(c) 2001 Contemporary Engineering Economics 1 Chapter 17 Economic Analysis in the Public Sector Framework of Benefit- Cost Analysis Valuation of Benefits.

Slides:



Advertisements
Similar presentations
Incremental Analysis Lecture No. 21 Professor C. S. Park
Advertisements

Contemporary Engineering Economics, 4 th edition, © 2007 Incremental Analysis Lecture No. 28 Chapter 7 Contemporary Engineering Economics Copyright © 2006.
Cost-Benefit Analysis
Asst. Prof. Dr. Mahmut Ali GÖKÇE, Izmir University of Economics Spring, 2007 (c) 2001 Contemporary Engineering Economics 1 Benefit-Cost.
Chapter 9 Net Present Value and Other Investment Criteria
Exam 4 Practice Problems Douglas Rittmann, Ph.D., P.E.
Engineering Economics in Canada Chapter 10 Public Sector Decision Making.
Contemporary Engineering Economics, 4 th edition, © 2007 Effects of Inflation on Project Cash Flows Lecture No. 45 Chapter 11 Contemporary Engineering.
Unit 3 (cont.): Economic Analysis— Cost-Benefit Analysis 2.
T9.1 Chapter Outline Chapter 9 Net Present Value and Other Investment Criteria Chapter Organization 9.1Net Present Value 9.2The Payback Rule 9.3The Discounted.
Capital Budgeting (I): Different Approaches (Ch 9) Net Present Value The Payback Rule The Discounted Payback The Average Accounting Return The Internal.
(c) 2001 Contemporary Engineering Economics 1 Chapter 9 Rate of Return Analysis Rate of Return Methods for Finding ROR Internal Rate of Return (IRR) Criterion.
1 By Assoc. Prof. Dr. Ahmet ÖZTAŞ Gaziantep University Department of Civil Engineering CE ECONOMIC DECISION ANALYSIS IN CONSTRUCTION CHP 7 -Benefit/Cost.
(c) 2001 Contemporary Engineering Economics 1 Chapter 17 Economic Analysis in the Public Sector Framework of Benefit- Cost Analysis Valuation of Benefits.
Contemporary Engineering Economics, 4 th edition, © 2007 Benefit-Cost Ratio Lecture No. 66 Chapter 16 Contemporary Engineering Economics Copyright © 2006.
Chapter 15 Replacement Decisions
VI-Economic Evaluation of Facility Investments 1. Project Life Cycle and Economic Feasibility 2.Basic Concepts of Economic Evaluation 3.Costs and Benefits.
Contemporary Engineering Economics, 4 th edition, © 2007 Discounted Cash Flow Analysis Lecture No.16 Chapter 5 Contemporary Engineering Economics Copyright.
(c) 2001 Contemporary Engineering Economics 1 Chapter 7 Present Worth Analysis Describing Project Cash Flows Initial Project Screening Method Present Worth.
Contemporary Engineering Economics, 4 th edition, © 2007 Comparing Mutually Exclusive Alternatives Lecture No.18 Chapter 5 Contemporary Engineering Economics.
1 Benefit Cost Analysis Typically used for public projects The goal is to determine if benefits exceed costs: Benefit / Cost Ratio > 1 The goal is NOT.
Lecture No. 54 Chapter 16 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
EVALUATING PROJECTS WITH THE BENEFIT / COST RATIO METHOD
Advanced Engineering Economy Contemporary Engineering Economics, 5th edition, © 2010.
Evaluating Projects with Benefit/Cost Ratio Method
Benefit/Cost Analysis Lecture slides to accompany
© 2012 by McGraw-Hill, New York, N.Y All Rights Reserved 9-1 Lecture slides to accompany Engineering Economy 7 th edition Leland Blank Anthony Tarquin.
Contemporary Engineering Economics, 4 th edition, © 2007 Discounted Cash Flow Analysis Lecture No.16 Chapter 5 Contemporary Engineering Economics Copyright.
T9.1 Chapter Outline Chapter 9 Net Present Value and Other Investment Criteria Chapter Organization 9.1Net Present Value 9.2The Payback Rule 9.3The Discounted.
ALI SALMAN1 LECTURE - 11 ASST PROF. ENGR ALI SALMAN ceme.nust.edu.pk DEPARTMENT OF ENGINEERING MANAGEMENT COLLEGE OF E & ME, NUST DEPARTMENT.
Chapter 10: Evaluating Projects with the Benefit-Cost Ratio Method
1 Internal Rate of Return Internal Rate of Return (IRR): The interest rate i* at which NPW = 0 Note: This is the same as finding the roots of a polynomial.
L30: Methods of Handling Project Risk ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer Sciences.
1 Chapter 12 Benefit-Cost Analysis Framework of Benefit- Cost Analysis Evaluation of Benefits and Costs Benefit-Cost Ratios.
Lectures in Engineering Economy Prof. Corrado lo Storto DIEG, Dept. of Economics and Engineering Management School of Engineering, University of Naples.
Comparing Projects Using Time Value of Money
Lecture No. 37 Chapter 11 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Effects of Inflation on Project Cash.
CHAPTER 11 EVALUATING PROJECTS WITH THE BENEFIT / COST RATIO METHOD $$$ $
First step is to identify cash flows as either benefits, disbenefits, or costs Benefits(B)--Advantages to the people Disbenefts--Disadvantages to the people.
Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Benefit Cost Ratio Course Outline 8.
Slide Sets to accompany Blank & Tarquin, Engineering Economy, 6 th Edition, 2005 © 2005 by McGraw-Hill, New York, N.Y All Rights Reserved 9-1 Developed.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Benefit-Cost Ratio Lecture No. 53.
Lecture No. 26 Chapter 7 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition, © 2010.
T9.1 Chapter Outline Chapter 9 Net Present Value and Other Investment Criteria Chapter Organization 9.1Net Present Value 9.2The Payback Rule 9.3The Discounted.
© 2012 by McGraw-Hill All Rights Reserved 9-1 Lecture slides to accompany Engineering Economy 7 th edition Leland Blank Anthony Tarquin Chapter 9 Benefit/Cost.
Capital Budgeting Decide how to invest money so that its value is maximized.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Incremental Analysis Lecture No.
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. 1 Blank & Tarquin: 5th Edition. Ch. 9 Authored by: Dr. Don.
1 Benefit Cost Analysis Typically used for public projects The goal is to determine if benefits exceed costs: Benefit / Cost Ratio > 1 The goal is NOT.
L:21 Incremental Analysis ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer Sciences.
Water Resources Planning and Management Daene C. McKinney Economic Analysis of Alternative Water Plans: 1. Benefit/Cost Analysis.
Lecture No.18 Chapter 5 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition, © 2010.
Engineering Economics ECO 1192 Lecture 6: Cost-Benefit Analysis (CBA) Claude Théoret University of Ottawa.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Comparing Mutually Exclusive Alternatives.
1 Incremental Analysis A technique or approach that can be used with NPW, EAW, and later with IRR and Cost/Benefit to determine if an incremental expenditure.
Chapter 12: Benefit-cost analysis Framework of benefit- cost analysis Valuation of benefits & costs Benefit-cost ratios Incremental B-C analysis.
Economic Analysis in the Public Sector Benefit/Cost Analysis.
Effects of Inflation on Project Cash Flows
Inflation and Its Effects on Project Cash Flows
Benefit Cost Analysis and Public Sector Economics
Chapter 10: Evaluating Projects with the Benefit-Cost Ratio Method
Chapter 10: Evaluating Projects with the Benefit-Cost Ratio Method
Chapter 7 Present Worth Analysis
Contemporary Engineering Economics
Engineering Economic Analysis
Chapter 10: Evaluating Projects with the Benefit-Cost Ratio Method
Capital Budgeting Techniques
OUTLINE Questions? News? New homework due Wednesday
OUTLINE Questions? News? New homework due Wednesday
Presentation transcript:

(c) 2001 Contemporary Engineering Economics 1 Chapter 17 Economic Analysis in the Public Sector Framework of Benefit- Cost Analysis Valuation of Benefits and Costs Benefit-Cost Ratios Analysis of Public Projects Based on Cost-Effectiveness

(c) 2001 Contemporary Engineering Economics 2 Benefit-Cost Analysis Benefit-cost (BC) analysis is decision making tool commonly used to evaluate public projects. In the Benefits-cost analysis determining social benefits of a public activity is more important than costs. Examples of BC analyses: Public transportation systems, Environmental regulations on noise and pollution, Public safety programs, Education and training programs, Public health programs,..

(c) 2001 Contemporary Engineering Economics 3 Framework of Benefit-Cost Analysis 1) Identifying all the users’ benefits and sponsors’ costs of the project. 2) Identifying all the benefits (favorable outcome) and disbenefits (unfavorable outcome) of the project. 3) Identify sponsor’s cost. 4) Quantifying all benefits and disbenefits in dollars to allow comparisons. 5)Determine the equivalent benefits and costs at the base period and use an appropriate interest rate for the project. 6)Accept the project if the equivalent users’ benefits exceed the equivalent sponsors’ costs..

(c) 2001 Contemporary Engineering Economics 4 Benefit-Cost Ratios Alternative way to express the value of a public project is to compare the users’ benefits (B) to sponsors’ cost (C) by taking the ratio B/C. Define the benefit-cost (B/C) ratio, and explain the relationship between the conventional NPW criterion and the B/C ratio.

(c) 2001 Contemporary Engineering Economics 5 Benefit-Cost Ratio Criterion If this BC ratio exceeds 1, the project can be justified

(c) 2001 Contemporary Engineering Economics 6 Definition of Benefit-Cost Ratio b n =Benefit at the end of period n, c n =Expense at the end of period n, A n = b n – c n N = Project life i =Sponsor’s interest rate (discount rate)

(c) 2001 Contemporary Engineering Economics 7 Definition of Benefit-Cost Ratio continue…………….. The sponsor’s cost (C) consist of the capital expenditure (I) and the equivalent annual operating and maintenance costs (C’) accumulated in each successive period. Let’s assume series of initial investment required during the first K periods, while annual operating and maintenance costs accumulate in each period.

(c) 2001 Contemporary Engineering Economics 8 Equivalent capital investment at n = 0 Equivalent annual O&M costs at n = 0 Breakdown of the Sponsor’s Cost

(c) 2001 Contemporary Engineering Economics 9 Example 17.1 B-C Analysis

(c) 2001 Contemporary Engineering Economics 10

(c) 2001 Contemporary Engineering Economics 11 Relationship between B/C Ratio and NPW B > (I + C’) B – (I+ C’) > 0 PW(i) = B – C > 0

(c) 2001 Contemporary Engineering Economics 12 Incremental Analysis Based on B/C(i) To apply incremental analysis, we compute the incremental differences for each term (B,I, and C’) and take the B/C ratio based on these differences. To use the B/C(i) on incremental investment, we may proceed as follows; 1.Eliminate any alternatives with a B/C ratio less than 1. 2.Arrange the remaining alternatives in the increasing order of the denominator (I+C’). Thus, the alternative with the smallest denominator should be the first (j), the alternative with the second smallest (k), and so forth. 3.Compute the incremental differences for each term (B, I, and C’) for the paired alternatives (j, k) in the list.

(c) 2001 Contemporary Engineering Economics 13 Incremental Analysis Based on BC(i)

(c) 2001 Contemporary Engineering Economics 14 Example 17.2 Incremental Benefit-Cost Ratios A1A2A3 I$5,000$20,000$14,000 B12,00035,00021,000 C’C’4,0008,0001,000 PW(i)$3,000$7,000$6,000

(c) 2001 Contemporary Engineering Economics 15 Solution A1A2A3 BC(i) Ranking BaseA1A3A2 I +C’$9,000$15,000$28,000

(c) 2001 Contemporary Engineering Economics 16 Summary Benefit-cost analysis is commonly used to evaluate public projects: Difficulties involved in public project analysis include the following: 1)Identifying all the users who can benefit from the project. 2)Identifying all the benefits and disbenefits of the project. 3)Quantifying all benefits and disbenefits in dollars or some other unit of measure. 4)Selecting an appropriate interest rate at which to discount benefits and costs to a present value.

(c) 2001 Contemporary Engineering Economics 17 The B/C ratio is defined as: The decision rule is if BC(i) > 1, the project is acceptable. The net B/C ratio is defined as The net B/C ratio expresses the net benefit expected per dollar invested. The same decision rule applies as for the B/C ratio.