Transportation – Costs © Allen C. Goodman 2009 Transportation Consider a roadway of distance d. Services c cars per hour, at speed s. Travel time for.

Slides:



Advertisements
Similar presentations
Mass Transit OSullivan Chapter 11. Outline of the Chapter Analyze some empirical facts about public transit in the United States Analyze the commuters.
Advertisements

Transport for Canberra 07 November2013. Transport for NSW: Regional Transport Plan ACT, whilst not part of the region, is an important destination Transport.
CONGESTION KSG HUT251/GSD 5302 Transportation Policy and Planning, Gomez-Ibanez OUTLINE OF CLASS: 1.NATURE AND SEVERITY 2.MENU OF REMEDIES 3.ENGINEER’S.
Chapter 7 The Cost of Production 1.
GE541 Economic Geography of Transport October 30th.
COSTING AND PRICING IN TRANSPORTATION KSG HUT251/GSD 5302 Transportation Policy and Planning, Gomez-Ibanez OUTLINE OF CLASS: 1.ROLE OF MARGINAL COST IN.
Three Phases of Commuting Trip 1.Collection Phase – the trip from home to the main travel vehicle Cost: a.basically zero for automobile b.time costs and.
Who Wants to be an Economist? Part II Disclaimer: questions in the exam will not have this kind of multiple choice format. The type of exercises in the.
Production and Costs. The How Question? From the circular flow diagram, resource markets determine input or resource prices. Profit-maximizing firms select.
Lec 3, Ch. 2 Transp Systems & Organization Understand the nation’s transportation system is the result of independent actions (through reading) Understand.
10 Output and Costs Notes and teaching tips: 4, 7, 23, 27, 31, and 54.
Chapter 8 Costs © 2006 Thomson Learning/South-Western.
10 Output and Costs Notes and teaching tips: 4, 7, 23, 27, 31, and 54.
Travel and Transportation © Allen C. Goodman, 2009.
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved Chapter 11 Mass Transit.
BUSINESS ECONOMICS Class 7 7 December, Recap  Production Theory  Factors of Production  Cobb-Douglas, Linear function  Isoquants, Isocosts 
Production and Costs.
Transportation Logistics Professor Goodchild Spring 2009.
Externalities on highways Today: We apply externalities to a real-life example.
Chapter 8 Cost McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All Rights Reserved.
More on Externalities © Allen C. Goodman 2002 Transportation Consider a roadway of distance d. Services c cars per hour, at speed s. Travel time for.
MANAGERIAL ECONOMICS PRODUCTION & COST ANALYSIS
GG 541 November 6, Basic Demographic Trends Population growth in US twice as fast as in Europe Urbanization - about 75% and over in USA, UK, Canada,
Urban Transportation 6. Introduction The major problem facing the transportation is congestion. The major problem facing the transportation is congestion.
Economic Applications of Functions and Derivatives
State and Local Public Finance Spring 2013, Professor Yinger Lecture 11 User Fees (=Public Prices)
A Brief Comparison on Traffic System Between London and Shanghai Allen Liu, Shanghai Feb. 16 th 2012.
Taxation and Income Distribution
Urban Transport in the Developing World. Elements of Urban Transport Sector Urban public transport: Urban public transport: On-street systems (for buses,
Chapter 8 Cost Copyright © 2014 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
K.O.R.E. Enterprises Workshop Urban Transportation Systems 10/15/08.
TRANSPORTATION PLANNING. TOPICS 1.ROADS AND PUBLIC GOODS 2.RATIONALE TO JUSTIFY ROAD BUILDING 3.URBAN PLANNING AND TRAFFIC CONGESTION (UNINTENDED CONSEQUENCES)
10.1 Chapter 10 –Theory of Production and Cost in the Long Run(LR)  The theory of production in the LR provides the theoretical basis for firm decision-making.
Cost – The Root of Supply Total Cost Average Cost Marginal Cost Fixed Cost Variable Cost Long Run Average Costs Economies of Scale.
Mass Transit Chapter 11 McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Transit Estimation and Mode Split CE 451/551 Source: NHI course on Travel Demand Forecasting (152054A) Session 7.
Measuring Cost: Which Costs Matter?
Chapter 8 © 2006 Thomson Learning/South-Western Costs.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. The Costs of Production Chapter 6.
Copyright (c) 2000 by Harcourt, Inc. All rights reserved. Basic Concepts of Costs Opportunity cost is the cost measured by the alternative uses that are.
1 Chapter 7 Production Costs Key Concepts Summary Practice Quiz Internet Exercises Internet Exercises ©2002 South-Western College Publishing.
Cost in the Long Run How does the isocost line relate to the firm’s production process? 56.
Chapter 6 Production. ©2005 Pearson Education, Inc. Chapter 62 Topics to be Discussed The Technology of Production Production with One Variable Input.
Lecture 10: The Theory of Competitive Supply
Presentation to the Sustainable Prosperity Conference
Chapter 8 Cost McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All Rights Reserved.
1 Privatization  Prices © Allen C. Goodman, 2015.
6 CHAPTER Output and Costs © Pearson Education 2012 After studying this chapter you will be able to:  Distinguish between the short run and the long.
Chapter 7 The Cost of Production. ©2005 Pearson Education, Inc. Chapter 72 Topics to be Discussed Measuring Cost: Which Costs Matter? Cost in the Short.
The Costs of Production Chapter 6. In This Chapter… 6.1. The Production Process 6.2. How Much to Produce? 6.3. The Right Size: Large or Small?
Professor: Keren Mertens Horn Office: Wheatley 5-78B Office Hours: TR 2:30-4:00 pm ECONOMICS OF THE METROPOLITAN AREA 212G,
Chapter 7 The Cost of Production. Chapter 7Slide 2 Topics to be Discussed Measuring Cost: Which Costs Matter? Cost in the Short Run Cost in the Long Run.
11 OUTPUT AND COSTS © 2012 Pearson Addison-Wesley The Firm and Its Economic Problem A firm is an institution that hires factors of production and organizes.
CHAPTER 5 COST OF PRODUCTION. PART 1: SHORT RUN PRODUCTION COST Chapter Summary Types of production cost in short run Apply the short run production cost.
Chapter Seven Costs. © 2009 Pearson Addison-Wesley. All rights reserved. 7-2 Topics  Measuring Costs.  Short-Run Costs.  Long-Run Costs.  Lower Costs.
OUTPUT AND COSTS 10 CHAPTER. Objectives After studying this chapter, you will able to  Distinguish between the short run and the long run  Explain the.
Externalities on highways Today: We apply externalities to a real-life example.
Chapter 8 Cost. Types of Cost Firm’s total cost is the expenditure required to produce a given level of output in the most economical way Variable costs.
Chapter 8 Cost McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All Rights Reserved.
Public Transportation Planning: Rapid transit solutions for adequate mass movement Mobility.
© 2010 Pearson Addison-Wesley CHAPTER 1. © 2010 Pearson Addison-Wesley.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Frequency Determination Unit 5: Staff & Fleet Scheduling.
Briefing for Transportation Finance Panel Nov 23, 2015 Economic Analysis Reports: 1.I-84 Viaduct in Hartford 2.I-84/Rt8 Mixmaster in Waterbury 3.New Haven.
Output and Costs CHAPTER 10. After studying this chapter you will be able to Distinguish between the short run and the long run Explain the relationship.
21-1 The Costs of Production  Before anyone can consume to satisfy wants and needs, goods and services must be produced.  Producers are profit-seeking,
© 2010 Pearson Education Canada Output and Cost ECON103 Microeconomics Cheryl Fu.
8-1 Learning Objectives  Explain general concepts of production and cost analysis  Examine the structure of short-run production based on the relation.
Chapter 12: Urban Transportation Policy “Everything in life is somewhere else, and you get there in a car.” E. B. White, One Man’s Meat, (NY: Harper &
Chapter 11 Mass Transit McGraw-Hill/Irwin
UNIT 6 COSTS AND PRODUCTION: LONG AND SHORT-RUN, TOTAL, FIXED AND VARIABLE COSTS, LAW OF DIMINISHING RETURNS, INCREASING, CONSTANT AND DIMINISHING RETURNS.
Presentation transcript:

Transportation – Costs © Allen C. Goodman 2009

Transportation Consider a roadway of distance d. Services c cars per hour, at speed s. Travel time for the entire highway is d/s. Assume that value of driver time and costs equal k per hour, so that cost per completed trip = kd/s. This is a version of average cost per car.

Costs Cost per completed trip = kd/s Total cost = c*AC = ckd/s Marginal cost = dTC/dc = kd/s - (ckd/s 2 )(ds/dc) MC = AC - (ckd/s 2 )(ds/dc) AC (1 – E sc ), where E sc = Elasticity Since (ds/dc)  0, we have congestion as c .

Fundamental Diagram of Traffic Congestion

Costs MC = AC - (ckd/s 2 )(ds/dc) AC (1 – E sc ), c $ AC - (AC)(E sc ) Let’s look at demand D. Optimal toll = MC - AC = - (ckd/s 2 )(ds/dc) = -AC*E sc D Toll Note: In this model, you STILL have congestion, even with the optimal toll..

Economies of Scale If mc 1, economies of scale If mc > ac, then s < 1, diseconomies of scale In LR, almost everything is variable so you are more likely to have s about equal to 1. In SR, with fixed capital, more likely to have economies of scale.

Final and Intermediate Outputs Final outputs = quantity and/or extent of trips taken. Intermediate outputs = vehicle-miles, vehicle-hours, and peak vehicles in service. Environment might include –the length of a corridor, –the area from which it draws patronage, densities of trip origins and destinations, and –possible methods by which passengers can access the system and reach their final destinations.

Cost Functions for Public Transit First, for bus providers, statistical evidence suggests that intermediate outputs such as vehicle-miles are produced with a mildly U-shaped relationship between average cost and output, so that small firms exhibit modest scale economies and large firms modest diseconomies. Second, producing final outputs such as passenger trips is much more likely to entail scale economies. Third, rail systems exhibit much greater variability in scale economies; this is especially true in the short run because their capital stock may be too large or too small for the current operations. Fourth, however, there seems to be a bias toward operating with a larger than optimal capital stock, possibly due to incentives built into capital subsidy programs.

Mohring’s Model w/ Waiting Time Minimize Travel Time + Waiting Time Costs q = # of passengers/peak hour V = vehicles passing bus stop at cost c p. W = waiting time/peak hour at cost a w W  Average headway = ½ * (1/V) So, minimize: Subject to bus capacity n

Optimizing If λ = 0 (buses aren’t full) –Optimal frequency V* is proportional to square root of passenger density q. –Cost function is also proprtional to q ½. If buses ARE full, Over the range of output for which this solution holds, the total cost function is linear in output and has fixed cost CW *. It thus again exhibits density economies s=1+(CW * /CB *.), which are greater, the greater are waiting- time costs compared to operating costs

So So whether or not the constraint is binding, there are economies of density because either operating costs or waiting costs grow less than proportionally as output expands.

Time costs at 50 percent of the wage, or about $9.14/hr for U.S. metropolitan areas in This amounts to $0.286 /mi for a single- occupant automobile moving at 32 mi/hr.

Is highway travel subsidized? Table 3.3 could be used to argue that in the SR, private decision-makers are “subsidized” at the margin by $0.220 per vehicle-mile if they choose to travel by car. Given the capital decisions that have been made with respect to provision of roads and parking spaces, this measures the extent of the distortion in the average incentive facing car users. But more striking is that most of this discrepancy arises from the congestion externality, and most of the rest arises from inter-user externalities connected with accidents. These externalities are well understood to vary greatly by circumstance. So from an efficiency point of view, the table is most useful by pointing to congestion and accidents as two places to look for big savings from more efficient policies. Similarly, looking at long-run policies, we see that parking is supplied at an enormous subsidy to such an extent, in fact, that we deemed the short-run costs of searching for parking spaces too small to bother to quantify for the US. So very likely there are big savings to be reaped from policies that reduce provision of parking spaces, especially if some of the fixed costs can be recovered, for example by converting parking lots to other uses or by arranging for existing parking structures to be shared with nearby new users.

MKW

Three parts of trips Collection Line haul Distribution This is true for ALL transportation, passenger or freight.

Intermodal Cost Comparisons All results are for a ten-mile limited-access line-haul facility (auto-only expressway, exclusive busway, or rapid-rail line), combined with a two-mile downtown distribution route. Bus service is integrated, meaning that collection, line haul, and distribution is all done by a single vehicle. Downtown distribution for rail and for one of the bus systems is accomplished using exclusive underground right of way; for the other bus system and for auto, it is accomplished using city streets.

ICC (2) Costs for all transit modes decline as a function of hourly passenger volume along the corridor, reflecting scale economies in vehicle size. At the lowest volumes, automobile travel is cheapest. At somewhat higher volumes (above approximately 5,000 passengers per hour in this example), the bus becomes more economical. At still higher volumes, rail transit may become the cheapest, although not for this particular set of parameters.

Kain (1999) construction costs

Why is rail so costly? The biggest cost factor accounting for these differences is the capital cost of the infrastructure. Kain (1999) focuses on this item, comparing more recent evidence for four types of express transit in North American cities: rapid rail, light rail, bus on exclusive busway, and bus on shared carpool lanes. Some of his results are shown in Table 3.5. It is evident that at the ridership levels achieved by these systems, both heavy and light rail are many times more expensive than express bus, even before accounting for their higher operating costs. Comparisons such as these have led to widespread skepticism among economists toward new rail systems. The evidence is very strong that in all but very dense cities, equivalent transportation can be provided far more cheaply by a good bus system, using exclusive right of way where necessary to bypass congestion. There is also strong evidence, as noted earlier, that many rail systems in the US have been approved based upon misleading projections of their costs and ability to attract riders.

What happens to highway investment when pricing isn’t optimal? Let U = U (z, x, Tx)(1) z = other expenditure x = travel Tx = time devoted to travel; T = time/hour U 1 > 0, U 2 > 0, U 3 < 0. Budget constraint: y = h + z + px (2) h is a lump sum tax to finance road construction, so: L = U (z, x, Tx) + (y - h - z- px) *Wheaton, BJE (1978)

Wheaton’s Congestion Model L = U (z, x, Tx) + (y - h - z- px) In eq’m: U 2 /U 1 = (-U 3 /U 1 ) T + p. Then: x = x (y - h, T, p). We can show that:  x/  T = -(U 3 /U 1 )  x/  p = v  x/  p, where v = -U 3 /U 1. v = valuation of commuting time.

Road capacity s  travel time function: T (x, nx)  0  T/  s < 0  2 T/  s 2 > 0  t/  nx > 0  2 T/  (nx) 2 > 0.  2 T/  nx  s < 0. For congestion, assume that travel time T depends only on ratio of volume nx to capacity s, or T = T (nx/s) = T [n(x/s)] Yields:  T/  s = -(  T/  x) (x/s).  T/(  s/s) = -[  T/(  x/x) ].

Finally, assume that: (dx/ds)(s/x) <1. 1%  in s  less than 1%  in travel x. Society’s optimum? Optimize: U{z(h, p, s), x (h, p, s), x(h, p, s) T [s, ns (h, p, s)]}(9) with respect to s. Balanced budget constraint: nh + npx = s(10) h + px - s/n = 0.

Optimize: U{z(h, p, s), x (h, p, s), x(h, p, s) T [s, ns (h, p, s)]}(9) with respect to s. Balanced budget constraint: nh + npx = s(10) h + px - s/n = 0. With p given, we get: -nxv  T/  s + (dx/ds) (np - nxv  T/  x) = 1. If we optimize with respect to s and p, we get: p = xv  T/  x  -nxv  T/  s = 1.

Mgl benefitMgl cost s $ 1 Weighted difference between price and social costs

Optimum construction With p given, we get: -nxv T/  s +(dx/ds) (np - nxv  T/  x) = 1. If we optimize with respect to s and p, we get: p = xv  t/  x  -nxv  T/  s = 1. Solutions will be same ONLY if: We pick exactly the right price or Demand is completely insensitive to investment p* capacity s p s first best s second best

Optimum construction If p < p*, s f leads to too much s. s s calls for a relative reduction in investment. This will  congestion,  “price,” thus  demand that has been artificially induced by under-pricing p* capacity s p s first best s second best popo soso We have had user fees but they certainly can’t be characterized as optimal.