Target Test Report Given permission for a maximum of 5000 actuations. Performed 3679 actuations, 3654 with the gate valve open. Ran target at 0.4 Hz to.

Slides:



Advertisements
Similar presentations
of LFD Compensation Study S1 Global Cryomodule
Advertisements

ISIS Accelerator Division
Summary of MICE 4/4/2008 shift during the ISIS machine-physics period Goals for 04 Apr08 MICE shift: 1. Radiation survey in MICE Hall with target operating,
The MICE Target Lara Howlett University of Sheffield.
MICE TARGET OPERATION C. Booth, P. Hodgson, R. Nicholson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England.
Target Status Report Lara Howlett University of Sheffield.
MICE TARGET HARDWARE C. Booth, P. Hodgson, R. Nicholson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 - The MICE Experiment.
NMR Spectroscopy Tuning / Matching Shimming and Lock.
9 March 2005Edda Gschwendtner1 DAQ Terminology ISIS Terminology MICE Terminology Parameter Definitions.
MICO Alain Blondel 17 March MICO Alain Blondel 17 March MICE target test-run March 2008 Friday 14/03/2008 6:00-> 18:00 Saturday 15/03/2008.
Pump Probe Measurements of Femto-second Pulses By David Baxter.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 21 September, 2009.
Paul drumm daq&c-ws august/september Cooling Channel.
April 6th 2009Olympus Meeting at DESY, F.Brinker1 Vacuum system Available beam scraper Beam dimensions, Target cell Machine Studies on February 7 th 2009.
M.apollonioMICE Funding Agency Committee Meeting - RAL 18/4/ M. Apollonio – MICE Operations Manager University of Oxford MICE beam line commissioning.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 14 September, 2009.
MICO 9th Aug 2010J.S. GraulichSlide 1 MOM report o Last Week o Run Plan for this Week o Machine Physics Jean-Sebastien Graulich, Geneva.
Target Specifications & History (to avoid reinventing a broken wheel!) 2 nd December 2009 Chris Booth The University of Sheffield.
MICE Target Review Chris Booth Sheffield 12 th June 2006.
A Tale of Two Targets … 7 th September 2009 Chris Booth The University of Sheffield.
ISIS Beam Protection System and MICE operation. Dean Adams 29 Nov 07 Presented by Chris Rogers.
MOM - M.ApollonioAccel. R&D/Physics and IADR - RAL - 19/3/ Summary of MICE operations – 14/15 March 2008 AIMS - establish MICE beamline in ISIS synchrotron.
Wayne R. Meier Lawrence Livermore National Lab Per Peterson UC Berkeley Updated Heavy Ion Driver Parameters for Snowmass Point Design ARIES Meeting July.
MICE Control Issues Paul Drumm ~ Monday August 1 st 2004.
14/1/20097 January 2009MICE CM23 - Harbin - Beamline Session1 MICE Beamloss Data Adam Dobbs.
DESIGN AND OPERATIONAL EXPERIENCE OF THE MICE TARGET Target Drive The linear electromagnetic drive that has been designed to meet these requirements consists.
The PEPPo e - & e + polarization measurements E. Fanchini On behalf of the PEPPo collaboration POSIPOL 2012 Zeuthen 4-6 September E. Fanchini -Posipol.
MICE Target Mechanism P J Smith University of Sheffield MICE CM 18 RAL June 2007.
©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist.
MICE VC Aug '10J.S. GraulichSlide 1 MOM report o Achievements Since CM27 o Daily Operations o Run Plans o Summary Jean-Sebastien Graulich, Geneva.
Chris BoothMICE-UK I.C. 16th January Useful meeting held at RAL last Thursday. Representatives of MICE, ISIS & others with Sheffield electronic &
MICE Target – Design Update and Test Plans Chris Booth Sheffield 22 nd October 2005.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
SNS Integrated Control System SNS Timing Master LA-UR Eric Bjorklund.
1 MICE TARGET STATUS 23 rd February 2007 CM17 - CERN Paul J Smith University of Sheffield.
24/10/2015Sheffield University 1 Target Electronics Recap - Decision has been made to rebuild the target electronics control system so that it is upgraded.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
MICE Target - Risk Lara Howlett University of Sheffield.
Recent LFD Control Results from FNAL Yuriy Pischalnikov Warren Schappert TTF/FLASH 9mA Meeting on Cavity Gradient Flatness June 01, 2010.
Target Status Target installed in ISIS “Demonstrator” target in R78 Chris Booth Sheffield 7 th February 2008.
Topic 14 Digital Technology. Analogue and Digital Signals.
Timing Requirements for Spallation Neutron Sources Timing system clock synchronized to the storage ring’s revolution frequency. –LANSCE: MHz.
MICE Target Development Lara Howlett University of Sheffield.
RAL Muon Beam Line Properties. ISIS 70 MeV H- injection Ring accelerates up to 800 MeV in about 10 ms 50 Hz cycle - Dual Harmonic System ~ 2 x 1.5 MHz;
MICE TARGET OPERATION C. Booth, P. Hodgson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 – The MICE Experiment2 - The.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
Towards a 1m 3 Glass RPC HCAL prototype with multi-threshold readout M. Vander Donckt for the CALICE - SDHCAL group.
March 18, 2008 TJRMICE Beamline Status1 MICE Beamline Status (March 18, 2008) Tom Roberts Muons, Inc. Illinois Institute of Technology.
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
LC Power Distribution & Pulsing Workshop, May 2011 Super-ALTRO Demonstrator Test Results LC Power Distribution & Pulsing Workshop, May nd November.
Doppler Physics Waves from a static source Wave peaks evenly spaced around the source at 1 wavelength intervals.
Chopper wheel Rotates at 100 Hz and contains a timing photodiode to signal position on each turn. A slot cut in the disc passes a 130  s laser pulse train.
1 Fast kicker study Machine Time 2011/10/18~10/29(2 weeks) TB meeting 2011/01/14 T.Naito.
Fuji Test Beam Line commissioning Y.Sudo Univ. of Tsukuba.
Target/Beam Interaction M. Apollonio, A. Dobbs - IC 27/11/20081MICE Target Workshop - IC.
ISIS Beam and MICE Target Simulation MICE Collaboration Meeting Adam Dobbs 19 th Oct 2008.
Scan of piezo drive trigger delay For this timing scan, we picked an amplitude of 7.5V (a little more than required to give minimum rms vibration as identified.
Frequency Control through Pulse Width Modulation for NRF Cavities. As example at FLASH RF GUN Sven Pfeiffer for the LLRF team LLRF Workshop 2015 Shanghai,
Doubling the Target Insertion Rate P J Smith for MICE VC 163.
The Target Drive For The MICE Experiment Control and Infrastructure Optical Readout and Drive Electronics Target Drive A linear electromagnetic drive has.

Basics of Fuel Injection in Ports
Lasers for the polarimeter
EPICS Meeting March 12 – 14, 2008, Shanghai, China
I-LHC NOMINAL ions beam in 2007
(Beam) Commissioning Plan
Beam Beam electronics Block diagram disc gated disc gate disc gated
Table 2. Modal parameters estimated by Pulse Reflex®
Presentation transcript:

Target Test Report Given permission for a maximum of 5000 actuations. Performed 3679 actuations, 3654 with the gate valve open. Ran target at 0.4 Hz to minimise cooling issues and to maximise time to adjust parameters. Target hold position T = 35 C. Actuate (0.4 Hz) T = 55 C Tested the time delay and depth control mechanisms. Scanned parameter space to find optimum delay time and dip depth. Optimum depth ~45 mm reproducible. Optimum delay 5.9 (ms) from trigger 10 ms before injection Problem with trigger - GMS – from ISIS - solved. Problem with ADC for beam loss signal not solved. Tested target in 128/50 mode and saw that we could extract target in time to miss following ISIS pulse. Happy with performance of target……………