21.12.04TRD Status meeting IKFClemens Adler TRD ROC Status -Dubna -Bukarest -GSI -Frankfurt -Heidelberg.

Slides:



Advertisements
Similar presentations
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Advertisements

Homogeneity of Small Chambers T4, T6, T7, T8 and Gas Gain Measurements of Frascati and Roma Chambers Emmanuel Angulo (CSU Fresno) Weekly Meeting ATLAS.
TRD Production at GSI Joerg Hehner TRD Collaboration Meeting Bucharest
TRD Collaboration Meeting GSI Clemens Adler TRD Chamber production issues General Issues, Planning and Hd Status.
TRD Status meeting Münster Clemens Adler TRD ROC Status The long and winding road to production start.
DIAMOND ACTIVITIES DESY Zeuthen Wolfgang Lange. MOTIVATION and PEOPLE: Calorimetry in an environment with high radiation doses (TESLA beam cal) Beam diagnostics.
TRD ROC Status Clemens Adler TRD Status Meeting TRD ROC Status.
TRD status meeting GSI Clemens Adler TRD (Pre-)Production Status New Results/Experiences Problematic issues Production Plans Timescale.
Hd Status and Planning TRD Chamber Construction Meeting Clemens Adler.
/06/2015 Christian J. Schmidt GSI Production of ALICE TRDs Progress and Quality Development Alice TRD Chamber Production Meeting Darmstadt Feb.
Test Results Of Gain Uniformity Measurements Heidelberg Chamber maximum deviation [%] L1C0#001 33,45 L1C0#002 25,94 L1C0#017 24,41 L2C0#001 16,76 L2C0#002.
TRD Status Meeting Münster Clemens Adler TRD ROC Status Status Meeting Münster
TRD Collaboration meeting GSIClemens Adler First TRD Production Chambers Production Tests Results Documentation.
Chamber production status 75% of production (of 1st half of detector) reached in May Currently ~80% is produced 100% (1st half) expected in October. End.
TRD Status meetingClemens Adler TRD Production Status -Material -Tooling -Timescale.
TRD Status meeting GSI Clemens Adler TRD ROC Status.
8.7.04TRD Status meeting HdClemens Adler TRD ROC Status.
TRD Collaboration meeting GSIClemens Adler First Production Chambers Production/tests/results.
Technical Forum Alice week Clemens Adler Transition Radiation Detector Status Participating Institutions: Athens University, NIPNE Bukarest, JINR.
TRD Status meeting HeidelbergClemens Adler Chamber production Production status/ Material status.
TRD Status meeting GSIClemens Adler Chamber production Production status/ Material status.
TRD Status meeting Alice week HdClemens Adler TRD Chamber Status News: New leak rate measurements Production is imminent Some material arrived Soldering.
Production NIPNE Completely finished and tested: L1C sent to GSI L2C sent to GSI L2C sent to GSI L3C Total: 36 =
MM mechanical prototype Work progress at CERN MicroMegas General Meeting, CERN, 5-6 November
Engineering Design Review for TRD-Readout Chamber
MUID Status: General Detector Health In addition to two disabled HV chains there are four other chains (out of a total of 600) that are largely or totally.
MM mechanical prototype Work progress at CERN MMM Rome, 15/07/20131.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
LHCb MUON MPWC STATUS OF TOOLING, SITES, PRODUCTION AND MATERIAL PROCUREMENT.
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.
19 Oct NIKHEF update 3 lines of attack: 1)Heating (Mod 30) 3 days at 45 C, 4 days at 48 C Q1: Change in geometry, gas tightness, gain? Q2: Effect.
Status of CERN M1R2 production LHCb Muon meeting sept.061Thomas Schneider -Beginning of 2006 two visits to Erbicol because of several reasons: -Material.
Malte HildebrandtDC Status Report, Dear MEG Committee,PSI, April 14 th 2009 this is the first report concerning the drift chamber status as.
First results of an aging test of a full scale MWPC prototype for the LHCb muon system Workshop on “Aging Phenomena in Gaseous Detectors”, October 2-5.
T.Schneider/LHCb Muon EDR
Abe Seiden December 2003 SCT Week S USA SCT Barrel Module Assembly SCT Week CERN December 2003 Presented by Abe Seiden U.C. Santa Cruz.
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
27 Octobre 2005IEEE2005 Nuclear Science Symposium, Puerto Rico, Niels Tuning 1/18 A High-Efficiency and High- Resolution Straw Tube Tracker for the LHCb.
MWPC sandwich panels C.Forti INFN-LNF / LHCb-MUON EDR CERN 16 th April sandwich panels typologies of cathodes the mould the production procedure.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
Lab tests of Thick GEMs (THGEM) Lab tests of Thick GEMs (THGEM) S. Dalla Torre, Elena Rocco, L. Ropelewski, F. Tessarotto May – August 2007.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
Status of GEM T2 assembly Outline Status of the GEM components Summary Tests TOTEM Collaboration meeting CERN / Risto Orava for Kari Kurvinen.
11/05/2000Wire Chamber Working Group Visit to Fermilab Participants: –Giulio Auriemma, Thomas Schneider, Burkhard Schmidt General Remarks: –Visit was organized.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
JINR-BMBF Workshop, Dubna Clemens Adler PI Heidelberg ALICE TRD Transition Radiation Detector Overview and Status Clemens Adler Physikalisches.
Bernhard Schmidt DESY - HH PRC open session, October 30, 2002 HERA-B.
9 March 2005OT Meeting - LHCb week - Production and QA, Niels Tuning 1/19 Outer Tracker Module Production at NIKHEF Produced 60 modules  Production Progress.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
22/04/20011Wire Chamber Working Group Status on O-ring closed Prototype Foam panels from Frascati (size: 279mm*341mm) No pad structure 4 independent gas.
Muon Meeting April 2004JsG Status of Chambers Production at CERN Jean-Sebastien Graulich o Open Questions from the PRR O-ring Aging, Aging tests, Storage.
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
TB Peter Glässel, Heidelberg1 TPC Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
Chamber Quality Control Before the construction several checks are performed on:  Panels (cathode and pad PCB)  GEM foil Tests on assembled detector.
TRD Workshop RomaniaClemens Adler Heidelberg ROC Status Material procurement, Chamber Status TRD workshop Cheile Grandistei, Romania,
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
Lab Activities: Chamber Baking & Mixing Station Flushing Claudio Curtis Dan PPS meeting 22 June, 2011.
Results on a Large Area triple-GEM Detector at LNF 5 th RD51 Collaboration Meeting Freiburg, 25 May 2010 D. Domenici - LNF.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
T2 GEM Production in Helsinki Kari Kurvinen TOTEM T2 EDR meeting Radiation Detector Laboratory of Helsinki Institute of Physics (HIP) and Department.
Acceptance test at Duke
Status of straw production straw module assembling
Long irradiation at the side
“MUON” Collaboration meeting
Ageing workshop - N.Tuning
(On Behalf of CMS Muon Group)
Presentation transcript:

TRD Status meeting IKFClemens Adler TRD ROC Status -Dubna -Bukarest -GSI -Frankfurt -Heidelberg

TRD Status meeting IKFClemens Adler Production Status

TRD Status meeting IKFClemens Adler Dubna Status 6 Chambers tested with X-ray (2 with Sr90): gain uniformity <+-14%gain uniformity <+-14% 2 Chambers tested in air (HV test) 2 Chambers to be tested 4 Frames ready for wire transfer Panels are not glued: Question where to glue the chambers?

TRD Status meeting IKFClemens Adler Bukarest Status 2 Chambers finished 2 Chambers planned to be finished until Christmas.

TRD Status meeting IKFClemens Adler Bukarest Status cont. Fe55 measurement: –Ar CO2 (70/30), anode: 1650V, drift: -800V –source trough gas connector hole

TRD Status meeting IKFClemens Adler Bukarest Status cont. Accident: At anode:1300V, drift: at 1100V: Strange noise, power supplies tripped. -> Open chamber: 1 anode wire broken in the middle, little black craters in Radiator surface. Also noticed: anode wire looked like it was not covered with gold everywhere. Still unclear what happend, investigation is ongoing.

TRD Status meeting IKFClemens Adler Heidelberg Accident ? L1C1 Chamber was tested before gluing: everything well. After gluing: large current (several uA) starting at 1100 V. Independent of anode segment 1/3 of current is flowing to cathode, rest is missing ?!? Plan: test in Air, look for missing current

TRD Status meeting IKFClemens Adler Problem 1: Anode wire Dubna: Gold dust on Meteor (not noticed with other wire) Heidelberg: Gold dust on Meteor. Bukarest: Au-coating is removed from large portions of the wire. Question to forum without notice so far. What to do???

TRD Status meeting IKFClemens Adler Problem 2: HV cable HTC HV cable is drawing currents (surface leak currents across isolator) Now seen at all Production sites. Manufacturer: wire OK (up to 12 kV) ->low current requirements very special?!? Plan: Buy new cable: 300 m from CERN stock OK to 6 kV. Distribute new cable to production sites

TRD Status meeting IKFClemens Adler Problem 3: Anode Breaking Sanding of wire ledge edges improves situation After ~5 Chambers w/o problems (Hd) 1 broken Anode wire. Oleg suggests: Problem: additional curing step: 1 day delay Solution: Hd will try Araldite 2012: curing time ~10 minutes

TRD Status meeting IKFClemens Adler Problem 4: Unconnected Pads 8 Panels (L1C1): no unconnected pads Most recently tested: 1 cable with 3 unconnected pads Wolfgang started a little test run to quantify effect of bending signal wires.

TRD Status meeting IKFClemens Adler Problem 5: Winding machine Heidelberg: control unstable: was fixed in Oktober, so far OK Bukarest: tension Problems, fixed.

TRD Status meeting IKFClemens Adler Wire thickness Wire thickness goes into determination of wire tension. Definition of lower tension limit necessary (cathode: 80cN, anode: 40 cN) due to wire sag. Proposal: Since wire thickness seems to vary (75-82um), put wire thickness for the roll numbers on the www (GSI?!?).

TRD Status meeting IKFClemens Adler Material Status: L-Profiles 48% of 60% TRD finished

TRD Status meeting IKFClemens Adler Material Status: Front Profiles 38% of 60% TRD finished Will increase production by involving other workshop

TRD Status meeting IKFClemens Adler Further issues Better coordinate Material needs/deliveries –Material Database requirement Improve communication between Labs: –GSI Forum is started to be accepted, but usage must be intensified. Please make sure you are „Subscribed“. General Production plan: –Still large uncertainties in production rate, due to ever continuing problems. –Will try to provide something until Collaboration meeting