Javier A. Sevilla CF Commissioning Plan-FAC June 17, 2008 1 CF LCLS Commissioning Plan Javier A. Sevilla Engineering Group.

Slides:



Advertisements
Similar presentations
1 Procuring a Design Project engineers perspective on starting the design process and establishing the A/E scope of work Frank C. Quigley General Engineer.
Advertisements

Jess Albino CF – Breakout Session June 17, Facility Advisory Committee LINAC Coherent Light Source Project Conventional.
David Saenz FAC CF April 20, 06 Meeting of the LCLS Facilities Advisory Committee LCLS Conventional Facilities D. Saenz.
Richard M. Boyce FAC Review – Accelerator Installation October 29-31, Installation – Accelerator Systems Installation Planning.
Jess Albino Session 5 Conventional November 11, Facility Advisory Committee LINAC Coherent Light Source Project.
Javier A. Sevilla Interface & Configuration FAC Review April 16, Interface and Configuration Management Outline CF.
Richard M. Bionta XTOD October 12, 2004 UCRL-PRES-XXXXX X Ray Transport, Optics, and Diagnostics, Overview Facility Advisory Committee.
David Saenz Facility Advisory October 30, 2007 CONVENTIONAL FACILITES MANAGEMENT.
1 David Saenz 1 Hutch Construction in FEH June 08, 2009 Hutch Construction in Far Experimental Hall David Saenz – Project Manager.
Jess Albino CF Breakout April 16, CONVENTIONAL FACILITIES Project Team CF Changes Electrical Engineer - done Mechanical.
Javier A. Sevilla MMF FAC Review October 27, Magnetic Measuring Facility (MMF) Outline Summary of Facility Requirements.
David Saenz Far Experimental Hall - June 17, Far Experimental Hall - Hutches Scope Budget Schedule.
Jess Albino FAC CF April 16, 2007 Meeting of the LCLS Facilities Advisory Committee LCLS Conventional Facilities Jess.
1 Jess Albino 1 Conventional Facilities Status FAC Review – Breakout Session CONVENTIONAL FACILITIES STATUS Jess Albino – Associate.
David Saenz FAC CF Oct 12-13, 2004 Conventional Facilities Overview SLAC Site Plan Systems Description Construction Schedule.
Jess Albino Facility Advisory October 29, 2007 FACILITY ADVISORY COMMITTEE PLENARY CONVENTIONAL FACILITIES UPDATE October.
David Saenz CF Oct 30, CF MEP Commissioning.
Richard M. Boyce FAC October 29-31, Installation Planning Integration process – IMT update Installation Planning &
Bob Law FAC Oct 24, Sector 20 Project Overview Sector 20 Site Plan Description Organizational Chart Schedule Cost.
David Saenz FAC November 11, 2008 SLAC National Accelerator Laboratory 1 Far Experimental Hutches David Saenz Project Manager.
Mike Scharfenstein FAC Review - November 11, 2008 SLAC National Accelerator Laboratory 1 Environment Safety & Health Status.
Stefan Moeller Exp. Areas Conventional October 24, Experimental Areas - Conventional Facilities Stefan Moeller.
Javier A. Sevilla April 5, Magnetic Measuring Facility (MMF) Outline Organizational Chart Facility Design Criteria,
CONVENTIONAL ELECTRICAL TDR DESIGN Randy Wielgos March 22, 2012 ILC CFS Baseline Technical Review.
ILC Mechanical & Electrical Review Conventional Electrical System Americas Region Design Summary March 21, 2012 Randy Wielgos, FNAL Parsons Electrical.
Commissioning Presentation For Society of American Military Engineers (SAME) George Washington University Chapter February 25, 2011.
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Preliminary Studies of the Electric Power Distribution for CLIC
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
Dan Frasier, PE, CCP Successful Turnover of New and Renovation Construction Projects Successful Turnover of New and Renovation Construction.
Javier A. Sevilla Interface & Configuration FAC Review October 12, Interface and Configuration Management Outline.
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
Birmingham, AL SERBCA Fall Conference Presented by: Gary Sweatt, CxA, QCxP.
David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 1 Undulator Complex Status LCLS Introduction.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Method of Accomplishment Marty Fallier Director for Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Overview Marty Fallier, Conventional Facilities Director ASAC Meeting July 18, 2008.
Whitman-Hanson Regional High School Energy Efficient Systems: HVAC All fans and pumps are VFD controlled with fully reactive controls Condensing gas-fired.
David Saenz Readiness for Oct 12, 2006 # Meeting of the LCLS Facilities Advisory Committee LCLS Conventional Facilities.
John N. Galayda LCLS Accelerator Readiness December 2, LCLS Overview December 2, 2008 Project Construction Status.
Specifying Commissioning Derek De Jesús, CxA Commissioning Manager Chinook Systems, Inc. Understanding the Commissioning Process October 14, 2008 ©2008.
David Saenz EIR Review Oct 9-11, Conventional Facilities (CF) WBS 1.9 ETC and Methodology David Saenz CF Systems Manager.
1 BROOKHAVEN SCIENCE ASSOCIATES CF Coordination with Technical Divisions Ove Dyling Conventional Facilities Advisory Committee Review October 5-6, 2010.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
E- source kick-off meeting e- Source RDR- Conventional Facility & Siting Overview Fred Asiri/SLAC.
Commissioning at NYP Joseph Lorino, PE, LEED Vice President
CF Organization & Schedule
Meeting of the LCLS Facilities Advisory Committee
Maintenance at ALBA facility: Strategy for the conventional services
Far Experimental Hall Hutches Civil Construction
Far Experimental Hall Hutches Civil Construction
CONVENTIONAL FACILITIES STATUS
Electron Beam Systems ETC and Methodology
Department Of Energy Review LINAC Coherent Light Source Project
Conventional Facilities (WBS 1
Far Experimental Hall - Hutches
Project Status Review May 13-15, 2008.
Conventional Facilities WBS 1.9
Conventional Facilities Status
CONVENTIONAL FACILITIES
Installation Status & Operational Readiness Process
Richard Hislop Construction Safety Coordinator
LCLS MMF Facility Status
Department Of Energy Review Linac Coherent Light Source Project
Phase 1 Statement of Work Preconstruction “Plan The Work”
Javier A. Sevilla Conventional Facilities
CF Scope, Management & Organization
CMGC Overview SLAC Site Plan Systems Description Construction Schedule
Presentation transcript:

Javier A. Sevilla CF Commissioning Plan-FAC June 17, CF LCLS Commissioning Plan Javier A. Sevilla Engineering Group Conventional Facilities

Javier A. Sevilla CF Commissioning Plan-FAC June 17, Outline Plan Team Commissioning Process Activities Deliverables Summary

Javier A. Sevilla CF Commissioning Plan-FAC June 17, Beam Transport HallUndulator Hall Far Experimental Hall Electron Beam Dump Front End Enclosure Near Experimental Hall X-Ray Transport & Diagnostics Tunnel Commissioning Areas Central Utility Plant/ 12Kv Substation 522

Javier A. Sevilla CF Commissioning Plan-FAC June 17, Commissioning Plan 1.Defines Scope of CxA and requirements 2.Part of contract documents for each MEP subcontractor 3.Part of TCCo Contract Prepared by

Javier A. Sevilla CF Commissioning Plan-FAC June 17, Scope Definition for CxA 1.List Requirements 2.List Deliverables 3.List team members 4.Provides all reference documentation

Javier A. Sevilla CF Commissioning Plan-FAC June 17, Team Commissioning Agent (CxA) Engineering Economics Inc. (EEI) CF Engineering Group CF Construction Group LCLS QA Manager Turner MEP Coordinator Cx Coordinator SLAC Facilities Dept HVAC, Electrical, Fire Alarm, Ops Mechanics Subcontractors O. C. McDonald-HVAC & Piping Alpha Air Balancing Agency Cupertino Electric (CEI) Air Systems, Inc. BMS Ceitronics-Fire Alarm Mitsubishi-Elevator Allied Cranes RCM-Fire Protection

Javier A. Sevilla CF Commissioning Plan-FAC June 17, Commissioning Agent (CxA) Engineering Economics Inc (EEI) Selected by using a competitive bidding process Five bids received (AEC, EEI,AEI, and WBI) EEI has offices nationwide and able to shift resources if necessary Commissioned over 33 million sf Data centers, office buildings Medical research labs Pharmaceutical labs Federal facilities LCLS Sector 20 Injector Facilities - successful LCLS Magnetic Measurement Facilities - successful

Javier A. Sevilla CF Commissioning Plan-FAC June 17, Commissioning Meeting May 2-08 Weekly Meetings Started in Nov. 14, Meetings every 3 weeks

Javier A. Sevilla CF Commissioning Plan-FAC June 17, Commissioning Team CF LCLS K. Ahmed R. Baclit D. Ciorbea R. Maggi J. Saldivar J. A. Sevilla L. Shewchuk K. Yang QA Manager D. Marsh ESH/BIO R. Kerwin E. Gomes B. Smith Subcontractors-TCCO A. Pimentel F. Sisca C. Farnell R. Gonzales G. Strickland J. Fitzgerald H. Limosnero K. Minchaca D. Swartz R. Spina R. Furtado T. Locatelli M. Clayton SLAC Facilities B. Choate G. Kuraitis R. Radau K. Chan R. Candelario B. Harrison P. Francisco S. Poitier S. Jensen J. Kang and HV electricians J. Pfefferkorn F. Castillo and LV electricians K. Joong N. Yeung R. Zingsheim EEI K. Quigley A. Parker M. Abrahamson

Javier A. Sevilla CF Commissioning Plan-FAC June 17, Commissioning Team at Work

Javier A. Sevilla CF Commissioning Plan-FAC June 17, Commissioning Process PLAN Resources (CxA, CF Engrs, TCCO, Subcontractors, Facilities Requirements (FT, PFT, Acceptance, Inspections) Configuration Control of test results, observations, inspections, minutes, schedule, acceptance, etc. Configuration Control of tests results, inspections, training, documentation, acceptance, etc.

Javier A. Sevilla CF Commissioning Plan-FAC June 17, Configuration Management Cx Process ftp://ftp.slac.stanford.edu/groups/lcls/Turner/LCLS%20Commissioning%20Process/

Javier A. Sevilla CF Commissioning Plan-FAC June 17, Commissioning Process Activities Review of design documents by CxA Site inspections (CxA, Facilities Dept, CF LCLS) Prepare list of observations (by Category) Review of Constructions checklists (CxA and Facilities Dept) Witness some PFT (CxA) Perform ALL Functional Testing (FT)

Javier A. Sevilla CF Commissioning Plan-FAC June 17, CUP Plan View Drawing M0203 Electrical Rm Chillers Boilers Mech Room-NEH

Javier A. Sevilla CF Commissioning Plan-FAC June 17, CUP On-Going Cx Activities Substation 522 CUP transformers Chillers SwitchgearBoiler

Javier A. Sevilla CF Commissioning Plan-FAC June 17, Commissioning Activities Completed Substation S522 Energized and completed except pending punch list Rating capacity 4,000 amps, KV Provides power to LCLS three 2.5MVA transformers and others New medium pressure underground natural gas piping to CUP: 1,400 LF 30 Million BTUHs nominal capacity BTH West Construction BTH Switchboard ( 480 v, 3 ph, 800 Amps)

Javier A. Sevilla CF Commissioning Plan-FAC June 17, LCLS Substation S522 Substation 522 behind the CUP kv Switchgear inside

Javier A. Sevilla CF Commissioning Plan-FAC June 17, CENTRAL UTILITY PLANT (CUP) Major Equipment to Commission Two Chillers (425 tons/ea), Primary and Secondary CHW loops and Pumps  BTH,UH,EBD,FEE, NEH and FEH One Boiler (150 BHP/ea) Primary and Secondary HW loops and pumps DDC Temperature Control System to be connected to SLAC network via ALC Web Control Interface with EPICS (Technical systems) One Air Compressor (268 Air Dryer and Receiver. Will provide service to: BTH, UH, EBD, FEE, NEH,X-RAY, FEH Wet Sprinkler System-Ordinary Hazard Group 1 One AHU for electrical room Mechanical rooms for NEH HVAC system (MAU) and AHU’s

Javier A. Sevilla CF Commissioning Plan-FAC June 17, Chillers Room in CUP

Javier A. Sevilla CF Commissioning Plan-FAC June 17, Deliverables Final Commissioning Report Pre-Functional and Functional Test Reports (FT), PFT, Checklists, observations. Etc. O&M MEP Training Records All documentation available for future operations and maintenance

Javier A. Sevilla CF Commissioning Plan-FAC June 17, Summary Roles and responsibilities are clearly defined in the Commissioning Plan Expectations are documented and well understood! CxA reports to CF LCLS and collaborate with TCCO, MEP subs, SLAC Facilities maintenance and operations staff Goal is to deliver a complete and functional project with all MEP systems fully operational, inspected, tested, checked, verified and documented!

Javier A. Sevilla CF Commissioning Plan-FAC June 17, End of Presentation Supporting Documentation to Follow

Javier A. Sevilla CF Commissioning Plan-FAC June 17, Partial List of MEP Equipment

Javier A. Sevilla CF Commissioning Plan-FAC June 17, Minutes of Meetings

Javier A. Sevilla CF Commissioning Plan-FAC June 17, Review Documentation and PFT

Javier A. Sevilla CF Commissioning Plan-FAC June 17, CUP Plan View Drawing M0203 Electrical Rm Chillers Boilers Mech Room-NEH