Engineer-To-Order Products
PG Conf /1 © F.A. Hossen, M&S Engineering University of Newcastle upon Tyne Managing Project Planning Risk Fouzi A. Hossen.
ENBIS/1 © Chris Hicks University of Newcastle upon Tyne Stochastic simulation studies of dispatching rules for production scheduling in the capital goods.
© C.Hicks, University of Newcastle HICKS/1 Research Overview Christian Hicks
Due Date Planning for Complex Product Systems with Uncertain Processing Times By: D.P. Song, C.Hicks and C.F.Earl Dept. of MMM Eng. Univ. of Newcastle.
An overview of design and operational issues of kanban systems M. S. AKTÜRK and F. ERHUN Presented by: Y. Levent KOÇAĞA.
© C.Hicks, University of Newcastle C.F.Earl, Open University IDMME02/1 A Genetic Algorithm Tool for Designing Manufacturing Facilities in the Capital Goods.
Planning operation start times for the manufacture of capital products with uncertain processing times and resource constraints D.P. Song, Dr. C.Hicks.
© P. Pongcharoen ISA/1 Applying Designed Experiments to Optimise the Performance of Genetic Algorithms for Scheduling Capital Products P. Pongcharoen,
© C.Hicks, University of Newcastle ASAC06/1 Establishing the relationship between mean tardiness and the number of resources under close control for companies.
22–1. 22–2 Chapter Twenty-Two Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Due Date Planning for Complex Product Systems with Uncertain Processing Times By: Dongping Song Supervisors: Dr. C.Hicks & Dr. C.F.Earl Department of MMM.
© C.Hicks, University of Newcastle WAR/1 Knowledge Management in Capital Goods Companies Dr. Christian Hicks University of Newcastle upon Tyne.
© C.Hicks, University of Newcastle IGLS04/1 Determining optimum Genetic Algorithm parameters for designing manufacturing facilities in the capital goods.
Using Simulated Annealing and Evolution Strategy scheduling capital products with complex product structure By: Dongping SONG Supervisors: Dr. Chris Hicks.
Flexible Manufacturing Systems Introduction to FMS/FAS.
McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., Cost Allocation and Performance Measurement Chapter 21 Modified from Publisher Provided.
Simulation of a Generic Cellular Manufacturing System Using Rockwell Arena Simulation Software This document provides a generic simulation model of a cellular.
Scheduling. Scheduling: The allocation of resources over time to accomplish specific tasks. Demand scheduling: A type of scheduling whereby customers.
. INTERNATIONAL SCIENTIFIC AND TECHNICAL CONFERENCE AGRICULTURAL MACHINERY VARNA, JUNE 2015 A SURVEY CONCERNING THE REQUIREMENTS OF COMPETENCIES.
© P. Pongcharoen CCSI/1 Scheduling Complex Products using Genetic Algorithms with Alternative Fitness Functions P. Pongcharoen, C. Hicks, P.M. Braiden.
Production Planning and control – ME 1009 Unit 1 Introduction.
“MACHINES, TECHNOLOGIES, MATERIALS” VARNA, BULGARIA
“MACHINES, TECHNOLOGIES, MATERIALS” 17– BOROVETS, BULGARIA
CHAPTER 8 Operations Scheduling
International Scientific Conference „Conserving Soils and Water BURGAS, BULGARIA A SURVEY.
"MATHMODEL 2017" , BOROVETS, BULGARIA
Phd Student Eng. Valentin Lupu1, Prof. Phd. Eng
“MACHINES, TECHNOLOGIES, MATERIALS” VARNA, BULGARIA
PRODUCTION SYSTEMS Terminology Concept: Production: Performance:
INTERNATIONAL SCIENTIFIC AND TECHNICAL CONFERENCE
"MATHMODEL 2018" , BOROVETS, BULGARIA
DECEMBER 2018, BOROVETS, BULGARIA
„NONEQUILIBRIUM PHASE TRANSFORMATIONS”
Flexible Manufacturing Systems
AND TECHNICAL CONFERENCE
“AGRICULTURAL MACHINERY”
Variability 8/24/04 Paul A. Jensen
Dept. of MMME, University of Newcastle upon Tyne
Phd Student Eng. Valentin Lupu1, Prof. Phd. Eng
Dept. of MMME, University of Newcastle upon Tyne
HIGH TECHNOLOGIES. BUSINESS. SOCIETY winter resort „BOROVETS”
– Burgas – Bulgaria XXVII INTERNATIONAL SCIENTIFIC CONFERENCE ON TRANSPORT, ROADBUILDING, AGRICULTURAL, HOISTING & HAULING AND MILITARY TECHNICS.
70 Years Department and Specialty "Commodity Science“
8th International Academic Conference The Economy in a Changing World: National, Regional and Global Aspects (EWT – 2017) A SURVEY CONCERNING THE REQUIREMENTS.
Agenda (i) Analyze economic viability and judge necessity of jig – fixture for specific production by machining (ii) Plan for designing a fixture or jig.
International Scientific Conference „Conserving Soils and Water BURGAS, BULGARIA A SURVEY.
“Power Transmissions 2019” JUNE VARNA, BULGARIA
“MACHINES, TECHNOLOGIES, MATERIALS” VARNA, BULGARIA
Dept. of MMME, University of Newcastle upon Tyne
“MACHINES, TECHNOLOGIES, MATERIALS” 13– BOROVETS, BULGARIA
SUMMER SESSION “INDUSTRY 4.0, JULY 2019, VARNA, BULGARIA
XII INTERNATIONAL CONFERENCE FOR YOUNG RESEARCHERS
IV INTERNATIONA TECHNICAL CONGRESS
SUMMER SESSION “INDUSTRY 4.0, JULY 2018, VARNA, BULGARIA
Presentation transcript:

© C.Hicks, University of Newcastle IGLS06/1 Laissez-faire or full control? An evaluation of various control strategies for companies that produce complex products with stochastic processing times Christian Hicks, Fouzi Hossen and Art Pongcharoen

© C.Hicks, University of Newcastle IGLS06/2 Dispatching rule literature Majority of work has focused upon small problems. Work has focused upon the production of components, mostly in job shops. Minimum set-up, machining and transfer times have been neglected. Deterministic process times have been assumed. The same rules have been used for all resources

© C.Hicks, University of Newcastle IGLS06/3 Capital goods companies Design, manufacture and construction of large products such as turbine generators, cranes and boilers. Complex product structures with many levels of assembly. Highly customised and produced in low volume on an engineer-to-order basis.

© C.Hicks, University of Newcastle IGLS06/4 Typical product

© C.Hicks, University of Newcastle IGLS06/5

© C.Hicks, University of Newcastle IGLS06/6 Case Study 52 Machine tools Three product families competing for resource (main product, spares and subcontract) Complex product structures

© C.Hicks, University of Newcastle IGLS06/7

Load on machines in rank order

© C.Hicks, University of Newcastle IGLS06/10 Experimental design

© C.Hicks, University of Newcastle IGLS06/11

© C.Hicks, University of Newcastle IGLS06/12

© C.Hicks, University of Newcastle IGLS06/13 Tardiness (T) = completion time – due time (for completion time > due time) Tardiness (T) = 0 (for completion time  due time) Performance Metric

© C.Hicks, University of Newcastle IGLS06/14 Figure 3 Mean tardiness (days) for products vs. number of resources under close control (LSF dispatching rule)

© C.Hicks, University of Newcastle IGLS06/15 Figure 4 Mean tardiness (days) for products vs. number of resources under close control (LSF dispatching rule

© C.Hicks, University of Newcastle IGLS06/16 Figure 5 Minimum mean product tardiness vs. number of resources under close control.

© C.Hicks, University of Newcastle IGLS06/17 Figure 6 Minimum mean component tardiness vs. number of resources under close control

© C.Hicks, University of Newcastle IGLS06/18 Conclusions Most dispatching rule research has focused upon job shops and has neglected other operational factors such as minimum setup, machining and transfer times and the data update period. Dispatching rule research has mainly investigated deterministic situations. This research has included complex assemblies, stochastic processing times and a multi-product environment. Mean tardiness for products reduces considerably when most highly utilised resources are placed under close control.

© C.Hicks, University of Newcastle IGLS06/19 Conclusions Most of the benefits arise with <= 10% of resources under close control. Mean tardiness for components relatively insensitive to number of resources under close control “Best” dispatching rule varies according to level and product family. Previous research has shown that the relative performance of dispatching rules is insensitive to the particular distribution used. This research shows that the relative performance of the dispatching rules is also quite insensitive to the number of resources under close control.