1 Acquisition Camera: Troubleshooting Help Vern STAHLBERGER Institute for Astronomy August 21-2008 Comments and Purpose: 1)Images not centered in Acquisition.

Slides:



Advertisements
Similar presentations
ZTF Mechanical Walkthrough Matthew Hoff ZTF Technical Meeting 1.
Advertisements

Suspension Systems - 1 Topics covered in this presentation:
OFD 1 Oli Durney LBTI Optical Engineer Steward Observatory University of Arizona NIC Aperture, Pupil, and Filter Wheel Positions Rev. 3.3 November 3, 2011.
OFD 1 Oli Durney LBTI Optical Engineer Steward Observatory University of Arizona NIC Aperture, Pupil, and Filter Wheel Positions Rev. 2.3 September 19,
Optimum Round Pool Instructions. Prepare the pool site Remove all the grass on a surface 2’ wider than the size of the pool Level the ground.
Purpose Body Making module is designed for bending the laminated foil film in the shape of a tube, for welding the side seam and for cutting bodies with.
LWIR FPA Mirror Image Problem & Recovery April 11, 2011 Roy W. Esplin Dave McLain.
1 HICIAO-Assembly-Procedure Prepared for HICIAO CDR Author: Vern Stahlberger Institute for Astronomy Date:
Honda 450 Installation Manual.
Click on this image to open the full PDF document.
Polaris Predator Installation Manual. STEP 1: Remove ATV Rear Tires Remove ATV right side wheel hub Remove ATV stock swing arm (2 bolts) KTRACKS.
ICRA Panel System Installation Instructions
860 21/2”-10”. Modification Overview  Production of the 2½” – 10 sizes began in  Lead free version (LF860) was introduced in Parts do not.
WINDOWS An opening especially in the wall of a building for admission of light and air that is usually closed by casements or sashes containing transparent.
Mu2e Production Target Remote Handling By: Michael R. Campbell, Fermi National Accelerator Laboratory, , System Layout Basic.
1 Effect of missing/loose screws 03/01/04. 2 Moment Load about E-W Axis-1 S N 20 lbs +/-5% Result of 20 lbs load:.005 inch flexure at point of application.
1 Acquisition Camera: Task-List to check Flexure Date first created: 02/05/04 Date last modified:02/06/04.
1 AC-Flexure Test Updated Moment Load about E-W Axis-1 S N 20 lbs +/-5% Result of 20 lbs load:.005 inch flexure at point of application.
RESULTANTS.
RESULTANTS.
Media Journal Describe your personal experience using a video camera.
Integration and Alignment of Optical Subsystem Roy W. Esplin Dave McLain.
SAM PDR1 SAM LGS Mechanical Design A. Montane, A. Tokovinin, H. Ochoa SAM LGS Preliminary Design Review September 2007, La Serena.
Mission to Mars 4 Wheel Rover Build Instructions April 2008.
Installation. Indoor Unit Installation Typical Installation.
SOL-GEL COATING FACILITY CONCEPTUAL DESIGN REVIEW October 19, 2005.
Mars Reconnaissance Orbiter1:48 scale READ ALL THE INSTRUCTIONS AND INSPECT THE PARTS SHEETS FIRST. Score fold lines and cut out the parts. High Gain Antenna.
Optical Manufacturing Solutions 1 FOLLOW THE DIRECTIONS BELOW AFTER INSTALLING A NEW CUTTER BODY WITH POLISHING WHEELS INTO THE 7E TYPE MACHINES. IT IS.
Overview The FMP Image Station combines a choice of a Trinocular or Monocular Microscope with high resolution digital video camera and one or two Micro.
MARS 2 Design Review-Optomechanical Review 07 Nov 2002 GLW1 MARS 2 Mechanical Design Review.
A PRESENTATION on “ SUSPENSION SYSTEM ”
Blade Tuner assembly Instruction for tuner assembly on a cryomodule May
OFD 1 Oli Durney LBTI Optical Engineer Steward Observatory University of Arizona NIC Aperture, Pupil, and Filter Wheel Positions Rev. 2.1 April 29, 2011.
Delta II 7925H - 10L Baseline workup Launch Vehicle TheirsOurs Delta II 7925H Launch Vehicle 10L Composite Fairing 10L Stretch Composite Payload Fairing.
White Table Tops Text Books & Work Books. Mechanical Engineering Linking in Technical Objects Guiding Controls.
Oct 17, 2001SALT PFIS Preliminary Design Review1 Southern African Large Telescope Prime Focus Imaging Spectrograph Mechanical Mechanism Design Michael.
LF866 2½”-10”. Product Overview  Production of the 2½” – 10” sizes began in  The LF866 utilizes a Type 2 bypass (Model LF619 single check).
Mount structure concept FM1 & FM2 Mount structure design 1) Aluminum structure. 2) Structure design for holding Newport mirror mount because of its compact.
Microscopy.
23rd ANNUAL BATTERY CAR RACE FEB. 27,2015 BY: Homer Johnson & Sammy Smith (Ingomar Middle School) (Picture of car here) Car Name: THE ROAD RUNNER.
POM-checkup 04/21/04 For further Documentation please see drawings AOK-1xx And Assembly Drawing AOK and-2.
4D-200, 4D-700 2½”- 10”. Modification Overview  Production began in 2003 and was discontinued in  The 4D-700 (RPDA) uses a Type-II bypass (single.
½”-10”. Modification Overview  Production of the series began in 1989 and is current.
Mission to Mars 4 Wheel Rover Build Instructions April 2008.
IOPtiMate™ OT-135P2 Technical Training – Part I System Description, Installation & Operation IOP (07)
Camera Motion System Requirement Design Details FEA.
STEP 1: ASSEMBLE ANGLE PLATES
Assembly Instructions:
Compound Microscopes and Lab Techniques
Barrel EMC assembling (EDMS DOCUMENT NUMBER /1)
Easycliner (Motorized Version) Assembly Instruction
Heavy Duty Safety Switch Replacement Instructions for
STEP 1: ASSEMBLE ANGLE PLATES
Initial Design for Canoe Balls and Grooves on Wrist
Hydraulic Arm Assembly Instructions
(Preliminary) WIYN 0.9 Meter Collimation Procedure
3000CIV 21/2”-10”.
Lesson 14 Key Concepts and Notes
Please see slide 2 for the caption of this figure.
4D-100, 4D-600 2½”- 10”.
709DCDA 2½ ”-10”.
Reader Swap out Guide.
2000CIV 2½ ”-10”.
Step 1:Disassemble battery case
Step 1:Disassemble battery case
Step 1:Disassemble battery case
709 2½ ”-10”.
Step 1:Disassemble battery case
Suspension Systems - 1 Topics covered in this presentation:
Goodman Acquisition Camera
Presentation transcript:

1 Acquisition Camera: Troubleshooting Help Vern STAHLBERGER Institute for Astronomy August Comments and Purpose: 1)Images not centered in Acquisition TV Camera (problems, especially with CSHELL 2)Create this Document to help with the troubleshooting

2 Assembly Picture-1 AO Spool AOK-301 George Mount AOK-400 (orange colored) Support Structure AOK-300 Top Plate Cover: AOK-317

3 Assembly Picture-2 X-Y Stage (yellow colored)

4 Assembly Picture-3 AO Spool (partially transparent)

5 Assembly Picture-4 (Top View) Covers for Acquisition Box removed! POM (Pick Off Mirror; Movable via X-Y Stage Animatics for X-Y Stage

6 System1 Optics Ray Trace

7 System2 Optics Ray Trace

8 Filter Wheel AOE-100 Fold Mount AOK-205 (Movable) Lens Cell AOK-271 Collins CCD Camera & Focus Mechanism Apogee CCD Camera & Focus Mechanism Fold Mount AOK-205 (Fixed)

9 Gimbal Mount Pickoff Mirror: AOK-100 Some parts partially transparent AO Spool

10 AO Spool omitted

11 POM Mechanism without Support Structure Mechanism Description: The Pickoff Mirror Support is a 2-Axis Gimbal Mount Mechanism whose axis are at right angles to each other and are co-planar to the front surface of the Mirror. The nominal angle of the POM is 45 degrees to the incoming beam CCW and CW Rotation is limited to about 2 degrees (stops) in both axis Compression Springs are used to preload Gimbal Frames onto Actuator ends (eliminating backlash) Rotation is accomplished remotely using Newport Actuators (blue cylinders) Note: This mechanism is difficult to service while installed inside the AO Spool. Remove everything up to, but not including X-Y Stage. (see next slides) Checklist: a)Do Actuator ends remain in contact with the Gimbal Frames at all times? Will require energizing the Actuators to verify b)Are the Actuators themselves held firmly in place (check screws that hold Actuator Bodies) c)Check Flex Pivots for breakage; check screws that secures Flex Pivots 8x) d)Check Mirror Clips 3x (do they hold the POM firmly in place?) For a parts list of Gimbal Mount Pickoff: AOK-100 go to… Acquisition-Camera-AOK/Assy-AOK/ ab Actuator a-axis Actuator b-axis

12 George Mount: AOK-400 X-Y Stage Optics Base Plate: AOK-312 Relevant Screws Qty=4 There are 4x Socket Head Cap Screws (SHCS) used to bolt the Optics Base Plate to the X-Y Stage All of them are accessible by removing the Top Plate Cover AOK-317 (see next slides). Side walls do NOT have to be removed! Note: To access these screws disassembly is NOT required to what is shown in this picture!!

13 Access to 2x SHCS

14 Access to 1x SHCS May need to move motor if not visible

15 Access to 1x SHCS