5/19/2003Manuel I. Martin Digital Hadronic Calorimeter Hardware/Electronics Status.

Slides:



Advertisements
Similar presentations
Bunch-by-Bunch Instrumentation Module Design Goals: –Unified conceptual design for all bunch-by-bunch instrumentation Beam position monitoring Bunch tune.
Advertisements

Use of G EANT 4 in CMS AIHENP’99 Crete, April 1999 Véronique Lefébure CERN EP/CMC.
Recent news about SiPM based applications R&D in DESY Nicola D’Ascenzo University of Hamburg - DESY.
1 m 3 Prototype Digital Hadron Calorimeter Collaborators Argonne National Laboratory Boston University University of Chicago Fermilab University of Texas.
An SiPM Based Readout for the sPHENIX Calorimeters Eric J. Mannel IEEE NSS/MIC October 30, 2013.
CLAS12 – RICH PARAMETERDESIGN VALUE Momentum range3-8 GeV/c  /K rejection factor Not less than 500  /p rejection factor Not less than 100 Angular coverage5.
The Gamma-Ray Large Area Space Telescope: UNDERSTANDING THE MOST POWERFUL ENERGY SOURCES IN THE UNIVERSE Anticoincidence Detector for GLAST Alexander Moiseev,
1 Cosmic Ray Test Stand with Scintillating Cells for Digital Hadron Calorimeter 06/23/2003 Kurt Francis - Northern Illinois University.
Detector Systems Update MICO April 23, MICE Detector Systems  CKOV u Nothing new  TOF0/1 u Tests to identify the source of the problems in the.
Cosmic Ray Test Stand with Scintillating Cells for Digital Hadron Calorimeter As of 9am 05/19/2003.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
Proposal for a barrel prototype H. Álvarez-Pol, J. Benlliure, E. Casarejos, D. Cortina, I. Durán, M. Gascón Status of the USC 27 th September
A Brief Overview of LabVIEW Data Acquisition (DAQ)
1 Tracking Tests of DHC Tower Update - 10/01/2003 Kurt Francis - Northern Illinois University.
Interaction between Keithley 6485 pico-ammeter and the PC through LabView By Shahab Khan.
Silicon Photomultiplier Readout Electronics for the GlueX Tagger Microscope Hall D Electronics Meeting, Newport News, Oct , 2007 Richard Jones, Igor.
MINER A NuMI MINER A DAQ Review 12 September 2005 D. Casper UC Irvine WBS7: Electronics and Data Acquisition  Overview (this talk): D. Casper  Front-end.
MINER A NuMI MINER A DAQ Review 12 September 2005 D. Casper UC Irvine WBS 7.2 & 7.3: Data Acquisition D. Casper (UC Irvine)
NLC – The Next Linear Collider Project Colorado Univ. – Boulder, Jan., 2004 LCD-ALCPG Presentation at the ALCPG-SLAC Meeting Progress Report of Work at.
APD Connector Update 6/9/03 Manuel Martin & Ian Harnarine Top View (mm)
4/1/2002Manuel I. Martin Digital Hadronic Calorimeter Hardware Status.
Cosmic Ray Test Stand with Scintillating Cells for Digital Hadron Calorimeter As of 9am 05/28/2003.
Digital Hadron Calorimeter Cosmic Ray Test Stand.
APD Connector Update 6/23/03 Ian Harnarine NICADD Weekly Meeting.
1 Initial Tests of DHC Tower Update - 09/03/2003 Kurt Francis, Donna Kubik - Northern Illinois University.
February 19th 2009AlbaNova Instrumentation Seminar1 Christian Bohm Instrumentation Physics, SU Upgrading the ATLAS detector Overview Motivation The current.
LBNE R&D Briefing May 12, 2014 LBNE R&D Briefing May 12, 2014 LArIAT and LBNE Jim Stewart LArIAT EPAG Chair BNL LBNE LARIAT-EPAG J. Stewart BNL T. Junk.
Status of EIC Calorimeter R&D at BNL EIC Detector R&D Committee Meeting January 13, 2014 S.Boose, J.Haggerty, E.Kistenev, E,Mannel, S.Stoll, C.Woody PHENIX.
In-Beam PET Status Report -- TPS. 2 TPS project PET monitoring prototype 2D view of the FOV coverage of the 4+4 modules Use of 4 modules vs. 4 modules.
Tuesday September Cambridge1 GDCC “next replacement of the LDA” Franck GASTALDI.
PWO/APD/CSP Development at Hiroshima U. Hiroshima ALICE-PHOS Group (T.Sugitate, K.Shigaki, et al.) 17 August, 2004, at CERN.
Shower Containment and the Size of a Test Calorimeter Adam Para, September 6, 2006.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
Munich, 18 Oct 2006J. Cvach, annual JRA31 JRA3 Institute of Physics ASCR Prague 1.ECAL, VFCAL (V. Vrba) 2.HCAL (J. Cvach) 3.Exchange in NA2 (travels 8.5.
Fullbeam DAQ board on PET system Eleftheria Kostara (INFN of Pisa, University of Siena ) Supervisors: F. Palla, M.G. Bisogni (University of Pisa) Technical.
A General High Resolution Hadron Calorimeter using Scintillator Tiles Manuel I. Martin for NIU / NICADD Northern Illinois University Northern Illinois.
1 Course of Action For Strengthening Transportation Communications and Coordination In the National Capital Region Presented by John M. Contestabile Maryland.
M. Chefdeville LAPP, Annecy, France. Introduction  Motivations for a Digital hadronic calorimeter Count hits instead of measuring energy deposits Reduce.
DAQ Development P. Roger Williamson Hansen Experimental Physics Laboratory Stanford University GLAST Collaboration Meeting GSFC February 10, 1999.
USB Project Ian Coulter. USB Interface USB Menu -Download HEX File -Send Trigger -Start DAQ.
Mar. 18, 2009 HAPD ASIC Status Super KEKB Meeting 1 S.Nishida (KEK) S. Nishida HAPD ASIC Status Super KEKB Meeting Mar. 18, 2009 KEK.
MINERvA Status Report Deborah Harris, Gabe Perdue, Kevin McFarland, Jorge Morfin October 15, 2009.
ASIC Activities for the PANDA GSI Peter Wieczorek.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
1 FVTX Monthly/Quarterly Report January 2009 Cost Summary Schedule Summary Current technical status of each WBS item.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
P08311: FPGA Based multi-purpose driver / data acquisition system Sponsor: Dr. Marcin Lukowiak Team MemberDisciplineRole Andrew FitzgeraldCEProject Manager/FPGA.
Calorimeter Simulation Infrastructure Norman Graf Arlington ‘03.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
A Silicon Photomultiplier (SiPM) Based Readout for the sPHENIX Upgrade S. Boose, J. Haggerty, E. Mannel, A. Sukhanov For the PHENIX Collaboration Introduction:
TOFp Status Report Introduction: system overview Functional requirements Analysis status –track extrapolation & matching –start time –stop time –identified.
FT Prototype Test Purpose: test the prototype of the FT Calorimeter and Scintillator Hodoscope Technique: prototype is installed under the Hall B photon.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
ECFA Workshop, Warsaw, June G. Eckerlin Data Acquisition for the ILD G. Eckerlin ILD Meeting ILC ECFA Workshop, Warsaw, June 11 th 2008 DAQ Concept.
The Multi-Pixel Photon Counter for the GLD Calorimeter Readout Jul Satoru Uozumi University of Tsukuba, Japan for the GLD Calorimeter.
Evaluation Criteria and Traffic Models Status Update Farooq Khan IEEE Interim Meeting Garden Grove, CA, USA May 10-13, 2004.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Elena Rocco Nikhef, The Netherlands On behalf of the ALICE Utrecht-Nikhef group Jamboree – Utrecht December 2012.
FTOF Status Anton A. Izotov, Frascati
April 27, 2004 ECAL meeting, Giessen A.Vinogradov Kurchatov Insitute, Moscow 1 PHOS APDs The APDs are very sensitive to Bias/Cooling variations within.
Shashlyk DAQ and FEE Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA DAQ and FEE Workshop, Rauischholzhausen Castle.
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
FARICH status E.A.Kravchenko Budker INP, Novosibirsk, Russia.
ROBOX modification plans
Design of the He and HB ODU
Tracker Station QA Acceptance Test Rig Status
CALICE/EUDET Electronics in 2007
SCINTILLATOR HARDWARE
Vishnu V. Zutshi For the NICADD team.
Presentation transcript:

5/19/2003Manuel I. Martin Digital Hadronic Calorimeter Hardware/Electronics Status

5/19/2003Manuel I. Martin Immediate Goals GOALS Intermediate Goals Long Range Goals “Get two layers of the ‘tower’ working as soon as possible with minimum expenses” “Get at least one layer of the ‘tower’ working as soon as possible using the Hamamatsu APD with minimum expenses” “Design ‘full’ DAQ system for the ~40K channels prototype for test on ‘a’ beam line”

5/19/2003Manuel I. Martin People / Assigments Until classes start at UIC  Ian Harnarine  Work on the QPA02 APD (Hamamatsu)  Help on procurement  Shahab Khan  Work on the XYZ controls and Data Acquisition

5/19/2003Manuel I. Martin Make decisions to achieve immediate and intermediate goals as follows:  Design two separated ‘light tight’ boxes  to accommodate 6 PMT (16 channels)  to accommodate 2 Hamamatsu APD and/or one RMD SiAPD  Transfer the setup that Kurt uses to instrument 2 layers of the ‘tower’ Start collecting necessary data from  Hamamatsu   RMD ????  QPA02 (R. Yarema ?) Design  holder for the Hamamatsu APD (conceptual, interface with Sasha)  PC Board to interface Hamamatsu to QPA02 (impossible until data for QPA02)  Holder for the RMD SiAPD (impossible until data for QPA02)  PC Board to interface RMD SiAPD QPA02 (impossible until data for QPA02) Progress to date:

5/19/2003Manuel I. Martin A WELL DESIGN PROGRAM PHYSIC’S GOALS Technology First Level Simulations FIRST MODEL SIMULATIONSFIRST GENERAL MODEL FIRST GENERAL GOALS REVIEW GENERAL GOALS MECHANICALELECTRICAL DETAILED SIMULATIONS OF THE DESIGN ARCHITECTURE DESIGN Detailed Simulation of the Design COMPARISON Test Prototype on TEST BEAM