Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair.

Slides:



Advertisements
Similar presentations
1.03 Demonstrate desktop publishing.
Advertisements

Bad News Bots E2 Ryan Bove Kara Collins Peter Courtney Kyle O’Reilly Benjamin Rowland Concept Design Review.
Robo-FootballE2 Project Design Review 1 - 1/31/2008 Ryan Bove Kara Collins Peter Courtney Kyle O’Reilly Benjamin Rowland.
Preliminary Design Review Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Tuesday March 25, 2008.
Preliminary Design Review HMS Bloodhound Matt Morris, Matt Prygoski, Jay Slaggert Fred Thwaites, Dan Zibton.
Final Report Document. Format Title Page Executive Summary Table of Contents Introduction Mission Statement Main PDS items Brief justification of the.
Robotic Football Group E1 CDR Team Top Gun April 22 nd, 2008.
Bad News Bots E2 Project Design Review 6 - 2/21/2008 Ryan Bove Kara Collins Peter Courtney Kyle O’Reilly Benjamin Rowland.
Bad News Bots E2 Project Design Review 8 – 4/3/2008 Ryan Bove Kara Collins Peter Courtney Kyle O’Reilly Benjamin Rowland.
John Wloch Wind-Aid Preliminary Design Review 26 February 2008 Andy CrutchfieldJames Gates Keri MacaulayDavid Rupp.
Preliminary Design Review Week 6 Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Thursday March 13, 2008.
Interactive Xylophonic Keyboard Mini-Mozarts October 12, 2006 Gordon Farmer Michael Johnson Eric Laumann Bryan Marek Philip Moss.
John Wloch Wind-Aid Preliminary Design Review 8 April 2008 Andy CrutchfieldJames Gates Keri Macaulay David Rupp.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
John Wloch Wind-Aid Preliminary Design Review 1 April 2008 Andy CrutchfieldJames Gates Keri Macaulay David Rupp.
AME Senior Design Group E3: Hewlett-Packers January 29, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
Preliminary Design Review Week 7 Group A3: HMS “Bloodhound” Matt Prygoski Matt Morris Jay Slaggert Fred Thwaites Dan Zibton Thursday March 20, 2008.
PDR: 4/10/08 Pinwheel Technologies (C3) Heather Blaha Matt Fuxa Joey King Michael McConnell Domenic Tassoni.
Project Life Cycle Jon Ivins DMU. Introduction n Projects consist of many separate components n Constraints include: time, costs, staff, equipment n Assets.
AME Senior Design Group E3: Hewlett-Packers February 19, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair.
Preliminary Design Review Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Thursday, April 3, 2008.
AME Senior Design Group E3: Hewlett-Packers February 26, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
Complete and Present Prototype Project 6 Status report: Tuesday, October 5 th Due: Saturday, October 9 th Presentation: Tuesday, October 12 th.
BCI CONTROL OF A ROBOTIC ARM BY PAUL VANDADI & HARDIK SHAH.
AME Senior Design Group E3: Hewlett-Packers March 11, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
Laser Shoot-Out Game By Steven Noto and Laura Miller Advisor Steven Gutschlag February 15, 2000 Senior Project Status.
Bad News Bots E2 Project Design Review 2 - 2/7/2008 Ryan Bove Kara Collins Peter Courtney Kyle O’Reilly Benjamin Rowland.
Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair.
Common Page Design. Graphics and Tables Uses: Objects Numbers Concepts Words.
Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair.
Development of a Laboratory Kit for Robotics Engineering Education Gregory S. Fischer, William R. Michalson, Taskin Padir, Gary Pollice Worcester Polytechnic.
Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair.
Design Design Circuit diagrams were created by researching effective circuits from various sources. Multisim virtual circuit modeling software was used.
Status Report #3 Bluetooth Tracking System Simoo Sipili Ionatana Sipili Anthony Mickens Lizardo Buleje 2/6/2012 Design of an electronic system to track.
Assignment 8 information
Bad News Bots E2 Project Design Review 4 - 2/21/2008 Ryan Bove Kara Collins Peter Courtney Kyle O’Reilly Benjamin Rowland.
1 R.O.M.P Robot Orientation Mapping Project (Project Plan) Team Evolution Peri Subrahmanya: Lead Designer Michael Lazar: Project Manager Sean Hogan: Lead.
Holiday Mentors Build Season Discussion December 18, 2006.
Senior Design 1 Team Bull Trout Project: Elevator Navigating Robot Team –Kelly Kofoed –Nate Whitmore –Shane Moser –Zach Uhles University of Portland School.
Distributed Software Development QR Marks The Spot Beta Prototype Vadym Khatsanovskyy, Nicolas Jacquemoud.
AME Senior Design Group E3: Hewlett-Packers March 18, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors.
EE/CS 481 Spring February, 2008 University of Portland School of Engineering Project Black Cap Robotic Prosthetic Arm Team Josh Triska Corban Monger.
Scope Development Component Specification Concept Development Design, Mockup, Engineering Prototyping Production This project timeline template is customizable.
November 13, 2014 ENGR B47 Introduction to Engineering & Design Week #12 Electrical Motors (And Analysis and Technical Writing)
Project Meeting 12 Paul Capelli, Matt Bernstein, Jared Segal.
A UTOMATED Design Team 8 David Martinez Robert Raley James Wilson A DJUSTABLE T ABLE Status Report #5 March 3, 2010.
A UTOMATED Design Team 8 -David Martinez Robert Raley James Wilson A DJUSTABLE T ABLE Status Report # 8 April 14, 2010.
EE/CS 481 Spring February, 2008 University of Portland School of Engineering Project Black Cap Robotic Prosthetic Arm Team Josh Triska Corban Monger.
Preliminary Design Review Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Thursday, April 10, 2008.
AME Senior Design Group E3: Hewlett-Packers February 7, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
Gigabit Ethernet PMD Opto-Link, Inc. – Status Report 7 Andrew Meyerson March 24, 2005.
APRIL 10, Meeting Agenda  Prototype 2 Goals  Robust Connections Demo  System Diagnostics Tool Demo  Final Prototype Risk Mitigation  Final.
APRIL 10, Meeting Agenda  Prototype 2 Goals  Robust Connections Demo  System Diagnostics Tool Demo  Final Prototype Risk Mitigation  Final.
AME Senior Design Group E3: Hewlett-Packers (Robo-football Quarterback) March 27, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
Unit 1 – Introduction to VEX Robotics Unit 1 - Introduction to VEX Robotics Lesson 6 – Creating the Final VEX Robot.
Review of Definitions Software life cycle: –Set of activities and their relationships to each other to support the development of a software system Software.
Bad News Bots E2 Project Design Review 7 - 3/20/2008 Ryan Bove Kara Collins Peter Courtney Kyle O’Reilly Benjamin Rowland.
My diary Nancy Laverde. Day 1  Introduction This day was super, on Monday i always wake up at 4.00 but today i wake up at 8am, i am on vacation  Body.
BUS 611 Week 4 Assignment Integrated Project Management To purchase this material link
Robot Control Through 3-D Application
Prototyping SoC-based Gate Drive Logic for Power Convertors by Generating code from Simulink models. Researchers Rounak Siddaiah, Graduate Student-University.
Delta Shell Technical Aspects
Community College of Aurora Cheez Botics
2.03 Demonstrate desktop publishing.
Presentation transcript:

Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair

Introduction Our Focus: – Prototype both a quarterback and a receiver in order to complete an offensive passing play. Today’s Discussion: – Prototype construction – Programming – Documentation

Previous Week’s Action Items Item 1: Complete Design Documentation – Complete and proofread each deliverable. – Upload to website. – Tie up loose ends on website.

Previous Week’s Action Items

Item 2: Integrate Program Components – Combined components into one main program for the quarterback robot. – Designed code structure for receiver main program

Previous Week’s Action Items

SHOWSTOPPERS!!! Throwing Arm Motor Malfunction – New Motor is Ordered and has been Shipped – Program is adaptable Positively, last week’s showstopper has been fixed

Current Status of Concept Status of the Design – Finalizing Prototype Construction – Testing Prototype Performance

Current Graphic

Next Week’s Action Items Complete Finished Prototypes – Integrate master receiver program – Install finalized circuits in robot bodies – Replace Throwing arm motor – Final body construction Switches, Interrupt – TESTING

Conclusion Important Points: – A lot to do, 6 days left – Demonstrate Prototypes Next Tuesday

Questions? Any questions?