Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 14 September, 2009.

Slides:



Advertisements
Similar presentations
MOM Report October 9- Now Linda R. Coney UCR. October 15 th Running Target Target Beamline Magnets Beamline Magnets Detectors? Detectors? Could not turn.
Advertisements

1 MICE Beamline: Plans for initial commissioning. Kevin Tilley, 16 th November. - 75days until commissioning Target, detectors, particle production Upstream.
January 14, 2004 TJR - - UPDATED 1/25/04 1 MICE Beamline Analysis Using g4beamline Including Jan 25 Updates for Kevin’s JAN04 Beamline Design Tom Roberts.
Target Operations A summary of Target Operation to Date Paul Hodgson The University of Sheffield.
K. Long, 18 April, 2015 Beam-line status — red sky at night?
Summary of MICE 4/4/2008 shift during the ISIS machine-physics period Goals for 04 Apr08 MICE shift: 1. Radiation survey in MICE Hall with target operating,
ISIS Related Issues for MICE Adam Dobbs Proton Accelerator Development Meeting, RAL 24 th March /03/20111A. Dobbs.
MICE Beam Loss vs Particle Rate Adam Dobbs, ISIS Meeting, 18 th December 2009.
MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
MICE Particle Rate and ISIS Beam Loss Adam Dobbs, Target – ISIS Meeting, 17 th September 2010.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 27, 2009.
MICO Alain Blondel 17 March MICO Alain Blondel 17 March MICE target test-run March 2008 Friday 14/03/2008 6:00-> 18:00 Saturday 15/03/2008.
Paul drumm, mutac jan MICE Beamline Optics Design Kevin Tilley, RAL, 12th June MICE Needs Generic Solution Pion Injection & Decay Section (a) Inputs.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICE Video Conference April 22, 2010.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 21 September, 2009.
Linda R. Coney – 24th September 2009 MOM Update End of Sept Run Linda R. Coney 05 October, 2009.
MICO 22 nd February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - User Run Plans.
11-FEB-2004 TJR1 MICE Beamline TOF Analysis Tom Roberts Illinois Institute of Techology February 11, 2004.
MICO Meeting, 1 st March 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - March User Runs Plans - Suggestions.
Luminosity Monitor Commissioning MICE Collaboration Meeting March 2010 Paul Soler, David Forrest Danielle MacLennan.
M.apollonioMICE Funding Agency Committee Meeting - RAL 18/4/ M. Apollonio – MICE Operations Manager University of Oxford MICE beam line commissioning.
K.Walaron Fermilab, Batavia, Chicago 12/6/ Simulation and performance of beamline K.Walaron T.J. Roberts.
Target Test Report Given permission for a maximum of 5000 actuations. Performed 3679 actuations, 3654 with the gate valve open. Ran target at 0.4 Hz to.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 12, 2010.
MICO 9th Aug 2010J.S. GraulichSlide 1 MOM report o Last Week o Run Plan for this Week o Machine Physics Jean-Sebastien Graulich, Geneva.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
MOM Report. Shield Wall – Gone Before During After 2.
Luminosity Monitors MICE Video Conference 7 May 2009 Paul Soler.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 26, 2010.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICO Meeting June 7, 2010.
A Tale of Two Targets … 7 th September 2009 Chris Booth The University of Sheffield.
1June 1 st 2009MICE CM24 - RAL1 MICE Beamline m. apollonio.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 19, 2010.
MOM - M.ApollonioAccel. R&D/Physics and IADR - RAL - 19/3/ Summary of MICE operations – 14/15 March 2008 AIMS - establish MICE beamline in ISIS synchrotron.
Commissioning needs: K.Long. Routine: LN2 bottle: –Needs to be sited in MICE Hall or outside vault so that routine checks of contents can be made.
MICO 15 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - User Run Plans.
CMPB Alain Blondel 14 April STATUS OF MICE.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICO Meeting May 24, 2010.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 7 September, 2009.
MICE Video meeting Alain Blondel 7 December MICE -- what running strategy? reflections on steps I and II.
MICE VC Aug '10J.S. GraulichSlide 1 MOM report o Achievements Since CM27 o Daily Operations o Run Plans o Summary Jean-Sebastien Graulich, Geneva.
MICE Beamline Commissioning Linda R. Coney NFMCC Meeting 16 January 2010.
MICE Operations Manager Report Linda Coney University of California, Riverside UKNF Meeting June 8, 2010.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
MICE Step 1: First Emittance Results with Particle Physics Detectors Linda R. Coney EuCARD Meeting – 10 May 2011.
M. apollonio MICE Beamline summary. - Beamline parallel session (June 1 st ): - envisaged goals (Alain) - assess readiness of the line magnet status (Ken)
Plans (& ideas) for beamline commissioning The beamline Magnet field tests Source characterisation Optics (& model) commissioning K. Tilley CM18, 14/06/07.
Particle Production in the MICE Beamline IPAC10 Linda Coney, UC Riverside, Adam Dobbs, Imperial College London, Yordan Karadzhov, Sofia University The.
Linda R. Coney – 24th September 2009 MOM Update Linda R. Coney 24 September, 2009.
RAL Muon Beam Line Properties. ISIS 70 MeV H- injection Ring accelerates up to 800 MeV in about 10 ms 50 Hz cycle - Dual Harmonic System ~ 2 x 1.5 MHz;
MICE TARGET OPERATION C. Booth, P. Hodgson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 – The MICE Experiment2 - The.
Alain Blondel MICE VC 12 March 2009 Brief MICE news 1. Decay solenoid: operations will restart in early July. Criteria for acceptance have been specified.
MICE Run Plan Sept/Oct 2009 m. apollonio – IC MACHINE PHYSICS USERs RUN NO SHIFT A B C D E.
March 18, 2008 TJRMICE Beamline Status1 MICE Beamline Status (March 18, 2008) Tom Roberts Muons, Inc. Illinois Institute of Technology.
Studies on pion/muon capture at MOMENT Nikos Vassilopoulos IHEP, CAS August 11, 2015.
COMET. μ-e conversion search from muonic aluminium J-PARC pulsed proton beam to produce pulsed muon beam Forbidden in the Standard Model  clue to the.
Running plan Step I.1 Basic radiation levels. I.1.1 ISIS running with beam elements on, target off, beam stop shut. Establish permanent MICE monitoring.
Luminosity Monitor Design MICE Collaboration Meeting 31 May 2009 Paul Soler.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICE Video Conference May 20, 2010.
1 Updated Run Plans. K.Tilley, MICO, 07/02/08 - pre-commissioning - Target, - beamline functionality - detectors, particle production - decay solenoid.
M. apollonio 7/7/2010CM27 - RAL11 Beam-Line Analysis …
MICE, Uni-Geneva and the transnational access to MICE (MICE-TNA)
Doubling the Target Insertion Rate P J Smith for MICE VC 163.
Target insertion matching and standard cell optics optimization
MICE Beamline Status m. apollonio 17 December 2009 MICE VC
MICE Operations Scenario Run 1
Luminosity Monitor Status
A BeamLine update m. apollonio 7/7/2010 CM27 - RAL 1.
MOM Report + RUN PLAN m. apollonio – Imperial College
Presentation transcript:

Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 14 September, 2009

Linda R. Coney – 14 Sept 2009 Outline  Target  Taking Data/Operations  Documentation  Electrical  Continued Run Plan  …..

Linda R. Coney – 14 Sept 2009 Target Operations & Data Taking  Ran 8 hours Tues, 10 hours Thurs, & 14 hours Sat  Used 23,500 target pulses  Target operation studies u Searching for ideal timing wrt ISIS cycle u Searching for ideal depth into beam u Studies with ISIS running at 50 Hz u Took data with modified cap bank voltages  Beam loss vs Particle Rate study u Fix target timing and adjust dip depth u Take data at 100 mV, 200 mV, 300 mV, 400 mV, 500 mV beam losses  Pion beam at 333 MeV/c  Positron beam at 150 MeV/c  Pion to Muon beam at 252 MeV/c

Linda R. Coney – 14 Sept 2009 Target Operations  Beamloss (in Sector 7) for the entire run  Note that there does seem to be two distinct peaks although Paul has only fitted a single gaussian.

Linda R. Coney – 14 Sept 2009 Target Operations  Shows that the previous double peak effect is not due to the target, remember that the target usually shows a characteristic double peak structure due to the inhererent 0.15mm position resoulution and the exact pulse by pulse capture position. The theory is that this is a real effect due to the ISIS beam wandering about in a cyclic (and repeatable) pattern. There was no change in the delay setting over this period.

Linda R. Coney – 14 Sept 2009 Target Operations  The plot shows the Beam Centre Distance of the target over time for the entire Saturday shift. The double peak effect can be clearly seen but the important point is that the target was absolutely stable over this prolonged run period. Also the higher points at the beginning and end of the run are when the target was lowered and raised respectively.

Linda R. Coney – 14 Sept 2009 Recent Data  Run 972 Sept pion beam 333 MeV/c with 500mV losses  protons

Linda R. Coney – 14 Sept 2009 Recent Data  Run977_Sept102009_piBeam333MeVc_400pulses

Linda R. Coney – 14 Sept 2009 Recent Data  Run1006_Sept122009_pimuBeam MeV/c 120 pulses

Linda R. Coney – 14 Sept 2009 Operations  Updated documentation about 90% done u Still need a few updates  Some trips of beamline magnets  DAQ having some trouble with new fADCs u Possible fix this weekend  “invalid” alarms constantly going off on alarm handler extremely taxing/annoying  Electrical

Linda R. Coney – 14 Sept 2009 Next  Run Plan for this week: u Commission Decay Solenoid s Set beamline to pion optics s Scan through decay solenoid current settings s Calibrate B field by comparing to simulation s Look at beam profile in FNAL detectors and TOF0, TOF1 u Optimize Upstream Beamline s Marco and Chris Rogers s Optimize Q1-Q3 s Move quads to maximize rates in detectors