City of Leesburg AMI Project Paul Kalv, Leesburg Electric Director Doug Handley, Utility Consulting Services Advanced Metering Infrastructure – AMI.

Slides:



Advertisements
Similar presentations
Laser Direct Manufacturing of Nuclear Power Components
Advertisements

Smart Grid Communication System (SGCS) Jeff Nichols Sr. Director IT Infrastructure San Diego Gas & Electric 1.
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
0 © 2011 Silver Spring Networks. All rights reserved. Building the Smart Grid.
WinDS-H2 Model and Analysis Walter Short, Nate Blair, Donna Heimiller, Keith Parks National Renewable Energy Laboratory May 27, 2005 Project AN4 This presentation.
Concentrating Solar Deployment Systems (CSDS) A New Model for Estimating U.S. Concentrating Solar Power Market Potential Nate Blair, Walter Short, Mark.
NECPUC Symposium Central Maine Power: Transforming the Customer Experience with AMI June 11, 2013.
Vendor Briefing May 26, 2006 AMI Overview & Communications TCM.
11 Rate Design to Complement AMI Implementation in Danville, Virginia Presentation by Denise Sandlin Support Services Director Danville, VA APPA 2009 Business.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable.
Our utility paradigm is changing… will YOU be ready? Paul Kalv Smart Grid Research Consortium Electric Director October 20, 2011 Chief Smart Grid Systems.
Smart Grid Primer Funded by the U.S. Department of Energy, Office of Electricity Delivery and Energy Reliability Energy Bar Association – Primer for Lawyers.
Central Vermont Public Service Recognized by Forbes as One of the Most Trustworthy Companies in America Introduction to CVPS Smart Grid Project:
North American Synchrophasor Project Initiative NASPI Work Group Meeting Oct , 2011 Joseph H. Schaefer Florida Power & Light.
Keeping your Automated Devices Alive
Energy Efficiency and Arizona’s Energy Future Jeff Schlegel Southwest Energy Efficiency Project (SWEEP) April
SmartMeter Program Overview Jana Corey Director, Energy Information Network Pacific Gas & Electric Company.
Advanced Metering Infrastructure
Smart Meter. 2 Seattle City Light Vision Vision To set the standard and deliver the best customer service experience of any utility in the nation. Mission.
1 Department of Water and Power City of Los Angeles Automatic Meter Infrastructure Program Mariko Marianes and John Yu.
1 SmartMeter™ Delivering Customer Benefits Jana Corey Director, Policy Planning Integrated Demand-side Management Pacific Gas and Electric Company.
Getting ready for Advanced Metering Infrastructure Paper by : Rajesh Nimare Presented by : Prashant Sharma.
Consideration of Public Utilities Regulatory Policies Act (PURPA) Standards A Public Hearing- October 22, 2007.
HARVEST GROUP Smart Grid Harvest Power Technologies 30 th Aug 2014.
1 © Air Products and Chemicals, Inc Options for Production and Delivery of Low-Cost Hydrogen Edward C. Heydorn Business Development Manager Hydrogen.
Future of Smart Metering Kansas Renewable Energy & Energy Efficiency Conference September 26, 2007.
© 2011 New York Independent System Operator, Inc. All Rights Reserved. Smart Grid Investment Grant Project Update Jim McNierney Enterprise Architect New.
Incentive Services Presented by D.E. Baetsen & Associates, LLC.
1 Jon Sudduth Project Engineer, Intelligent Grid Deployment SWEDE April 26, 2011.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable.
1 Floyd Galvan October 12-13, 2011.
Smart Metering and the Smart Grid How does it work and what can it do? Will Chaney 1Energy Awareness Week, 3-8 May 2010.
Seattle City Light – AMI Business Case Results
PRES-ET A011 Lynn J. Harkey SDIT Project Engineer Uranium Processing Facility Project B&W Y-12 August 26, 2009 The Process, Methods and Tool Used.
OG&E’s Smart Study TOGETHER: Impact Assessment of Enabling Technologies and Dynamic Pricing Rates Katie Chiccarelli, Craig Williamson January 24, 2012.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable.
32nd USAEE/IAEE North American Conference July 30, 2013 Analysis of the Impacts of Shale Gas Supply under a CO2 Tax Scenario NETL Pittsburgh PA and Morgantown.
Advanced Metering Implementation Team Update Christine Wright Public Utility Commission of Texas October 2008.
“Demand Response: Completing the Link Between Wholesale and Retail Pricing” Paul Crumrine Director, Regulatory Strategies & Services Institute for Regulatory.
2011 Broward Municipal Green Initiatives Survey Results GHG Mitigation Energy 2/3 of Broward’s reporting municipalities have implemented incentives or.
Gas-Electric System Interface Study OPSI Annual Meeting October 8, 2013 Raleigh, North Carolina.
Smart Grid Workforce Education Presentation Smart Grid – A Framework for Change Brad Gaskill, CEO - Poudre Valley REA May 29, 2009.
EEI Energy Efficiency Initiative Eric Ackerman ( Senior Manager, Regulatory Policy April 23, 2007.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable.
West Virginia Smart Grid Implementation Plan Steve Bossart, Dirk Baker, and Steve Pullins October 2009.
CEC 08-DR-1 Efficiency Committee Workshop 3/3/08.
Long Term National Impacts of State- level Policies WindPower 2006 Nate Blair, Walter Short, Paul Denholm, Donna Heimiller National Renewable Energy Laboratory.
Tier 2 Power Supply Planning Workshop Advanced AMI Benefits Overview.
Leveraging: What’s New ? Been There / Done That ? Heard this All Before? Meg Power, PhD Economic Opportunity Studies Washington, DC NASCSP Fall Meeting,
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable.
Consumer Education Challenge 1000 kwh x rate/kwh = $ Billed Amount When asked about energy usage, the customer receives this…… But really understands this…………
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Page 1 Pacific Northwest Smart Grid Demonstration Project  Largest Smart Grid Demonstration.
1 Technical Report NREL/TP June 2010 Early Fuel Cell Market Deployments: ARRA Quarter 1 of 2010 Composite Data Products Final Version February.
PJM Interconnection Smart Grid Investment Grant Update
CEC Public Workshop Order Instituting Informational and Rulemaking Proceeding (08-DR-01) March 3, 2008.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable.
Metering Americas April 24, 2006 Advanced Metering.
2015 NARUC Winter Meeting Nick Wagner – Iowa Utilities Board 1.
Community Choice Aggregation Demonstration Project Marin County Base Case Feasibility Analyses Overview April 5, 2005.
BGE Smart Grid Initiative Stakeholder Meeting September 17, 2009 Wayne Harbaugh, Vice President, Pricing and Regulatory Services.
Spring 2016 ICC Meeting – Subcommittee F Estimating the Value / Benefit of Diagnostics 1 of 3 – Perhaps? Josh Perkel and Nigel Hampton NEETRAC.
Irvine Ranch Water District Distributed Energy Storage Case Study
MEPAV 2010 CONFERENCE. AMI MANASSAS Gregg S. Paulson, P. E

Smart Grid Primer Energy Bar Association – Primer for Lawyers
September Workshop and Advisory Board Meeting Presenter Affiliation
September Workshop and Advisory Board Meeting Presenter Affiliation
Remote Service Switches Reconnect/Disconnect Meters
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
2/3 20% 71% Half 54% Over Half 45% 14% Introduction GHG Mitigation
Presentation transcript:

City of Leesburg AMI Project Paul Kalv, Leesburg Electric Director Doug Handley, Utility Consulting Services Advanced Metering Infrastructure – AMI

Overview Introduction Project Components and Investments Cash Flow Analysis – Ongoing Costs compared to – Benefits to be Realized Key Steps for a Successful Implementation Summary

Leesburg’s 2020 Vision Leesburg will operate the best and most secure electric grid in the country by the year 2020 by incorporating information and control technologies that can support four goals: (1) Empowering consumers, (2) Rewarding conservation and energy efficiency (3) Improving distribution reliability and resiliency, and (4) Expanding the use of renewable energy, distributed generation, and advanced alternative technologies.

Introduction Why do this Project? – Empowers customers with information – Enables rewards for conservation and energy efficiency – Enables improved distribution reliability – Enables greater use of renewable energy, distributed generation, and advanced alternative technologies – Reduces operating expenses – Promotes a competitive advantage – Grants fund more than half the cost

Project Components – Overview Program Management Meters Communication System Software Solutions Business and Operations Improvements Home Network Devices

Project Components – Program Management Includes – Project Manager – Technology Coach Benefits – Expertise with similar large projects – Centralized control – “one back to pat” and “one throat to choke” – Contract structure and management

Project Components - Meters Interval Reads offering rate options for customers Informs customers the “when” and “how much” energy used Remote account services with fewer truck rolls Event Logging Benefits to customers: More rate options and enhanced information for managing electricity usage and costs. More efficient utility operations.

The new meters installed in Leesburg will be industry standard. The existing meters are no longer offered.

Project Components – Communication System

Project Components – Software Solutions Meter Data Management (MDM) System – Monthly vs. 15-minute = 3,000 times more reads Enterprise Service Bus (ESB) – Allows multiple systems to share data Demand Response Management System Customer Web Portal Pre-pay Billing System

Project Components – Business and Operations Improvements Business Systems will be Enhanced – More rate plan options available to customers – Information to customer faster and with more detail – 2-Way communication for better energy management Utility operations will be More Efficient – Fewer truck rolls for meter reads, disconnects and reconnects – Near real time data for outage identification and restoration – Better system data for facilities planning

Project Components – Home Network Devices Customer access to account and usage information to better manage energy costs Utility messages and price signals Control of appliances to save energy

Project Components – Recap – Initial Investments MAJOR COMPONENTS$(000) Meters4,592 Communication System646 Software Solutions5,456 Business and Operations Improvements1,423 Program Management Fee1,681 Sub Total13,798 Home Network Devices (optional)1,240 TOTAL15,038

Project Costs – Summary COST AND FINANCING$(000) Project Costs General Electric12,878 City-provided components2,160 Sub Total15,038 DOE Grant(7,519) State Grant(1,240) Net Cost to the City of Leesburg6,279 Net Cost to Leesburg to be debt financed, resulting in an annual debt service expense

Cash Flow Analysis – Overview Cash Flow = Benefits – Ongoing Costs Benefits – Only quantifiable financial benefits are counted – Does not consider enhanced customer service and reliability or lower future investment in facilities Net Present Value (NPV) of 20-year Cash Flow – Compared to Initial Investment to determine “payback period”

Ongoing Costs Debt Service Information systems hosting service City Operating expenses

Annual Debt Service Expense – Example Calculations Key Point: Leesburg debt financing can be structured to allow for flexibility and “shaping” of the repayments. ANNUAL DEBT SERVICE FOR $6.5 MILLION - $(000) TERM3%5%7% 5 Years1,4191,5011, Years Years Years

Information Systems Hosting Systems to be Hosted – Network communication software – Meter data management system (MDMS) – Enterprise service bus (ESB) – Customer web portal – Pre-pay Benefits: – No hardware or software to purchase or maintain – No technical expertise to hire, train and develop – Cash flow more closely matches benefits

Information Systems Hosting Fees YEARSANNUAL FEE - $(000) ,584 51,631 6 – 20Add 3.0% Benefits: Many of the risks associated with IT are outsourced. Major component of costs are phased in over the first 5 years and locked in for 10 years.

City Operating Expenses - Summary Equipment operation and maintenance Cyber security and data services Personnel – increases – temporary (4) and permanent (2) – reduction (1) Customer outreach

Estimated City Operating Expenses YEARSANNUAL EXPENSES - $(000) – 20 *Add % Note: Years 1 – 3 include customer outreach expenses of $218k - $222k per year. * Excludes $150k for replacement of cyber security hardware every 5 years.

Summary of Estimated Annual Expenses - $(000) * Based on assumed 20-year term and 5% interest rate. Note: Years 6 – 20 estimated to escalate at approximately 2.3% per year. Year 1Year 2Year 3Year 4Year 5 Debt Service *522 Hosting Fees ,5841,631 City Operating Total1,0701,3482,0582,3242,376

Benefits to be Realized Soft Benefits – Customer benefits, choices, rate options – Improved outage restoration Financial Benefits – Power cost reductions – Fewer “truck rolls” for disconnect/reconnect and re-reads – Better revenue collection – Reduced energy theft

Relative Financial Benefits Type of Benefit Cumulative 20-Year NPV % of Total Power Cost Reductions $ 38,046,67874% Fewer Truck Rolls $ 8,537,64117% Better Revenue Collection $ 3,079,2186% Reduced Energy Theft $ 1,977,9814% TOTAL 20-YEAR NPV $ 51,641,519100%

Key Assumptions for Projected Demand Cost Savings Rate of adoption (i.e. how long until full potential is achieved) Estimated % demand reduction for each type of program Residential Dynamic Pricing – 11.4% Commercial Dynamic Pricing – 5.75% Residential Load Control – 5.35% for selected months Commercial Load Control – 1.75% for selected months Year % of Potential

Summary of Projected Annual Net Cash Flow - $(000) Year 1Year 2Year 3Year 4Year 5 Demand Savings ,3841,957 Other Savings ,0271,218 Expenses1,0701,3482,0582,3242,376 Net Cash Flow Year 6Year 7Year 8Year 9Year 10 Net Cash Flow *1,4211,6891,8141,9482,092 *Net Cash Flow for Years 11 – 20 grows from $2.1 to $4.1 million. Project is break-even in Year 6 (NPV)

Summary of 20-Year Cumulative NPV $(000) Financial Benefits51,642 Grants Received8,759 Debt Service6,279 Hosting Fees21,196 Operating18,117 TOTAL 20-YEAR NPV14,809

Key Steps for a Successful Implementation Execute contract – tonight’s agenda Dynamic Pricing programs Personnel development Customer outreach

Pricing Programs – Cafeteria Plan

Illustration of Potential Pricing Programs [does not reflect potential actual rates for Leesburg] ProgramkWhRatekWhRateBill AAverage Cost1,000$0.10--$100 BLarge TOU900$ $0.20$100 CMedium TOU950$ $0.40$100 DCPP1,000$0.081$20.00$80 - $100 ECPR1,000$0.101($20.00)$80 - $100

Implementation Steps – Pricing Program Goals Offer customers choices – Pick the plan that’s right for you – Opt-in or Opt-out Provide incentives to customers to reduce peak demand Share power cost savings with customers that cause reductions in peak demand

Implementation Steps – Personnel Development Customer service – Pricing programs – Customer usage data and web portal – Service disconnect/reconnect policies Information and communication systems Operations and system planning Finalize communication plan (internal & outreach) Schedule and deliver customer outreach

Implementation Steps – Customer Outreach Education – Energy conservation and load management – New equipment capabilities and benefits – New information system capabilities and benefits – New program opportunities Town meetings to explore new rate offerings Market new programs

SWOT Analysis

Summary Federal and State Grants fund over half the cost of the AMI Project The AMI Project enhances Leesburg’s customer service and system reliability Consumers will have the knowledge and tools to reduce their cost of power GE Costs: $12,878, 119; City Costs: $919,975 Hosting Costs (10 Years): $13,404,600 Total 20-year NPV savings = $14.8 million

Acknowledgement & Disclaimer This material is based upon work supported by the Department of Energy under Award Number DE-OE Disclaimer: This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof.