John Arthur Photon October 18, 2005 LCLS Photon Systems Status John Arthur SLAC.

Slides:



Advertisements
Similar presentations
LCLS Transition to Science DOE Status Review of the LUSI MIE Project LCLS NEH ARR John Arthur LCLS Experimental Facilities Division August 11, 2009 Welcome.
Advertisements

John Arthur X-ray October 12, 2004 X-Ray Detector Program Status John Arthur.
Hal Tompkins FEE/FEL June 16, FEE/FEL Commissioning Overview By Hal Tompkins Photon Beam Systems Deputy.
1 John Arthur 1 FEH Status CXI Review June 3, 2009 FEH Layout, Status John Arthur – LCLS Expt’l Facilities Div June 3, 2009.
Richard M. Bionta XTOD July 19-21, 2005 UCRL-PRES-xxxxxx X Ray Diagnostics LCLS FAC Meeting Oct. 27, 2005.
Stefan Moeller XES FAC Review – April 16, 2006 X-Ray Endstation Systems (XES) Status Stefan Moeller.
John N. Galayda LCLS Facility Advisory November 11, LCLS Update November 11, 2008 Construction Status LCLS Instruments.
John Arthur X-ray November 11, 2008 SLAC National Accelerator Laboratory 1 X-ray Overview LCLS Directorate structure.
Richard M. Bionta XTOD October 12, 2004 UCRL-PRES-XXXXX X Ray Transport, Optics, and Diagnostics, Overview Facility Advisory Committee.
John N. Galayda LCLS FAC 20 April Linac Coherent Light Source Overview and Charge Facility Advisory Committee John.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project The Instrument Readiness Review Process John Arthur LCLS Experimental Facilities Division.
Stefan Moeller Revised XES April 7, 2005 Revised X-Ray Endstation Scope Stefan Moeller.
Mark Reichanadter LCLS FAC October 29-31, 2007 Report to the LCLS Facilities Advisory Committee Project Management Project.
John Arthur X-ray June 17, X-ray Overview XTOD current status XES current status Schedule to first experiments.
Diffraction studies of stimulated dynamics (pump-probe) Coherent-scattering studies of nanoscale fluctuations Atomic, molecular and optical science High.
1 Stefan Moeller 1 AMO Instrument Schedule ARR AMO Instrument Schedule Stefan Moeller – XES Manager June 30, 2009.
Donn H. McMahon XTOD Breakout: XTOD FY07 October 12, 2006 UCRL-PRES XTOD FY07 Plan LCLS FAC Review October 12, 2006.
John Arthur Photon Systems April 16, LCLS Photon Systems Status Technical status and accomplishments Response to.
X Ray Transport / Optics / Diagnostics Overview Richard M. Bionta Facility Advisory Committee Meeting April 29, 2004 Richard M. Bionta Facility Advisory.
John Arthur Photon October 29, Photon Systems Update FAC recommendations Current status New plan for Photon Systems.
John Arthur Photon October 27, Photon Systems Overview John Arthur SLAC.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project NEH status and XFD operations Hal Tompkins, John Arthur LCLS Experimental Facilities.
John Arthur X-Ray Optics October 12, 2004 X-Ray Prototype Optics Specifications John Arthur.
John N. Galayda LCLS FAC October Linac Coherent Light Source Overview and Charge Facility Advisory Committee.
John Arthur Photon April 20, 2006 Photon Systems Update John Arthur SLAC Photon Systems Manager.
John N. Galayda LCLS Facility Advisory 29 October 2007 Linac Coherent Light Source Overview 29 October 2007  Project.
John Arthur X-Ray Endstation April 29, 2004 X-Ray Endstations Overview John Arthur.
Richard M. Bionta X-Ray Transport, Diagnostic, & Commissioning September 22, 2004 UCRL-PRES Two Problems... LCLS Diagnostics.
Stefan Moeller X-Ray October 27, X-Ray Detectors Stefan Moeller.
Steve Lewis XTOD 4-8 April, 2005 UCRL-PRES LCLS Week 4-8 April, 2005 Steve Lewis X-ray Transport, Optics, and Diagnostics:
Richard M. Bionta XTOD Layout and Diagnostic October 12-13, 2004 UCRL-PRES-XXXXX XTOD Layout and Diagnostic Systems Facility Advisory.
John Arthur PIXEL Project April 7, 2005 Status of the Proposed PIXEL Project John Arthur SSRL/SLAC Photon Instrumentation.
John Arthur X-ray April 20, 2006 X-Ray Beamline and Experiment Layout John Arthur LCLS Photon Systems Manager.
John Arthur Photon October 12, Photon Systems Update John Arthur SLAC 1.
Hal Tompkins Photon October 30, LCLS Photon Systems Installation and Commissioning Presentation to Facility Advisory.
Richard M. Bionta XTOD Beam and Detector October 12-13, 2004 UCRL-PRES-XXXXX XTOD Beam and Detector Simulations Facility Advisory.
R. M. Bionta SLAC November 14, 2005 UCRL-PRES-XXXXXX LCLS Beam-Based Undulator K Measurements Workshop Use of FEL Off-Axis Zone Plate.
Stefan Moeller Exp. Areas Conventional October 24, Experimental Areas - Conventional Facilities Stefan Moeller.
Stefan Moeller XES Plan for FAC Review - April 20, 2006 X-Ray Endstation Systems (XES) Status and Plan for FY06 Stefan Moeller.
John Arthur Photon Systems April 7, 2005 Photon Systems Overview John Arthur.
David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 1 Undulator Complex Status LCLS Introduction.
Joshua Stein LCLS Undulator 20 Feb 06 LCLS Undulator Controls ANL LCLS All-Hands Meeting February 20, 2006 Josh Stein Argonne.
John D. Bozek AMO Commissioning & Nov , 2008 SLAC National Accelerator Laboratory AMO Installation & Commissioning.
1 BROOKHAVEN SCIENCE ASSOCIATES Redundancy Requirements for Critical Devices R. Casey August 8, 2007.
David Saenz Readiness for Oct 12, 2006 # Meeting of the LCLS Facilities Advisory Committee LCLS Conventional Facilities.
John N. Galayda LCLS Accelerator Readiness December 2, LCLS Overview December 2, 2008 Project Construction Status.
John N. Galayda DESY October 8, LCLS Commissioning in 2008 J. Galayda, for The LCLS Construction/Commissioning.
LUSI Coordination with LCLS
Experimental Facilities Planning
DOE Review May, 2005 Steve Lewis
LCLS Ultrafast Science Instruments
Proposed Offset Mirror System
John N. Galayda – Director of LCLS Construction March 30, 2009
Installation of Photon Beam Transport to FEH
X-Ray Endstation Design & Management/Commissioning
X-Ray Transport, Optics, and Diagnostics WBS Alan J
X-Ray Endstations Update
LUSI Controls and Data Systems W.B.S. 1.6
Optics John Arthur, SLAC & William W. Craig, LLNL April 24, 2002
John Arthur – LCLS Experimental Operations
NEH - Status Stefan Moeller.
The Transition to User Operations
Coherent X-ray Imaging Instrument WBS 1.3
X-ray Correlation Spectroscopy Instrument
DOE Review 7-9 February, 2006 Steve Lewis
X-Ray Endstation Design & Management/Commissioning
LCLS Lehman Review February 7-9, 2005
X-Ray Endstation Systems (XES) 2006 Schedule
LCLS Photon Systems Overview
LUSI Controls and Data Systems W.B.S. 1.6
Presentation transcript:

John Arthur Photon October 18, 2005 LCLS Photon Systems Status John Arthur SLAC

John Arthur Photon October 18, 2005 LCLS Photon Systems Includes LCLS x-ray and laser groups X-ray Transport, Optics and Diagnostics (XTOD) managed by LLNL (Richard Bionta) X-ray Endstation Systems (XES) managed by SLAC (Stefan Moeller) LCLS Laser Systems managed by SLAC (Bill White)

John Arthur Photon October 18, 2005 XTOD Scope Transport the x-ray beam, in vacuum, to all the experimental stations Condition the x-ray beam, with attenuators and apertures Analyze the x-ray beam, with sophisticated diagnostics

John Arthur Photon October 18, 2005 XES Scope The X-Ray Endstation Systems group provides the infrastructure required for experimenters to make best scientific use of the LCLS radiation safely

John Arthur Photon October 18, 2005 Laser Group Scope The Laser group coordinates laser design and acquisition throughout the LCLS. Lasers will be used in the electron gun and x-ray experimental areas, and also possibly for accelerator diagnostics and alignment.

John Arthur Photon October 18, 2005 LCLS Designs are maturing FEE instrumentation at concept review stage Conventional facilities at Title 2 stage

John Arthur Photon October 18, m GAS ATTEN SOLID ATTEN STOP COLLIM Mirrors STOP FEE 7 ft Fe 3 ft concrete 4 ft Fe

John Arthur Photon October 18, 2005 NEH Flipper Mirrors Hutch 1 9.5x10m Hutch 2 Hutch 3

John Arthur Photon October 18, ft tunnel 46ft tunnel 212ft 28x33ft hutch 29x33ft hutch 36x33ft hutch 10ft Fire door 10ft 6ft Toilets Entrance 19ft tunnel (450 ft long) 15x25ft control cabin FEH

John Arthur Photon October 18, 2005 Building up the X-Ray Systems XTOD group has about 20 people now XES has 1 person and 2 openings LUSI has 5 openings now, more soon 2 other x-ray related hires at LCLS, 1 opening

John Arthur Photon October 18, 2005 LCLS CE costs are expected to be high May will need to cut some scope Need to prioritize possible cuts

John Arthur Photon October 18, 2005 Possible Scope Reductions Eliminate flipper mirrors (~$1M) Reduce length of x-ray transport tunnel by 10% (20m, ~$0.5M)

John Arthur Photon October 18, ft tunnel 30ft transition 46ft tunnel 212ft 28x33ft hutch 29x33ft hutch 36x33ft hutch Entrance 14ft tunnel Reduced scope FEH design hutch extended single beamline

John Arthur Photon October 18, 2005 Effects of reductions No flipper mirrors: beamline shared in FEH Shorter tunnel: side beams closer to each other by 10% (1.8m vs 2m)

John Arthur Photon October 18, 2005 Summary Major staff increase ongoing Experimental needs coming into focus Need to consider possible scope cuts to save $