1 A MODEL FOR TEACHING IT PROJECT MANAGEMENT SIMUTANEOUSLY TO UNDERGRADUATE MANAGEMENT AND IT STUDENTS Presented by Carl Rebman University of San Diego.

Slides:



Advertisements
Similar presentations
1 The Promotion and Tenure Process Managing the Academic Career for Faculty Women at Undergraduate Computer Science and Engineering Institutions CRA-W.
Advertisements

James W. Stuckert Career Center University of Kentucky
AAFCS Annual Conference Research-to- Practice Session June 27, 2013 EMBRACE AND MANAGE ONLINE TEACHING METHODS.
TRC RFA WEBINAR Thursday, January 16, :00 a.m.
Database Design Concepts Info 1408 Lecture 1 Introduction to the module.
SIM SOFTWARE ARCHITECTURE Instructor: Masrah Azrifah Azmi Murad, PhD Room: C masrah.azrifah [at] gmail.com OR masrah [at] fsktm.upm.edu.my.
Opening the Door to Third Level Education for Women Dr A. Meehan, P. Corey, J. Conaghan, J. Crudden.
Experience in Applying Online Learning Techniques in Computer Science & Engineering Dr. Aiman H. El-Maleh Computer Engineering Department King Fahd University.
Copyright © 2003, Scott Higgins and Marianne Hollis Copyright Statement This work is the intellectual property of the authors. Permission is granted for.
Five Month Retention of Basic Genetics Knowledge Following an Introductory Biology Course Peter Busher and Andy Andres Division of Natural Sciences and.
Prince George’s Community College Online Express Training Faculty to Teach Online Mary Wells Margo Chaires Andrew Habermacher.
Assessment Surveys July 22, 2004 Chancellor’s Meeting.
Tammy Muhs General Education Program Mathematics Coordinator University of Central Florida NCAT Redesign Scholar Course Redesign: A Way To Improve Student.
New Advanced Higher Subject Implementation Events
The 4-Year College Plan College Academic Vocabulary.
 Prototype for Course on Web Security ETEC 550.  Huge topic covering both system/network architecture and programming techniques.  Identified lack.
Ranita Ghosh Dastidar Implementing active learning by stimulating critical thinking and having targeted research goals in a lab Rita Egekenze, Raul F.
Charting Library Service Quality Sheri Downer Auburn University Libraries.
Counselor Conference November 19, 2013 Dr. Lawrence E. Whitman Kansas Affiliate Director, PLTW College of Engineering Wichita State University.
Using Technology to Enhance Instruction. Educational Technologies Blackboard, Content- Based Tools Distribution Tools Communicatio n Tools Presentatio.
Robert W. Lingard California State University, Northridge EEET July 11, 2009.
Overview of ME 195 SENIOR DESIGN PROJECTS 2009/2010 San Jose State University Department of Mechanical and Aerospace Engineering Instructors: Section 1:
February 28, 2008The Teaching Center, Washington University The Teaching Citation Program & Creating a Teaching Portfolio Beth Fisher, Ph.D. Assistant.
TETC-TYT Phase I Progress Presentation March 6, 2007.
ADEPT 1 SAFE-T Evidence. SAFE-T 2 What are the stages of SAFE-T? Stage I: Preparation  Stage I: Preparation  Stage II: Collection.
The Redesigned Elements of Statistics Course University of West Florida March 2008.
Presenter: Ku-Chou Tai Advisor: Ming-Puu Chen Gill, T. G. & Helton, C. F. (2006). A self-paced introductory programming course. Journal of Information.
MA Thesis/Papers-In-Lieu Overview and Process. Thesis: What is it?  A thesis is a scholarly manuscript that reports on a significant in-depth investigation.
IFS410 – End User Support Chapter 11 Training Computer Users.
NESCent Postdoc Professional Development Series on Effective Teaching and Learning Session 7 – Testing, Assessment and Grading October 20 th, 2006 NESCent.
Formative Peer Review at Ocean County College. Guiding Principle “Ideally, the peer review of teaching is a critically reflective and collaborative process.
Columbia University School of Engineering and Applied Science Review and Planning Process Fall 1998.
University of Texas Libraries Integrating Library Resources with Blackboard TBUG Conference, Fall 2006.
FYITS – Students Mktg Briefing Nov 2010 BSc (Hons) Engineering Management Nature of Course The course seeks to equip students with management knowledge.
Faculty Senate Retreat Fall Welcome Back A moment of gratitude Schedule of Events: 9:00 am - 9:15 am Welcome & Continuing Topics 9:15 am - 10:00.
Peer Reviewer - Basic Workshop 2 Prof Hala Salah Consultant in NQAAP Prof Hussein El-Maghraby Member, NQAAP.
Information Systems Education Conference - ISECON Ryerson University School of Information Technology Management The Use of Internet-based Tools.
Preparing Visually- Disabled Instructors to Teach Online Thomas J. Tobin, Ph.D. Westmoreland County Community College.
MT ENGAGE Student Learning Outcomes and Assessment April 27, 2015.
M.B.A. PROGRAMME. Introduction The Master of Business Administration (M.B.A.)is a Post-Graduate course offered by Princeton College, it is a Two- year.
Reading and Literacy M.Ed. Program.  Graduate programs across the university require some sort of exit option that shows that the student has mastered.
Tools and Techniques for the Internal Audit Staff (3 rd Run) Institute of Internal Auditors-Philippines Best Western Astor Hotel August 7,8,14 & 15, 2009.
COUNSELOR EDUCATION PEDAGOGY TRAINING Session One: Significant Learning and Counselor Education.
College Academic Vocabulary
Information for Students and Families
Taste of Taskstream Aaron Detty Assistant Professor
Mary Corcoran January 9th, 2014
Placing courses in local GE patterns: Models for Effective Practice
Information for Students and Families
EDUCAUSE 2001 Mid-Atlantic Conference
ALL project 2 – Virtual Reality Interactive Story
Introduction to New Product Development (Portfolio)
Preparation for SER on Mechanical Engineering Study
Analysis: Clarity of Scholarly Question Style & Scholarly Relevance
Information for Students and Families
Robert W. Lingard California State University, Northridge
Longwood University Buffalo, NY October, 2017
Robert W. Lingard California State University, Northridge
Information for Students and Families
Information for Students and Families
Curriculum Coordinator: Marela Fiacco Date : February 29, 2015
Information for Students and Families
FAN S. NOLI UNIVERSITY OF KORÇA
Information for Students and Families
The roles and the process
Discussion and Future directions
Department Chair: Liz Brown Date of Presentation: 01/19/18
Information for Students and Families
Information for Students and Families
Analysis: Clarity of Scholarly Question Style & Scholarly Relevance
Presentation transcript:

1 A MODEL FOR TEACHING IT PROJECT MANAGEMENT SIMUTANEOUSLY TO UNDERGRADUATE MANAGEMENT AND IT STUDENTS Presented by Carl Rebman University of San Diego Decision Sciences Institute November 18, 2007 Paper co-authored by Fred L. Kitchens and Queen E. Booker

2 Purpose of the Paper To describe a model for teaching Information Technology Project Management to MIS and General Management majors to: Improve the management skills of MIS students Improve the IT skills of management students Develop the project management skills of both groups of students

3 Why MNSU opened ITPM to non MIS students Declining MIS enrollment Course holds 36 students; enrollment had been 5-7 students Project management was listed as one of top skills recruiters are looking for from our new graduates

4 Problem with course Designed to emphasize software development using project management Students’ only prior exposure to project management in the college is a module in Production and Operations Management This module can be as little as one class hour and generally no more than two at MNSU MIS curricula emphasize software and technology management General management curricula emphasize general management skills such as human resource management

5 Course Design 16 week semester course 4 weeks intensive seminar in project management concepts using 3 hours class time and a minimum of three hours online per week emphasizing project management concepts covered under the project management guidebook and the project management certification exam as well as effective team management and the system development lifecycle 12 weeks of hands-on IT related project management exercises, each designed to last 3 weeks although students decide how long each project will take for their team to complete

6 Course Design: Assessments Three assessment at the end of the first four weeks: An assessment on the technical nature of project management tools A pre-assessment of IT knowledge and expertise A self-assessment of the student’s perception of their own management style.

7 About the projects During the third and fourth weeks, students are assigned to teams of 4 (the chair was particularly helpful in this instance. Once the class filled, he only added students in groups of 4). During the fourth week, the students assess their strengths and weaknesses and select one of the four projects to manage within their team Each team also decide on when each project will begin and when it SHOULD end. Teams can choose to complete the projects in parallel or one at a time.

8 Expectations of the Project Manager Each project manager: Develops a project plan consisting of all the planning tools for a project Is required to submit the project plan for approval as they would in a business environment. Is given a limited budget Is required to submit four scope reports during the duration of their respective projects, with the last scope report submitted after the completion of the project. Is given an hourly bill rate based on graduation date. The hourly rate ranges from $200 for students graduating in three semesters to $300 for students graduating in the current semester.

9 Assessments Post Project At the end of the project, team members evaluate the project manager on his or her use of the project management tools, and using the same questions used in the self- assessment earlier in the semester. The assessment results are provided to the project manager for reflection purposes only. At the end of the semester, students are assessment on project management tools and techniques and IT concepts covered by the class.

10 During the Project Period Prior to the scheduling of the projects, training sessions on each of the types of IT technologies are scheduled for which students are enrolled. The purpose is to see if the scheduling of training influences when students decide to begin certain projects.

11 Sample Projects Prototype a data warehouse (database design only) Design a wireless network for a hotel Design a spreadsheet based decision support system Design a market basket analysis module for retail sales Design through data architecture an ERP system

12 Assessment and Evaluation Results This approach to teaching Project Management was attempted in 2005 and In the fall semester 2005, the class consisted of 15 IT related majors and 9 management students. In the fall semester 2006, the course had 17 MIS/IT related majors and 55 general management majors.

13 Assessment and Evaluation Results Continued The goal of the class is to improve the project management skills of both groups while improving the general management skills of the MIS students and the IT skills of the general management students

14 Assessment and Evaluation Results Continued Based on a comparison of pre- and post-test results: The general management students actually performed better than expected on the pre-IT test. The MIS students significantly (.05) improved their knowledge on general management concepts. The general management students improved between pre-test and post-tests but not as significantly

15 Student Assessment of the Course Fall 2005Fall 2006 QuestionStudent TypeMean Opinion of subject contentGM44.3 MIS/IT34.1 Course meets expectationsGM MIS/IT44.1 General opinion of assignments GM44 MIS/IT Progress on ProjectsGM44 MIS/IT44 Course FormatGM MIS/IT4.44.1

16 Problem with the class format Students were not required to attend class after the fourth week This behavior crossed over into other classes much to the dismay of other faculty members

17 Future Steps College is building a new college of business that is scheduled to have a lab conducive to group work which will allow the course to require students to attend class as required to complete projects Depending on groups and group skills, not all projects can be completed successfully in the time allotted. More time will need to be emphasized regarding techniques for keeping projects on task.

18 Questions?