Multi-OTR Project meeting C. Alabau Pons J. Alabau Gonzalvo C. Blanch J.V. Civera A.Faus-Golfe J.J. Garcia Garrigos (IFIC-Valencia)

Slides:



Advertisements
Similar presentations
1 Accelerator R&D for Future Large Colliders at IFIC Scientific Staff: A. Faus-Golfe, C. Alabau, J.J. García, S. Verdu, J. Alabau Technical Staff: J.V.
Advertisements

Experience of the Spanish collaboration with TBL F. Toral on behalf of the Spanish Collaboration with TBL CERN, CTF3 Collaboration Technical Meeting, 6/5/2010.
Emittance Measurement Simulations in the ATF Extraction Line Anthony Scarfe The Cockcroft Institute.
PARTICIPATION IN THE DESIGN AND R&D ACTIVITIES FOR A FUTURE LINEAR COLLIDER: A. Faus-Golfe IFIC - Valencia Accelerator and Detector aspects FPA
45 th ICFA Beam Dynamic Workshop June 8–12, 2009, Cornell University, Ithaca New York ECLOUD Simulations for the Tune Shift Measurements of December.
January 15, 2005D. Rubin - Cornell1 CESR-c Status -Operations/Luminosity December/January vs September/October -Machine studies and instrumentation -Simulation.
Words & Definitions By: Naftaly Garcia Birruete. Address Bar  The space provided on a web browser that shows the addresses of websites.
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
-brief report of October runs and some inputs for the Nov/Dec planning – Nobuhiro Terunuma, KEK, ATF ATF session on LCWS13, Tokyo Univ., Nov. 13, 2013.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
Discussion on Milestone and schedule Toshiyuki Okugi ATF2 commissioning meeting 1 / 7 / 2009.
1 Proposal for a Multi-Optical Transition Radiation System in ATF2 A. Faus-Golfe, D. McCormick IFIC – SLAC 11 June th TB/SGC Meeting.
ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group 5th ATF2 project meeting, KEK December 19-21, 2007.
Personal strategy for ATF2 beam operation in 2009 Toshiyuki OKUGI 2009 / 7 /22 ATF2 weekly meeting.
ATF2 commissioning in Autumn 2009 for discussion Philip Bambade LAL & KEK LCWS09 BDS session Albuquerque, New Mexico October 1, 2009 on behalf of the commissioning.
UK/EU Plans for ATF2 G.A. Blair ATF2-IN2P3-KEK kick-0ff meeting, Annecy, 8 th October 2006 Overview EUROTeV UK.
Technical Board ATF2 GM FF progress report A.Jeremie ATF2 GM System team: K.Artoos, C.Charrondière, A.Jeremie, J.Pfingstner (a lot of figures from him),
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
1 LAPP in ATF2 Extraced from ANR bid A.Jeremie. 2 LAPP in ATF2 Current activities related to accelerators: The LAPP-Annecy team is currently developing.
Progress report on multi-OTR fabrication and schedule IFIC-SLAC  Design and Hardware fabrication  Realistic Optics and Beam Dynamics simulations  Controls.
WP: Parameters and design. Plans from IFIC, Valencia Javier Resta López on behalf of the IFIC accelerator group ( IFIC (CSIC-UV),
Summary of Commissioning and Tuning session Philip Bambade LAL-Orsay 5 th ATF2 project meeting KEK, 21 December 2007.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
ATF DR Overview Introduction Low emittance history Present status S.Kuroda ( KEK ) GDE Review 3rd Apr.2013.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
Mark Woodley, SLACATF2 Project March 20-21, Summary of Tuning, Corrections, and Commissioning.
Proposal of Halo collimation system for ATF2 A.Faus-Golfe, N. Fuster-Martínez J. Resta-López (IFIC) P. Bambade, S. Liu, S. Wallon (LAL) 113/02/1417th ATF2.
1 Accelerator R&D for Future Linear Colliders at IFIC Scientific Staff: A. Faus-Golfe, C. Alabau, J.J. García, S. Verdu, J. Alabau Technical Staff: J.V.
8 th Meeting of the ATF TB/SGC 11 June Hardware Status Fast Kicker – FID pulsers have had a reliability problem: this appears to have been solved.
1 Multi-Optical Transition Radiation System for ATF2 A.Faus-Golfe, J.Alabau, C.Blanch, J.V.Civera, J.J.García Garrigós IFIC (CSIC-UV) D.McCormick, G.White,
R&D for Future Accelerators at IFIC Scientific Staff: A. Faus-Golfe, C. Alabau, J.J. García, S. Verdu, J. Alabau Technical Staff: J.V. Civera, C. Blanch.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
Greeting for 10 th ATF2 project and TB/SGC joint meeting 1.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
Initial beam size commissioning for ATF2 T.Okugi 3rd ATF2 Project Meeting, KEK 12/ 19/ 2006.
IP instrumentation configuration for Autumn 2010 ATF2 runs Toshiyuki OKUGI, KEK 2010 / 7/ 1 10 th ATF2 project meeting.
Multi-OTR Status A.Faus-Golfe, J.Alabau, C.Blanch, J.V.Civera, J.J.García Garrigós IFIC (CSIC-UV) D.McCormick, G.White, J. Cruz SLAC aand KEK team.
J. Brossard, C. Rimbault a P. Bambade LAL / / 8-9 nov LAL 1 Exercising emittance measurements in the ATF EXT line Upgrade.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
ATF2 Software Review LAL June SHORT SUMMARY - Philip Bambade ATF2 weekly meeting July
Upcoming Shift Work at ATF (November 26 – December 21, 2007) and Remote Participation from SLAC ATF training shifts proposal Rob Appleby (contact person,
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
CALIBRATIONS IPBPM FILTER TESTS Siwon Jang Hoyeong Jeong Glenn Christian Talitha Bromwich Friday, 1 May Talitha Bromwich, FONT Group Meeting.
ATF2 Software Review LAL June 2008 Philip Bambade & Glen White ATF2 weekly meeting June
A. Faus-Golfe, J.V. Civera, C. Blanch and J.J. García-Garrigós whit the help of the CTF3 Collaboration 1 CTF3 meeting Jan-09.
Accelerator Activities at Spain Madrid CIEMA T CMAM Valencia IFIC Bilbao ESS Barcelona ALBA UPC Sevilla CNA 1 PAC-ILC May 2010.
Simulation of the α, dispersion, coupling and β multiknobs in large β optics Sha Bai, Philip Bambade, Benoit Bolzon, Javier Resta Lopez
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
1 1 H. Hayano and ATF group ATF Status August/2004 H. Hayano and ATF group Multibunch emittance Instrumentation developments Plans for run Multibunch.
 Accelerator Simulation P. Spentzouris Accelerator activity coordination meeting 03 Aug '04.
IFIC Accelerators Team (GAP) J. Alabau Gonzalvo C. Belver Aguilar C. Blanch Gutiérrez J.V. Civera Navarrete A. Faus Golfe J.J. García Garrigós S. Verdú.
Design for a New Optical Table of the Shintake Monitor Takashi Yamanaka The University of Tokyo ATF2 weekly meeting 2007/9/26.
2nd ATF2 Project Meeting (May 30, 2006)M. Woodley [SLAC]1 ATF2 Layout/Optics (v3.3) nBPM (SLAC) nBPM (KEK) FONT Compton / laserwire ODR Existing ATF Extraction.
Technical Board Summary Preliminary Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 project meeting, Technical.
ATF2 Software tasks: - EXT Bunch-Bunch FB - IP Bunch-Bunch FB - FB Integration Status and plans Javier Resta-Lopez JAI, Oxford University ATF2 commissioning.
ATF2 Status and Plans CLIC January 2016.
1 Updated comparison of feedback implementation for e + e - and e - e - modes of operation with realistic errors in the BDS M. Alabau Pons, P. Bambade,
Oleksiy Dolinskyy December 1st, 2014
ICE SECTION The coolest place to be! Elias Métral
Expected hardware status and Priority of the commissioning task
Estimating the effects from non-linearities in the ATF extraction line
Transverse Beam Jitter Propagation in Multi-bunch Operation at ATF2
Baby MIND beam test status
ATF2 IP Tuning Task Simulation Updates
UPDATE ON DYNAMIC APERTURE SIMULATIONS
Accelerators R&D at IFIC “Reunión de Electrónicos”, May 2010
ATF ICB meeting, LCWS08, UIC, Chicago, 11/18/2008
Feed forward orbit corrections for the CLIC RTML
Studies for TBT optics measurements in the PSB
I ;J\;J\ _\_\ -
Presentation transcript:

Multi-OTR Project meeting C. Alabau Pons J. Alabau Gonzalvo C. Blanch J.V. Civera A.Faus-Golfe J.J. Garcia Garrigos (IFIC-Valencia)

Simulation and software Tasks  Realistic Optics and Beam Dynamics Simulations for ATF2 EXT line:  study of the possible locations (space, better optics conditions..)  tracking studies (the model should be completed adding all possible machine imperfections) (synergies with the FONT collaboration)  comparison with the multi-wire scanner results  Software developments for the control of the multi-OTR system (movers..) (synergies with the FONT collaboration)  Software developments for the calibration and measurements routine

FONT Movers Horizontal mover Vertical mover

Possible IFIC Tasks  Mechanical design and construction (C. Blanch, J.V. Civera)  Associated Electronics (J.J. Garcia Garrigos)  Realistic Simulation (J. Alabau, C. Alabau, A. Faus-Golfe)  Software developments (J. Alabau, J.J Garcia Garrigos)  Installation and commissioning