ARIES-CS Study Page 1 Discussion Of Compact Stellarator Reactor Requirements L. Waganer The Boeing Company 8-10 January 2003 ARIES Meeting at UCSD.

Slides:



Advertisements
Similar presentations
Update on Modeling of Power and Particle Control for ARIES- Compact Stellarator A.Grossman UCSD 11/04/2004 Acknowledgements: P.Mioduszewski(ORNL) J. Lyon.
Advertisements

ARIES Meeting, UCSD L. M. Waganer, June 2006 Maintenance and Building Conceptual Approach L. M. Waganer The Boeing Company ARIES Meeting University.
ARIES Project Meeting, L. M. Waganer, Jan 2009 Page 1 Debrief of Dr. Whelan’s TRL and Aerospace & R&D Risk Management Debrief of Dr. Whelan’s TRL.
Compact Stellarator Configuration Development Planning Hutch Neilson Princeton Plasma Physics Laboratory ARIES Team Meeting October 4, 2002.
January 8-10, 2003/ARR 1 Plan for Engineering Study of ARIES-CS Presented by A. R. Raffray University of California, San Diego ARIES Meeting UCSD San.
April 27-28, 2006/ARR 1 Finalizing ARIES-CS Power Core Engineering Presented by A. René Raffray University of California, San Diego ARIES Meeting UW, Madison.
June 14-15, 2006/ARR 1 ARIES-CS Power Core Engineering: Updating Power Flow, Blanket and Divertor Parameters for New Reference Case (R = 7.75 m, P fusion.
ARIES-CS Page 1 Low Cost Fabrication Approach for ARIES-CS Coil Structure L. Waganer The Boeing Company November 2005 ARIES Meeting at UCSD, San.
ARIES Review, PPPL L. M. Waganer, 4-5 Oct 2006 Summary of Low Cost Fabrication of Integrated Coil Structure L. M. Waganer With Support from Kevin Slattery.
ARIES-General Page 1 Summary of Findings of Lehman Committee to Assess ITER Costing L. Waganer The Boeing Company 8-10 January 2003 ARIES Meeting at UCSD.
Page 1 of 5 Thermal power management TWG direction and plans ARIES Project Meeting 13 December 2007 M. S. Tillack, A. R. Raffray.
ARIES-Compact Stellarator Study 1 CS Power Core Materials and Fabrication Unit Cost Estimation ARIES-CS Project Meeting June 2004 University of Wisconsin,
ARIES Town Meeting On Physics of Compact Stellarators as Power Plants Farrokh Najmabadi and the ARIES Team September 15-16, 2005 Princeton Plasma Physics.
ARIES Meeting, UCSD L. M. Waganer, June 2006 An Approach for Low Cost Fabrication of the Coil Structure L. M. Waganer With Support from Kevin Slattery.
US Fusion Power Plant Studies: Current Projects & Planned Activities Farrokh Najmabadi IEA ESE Executive Committee Meeting November 14, 2001 Tsukuba, Japan.
ARIES-CS Page 1 Summary of ARIES Power Core Unit Costs L. Waganer The Boeing Company 4-5 September 2004 ARIES Meeting at UCSD.
ARIES -AT Study L.M. Waganer ARIES 3/20-21/00 Page1 ARIES-AT Vacuum Vessel Design Approach L. M. Waganer The Boeing Company 20 March 2000 UCSD San Diego,
Tips on Writing a Lab Report Please refer to the “Lab Report Reference Sheet” to help you as well.
Get insights. Get educated. Get inspired. Enter the title of the presentation here. Name of the speaker. COMPANY. XX/09/2014. Get insights. Get educated.
How to do Virtual Store with SharePoint Designer 2007.
Enter the Title of Your Presentation Lead Inventors Name Other Inventors Name Purpose: Enter why you are coming to patent committee (initial filing, PCT,
Solving by Elimination Example 1: STEP 2: Look for opposite terms. STEP 1: Write both equations in Standard Form to line up like variables. STEP 5: Solve.
ARIES Meeting, UCSD L. M. Waganer, June 2006 Maintainability and Availability Analyses L. M. Waganer The Boeing Company ARIES Meeting University.
ARIES Project Meeting, L. M. Waganer, Dec 2007 Page 1 Summary of Plant Operations TWG L. Waganer December 2007 ARIES Project Meeting at GT.
Civil War Unit Texas History Team Name:. Instructions for completing research questions Each team member will claim the number of slides needed to complete.
Source Page US:official&tbm=isch&tbnid=Mli6kxZ3HfiCRM:&imgrefurl=
Путешествуй со мной и узнаешь, где я сегодня побывал.
Facebook. You need a facebook account before you set up a facebook page.
Mobile app development India. Mobile app development company.
<Company name> <Sales team name>
Description of Thin Liquid Wall Protection w/Porous Walls
Solving Systems Of Equations Algebraically
“Partner Name” x “Your Company Name”
Team 1: 32 responses Team 2: 55 responses Team 3: 29 responses
Slides for Trainers The following images are available for training purposes. They are the copyrighted material of the DIBELS Data System, Center on Teaching.
Page 1. Page 2 Page 3 Page 4 Page 5 Page 6 Page 7.
What type of spacecraft is this? What might be its purpose?
Please highlight one choice only
Transparency A.
مديريت تيم های مجازی مبانی و مفاهیم اولیه.
CASSINI-UVIS TEAM WEBSITE
CASSINI-UVIS TEAM WEBSITE
LEAD Meeting January 14th , 2015.
Time to test your knowledge!
Reactor Building Concept Assessment
Summer of Gratitude Summer 2018 Name:.
Algebra 2 Ch.3 Notes Page 15 P Solving Systems Algebraically.
7.3 Notes.
Understanding the Problem
What type of spacecraft is this? What might be its purpose?
PRUnit B064: Creative use of ICT
Page Link Form Other: please explain
Loading… Please Wait $ $ $100 $100 $100 $100 $100 $200 $200 $200 $200 $300 $300 $300 $300 $300 $400 $400 $400 $400 $400 $500 $500 $500 $500 $500.
In The Kite Runner, kites symbolize the evolving relationship between Amir and Hassan. What might serve as a symbol of the relationship between you and.
2016 BUSINESS TEMPLATE CORPORATION NAME HERE 资源管理吧.
Company Name Your Logo Here Company Phone
YOUR LOGO HERE COMPANY COMPANY PHONE
Company Name Company Phone Your Logo Here
Tips on Writing a Lab Report
BUYOUTS INSIDER Q HIGHLIGHTS
COMPANY PHONE YOUR LOGO HERE COMPANY
COMPANY NAME YOUR LOGO HERE COMPANY PHONE
YOUR LOGO HERE COMPANY COMPANY PHONE
Please request to your IT team. Check for right side servers access.
Inventory of supplies: Inventory of supplies:
Preparing for the future …
COMPANY NAME COMPANY PHONE YOUR LOGO HERE
YOUR COMPANY NAME | COMPANY PHONE YOUR COMPANY NAME | COMPANY PHONE
YOUR LOGO HERE COMPANY COMPANY PHONE
CASSINI-UVIS TEAM WEBSITE
Presentation transcript:

ARIES-CS Study Page 1 Discussion Of Compact Stellarator Reactor Requirements L. Waganer The Boeing Company 8-10 January 2003 ARIES Meeting at UCSD

ARIES-CS Study Page 2 Purpose of Requirements List This list of requirements highlights those items that might be beneficial for examination by the ARIES Team As the design evolves, this list will become more complete Please examine the following list to quantify the requirement, add a new one, or eliminate an existing one

ARIES-CS Study Page 3 Tentative List of Requirements

ARIES-CS Study Page 4 Tentative List of Requirements

ARIES-CS Study Page 5 Tentative List of Requirements

ARIES-CS Study Page 6 Tentative List of Requirements