Shaper Adjustment on AR1FS Board AR1 PRR May 25, 2004 (Measurements on Christopher Panel)

Slides:



Advertisements
Similar presentations
RPC calibration D. Piccolo INFN Napoli. Calibrations Electronic test –Channels check –Strip pattern for trigger check –Threshold test –Synchronization.
Advertisements

Post Run13 MuTR/MuTrig Maintenance 1. Cathode Cable in mis-contact : South Station-1 Oct-5, Gap-2 2.
Directions given for PSpice Schematics. AttributeDescription DELAYThe time delay before the pulses are started. ONTIMEThe length of time that the pulse.
TECHNICAL TRAINING Mini Chiller Panel Controller V2.0.
Analysis for J2 chamber Yousuke Kataoka (University of Tokyo) Atsuhiko Ochi, Yuki Edo (Kobe University) 11 / 12 / 2012 Micromegas weekly meeting 1.
20/Oct./2000 CF IEEE NSS 2000 at Lyon,France 1 An MWPC Readout Chip for High Rate Environment Introduction ASIC Structure & Fabrication ASIC Evaluation.
555 Timer ©Paul Godin Updated February Oscillators ◊We have looked at simple oscillator designs using an inverter, and had a brief look at crystal.
Noun. Noun - verb noun Noun - verb article- adj. - adj. - Noun - verb.
Kuno-Group B4 Yuuki Matsumoto A report for Graduation research Development of Trigger Board for MPPC (for MuSIC experiment) A report for Graduation research.
AR3BL2 Measurements at Penn 3 rd Assembled board November 9 04 FMN.
Plot → Map View Switch to map view to enable color maps, color masks, or contour plots.
1 Plots and LSMEANS by parameter: Original data & Lab Adjusted data Elisa Santos November 7 th, 2005.
Anode Front-End Electronics current status Presented by Nikolay Bondar. Fermilab. 09/08/00.
Problem 17: “Greedy Shapers” T3 T4 CPU2 T1 T2 CPU1 S Stream S1: P = 100 J = 1000 D = 1 Stream S2: P = 10 J = 10 D = 1 Stream S3: P = 10 J = 0 D = 0 Stream.
AR1FS Debugging Guide Critical Components Mitch Newcomer August
1 In last Friday meeting, containment plot had some error.  10T-10E containment using 10T-10E and 10T-10E-20H geometries sho wed inconsistent values.
AR3BS1 #3 November 19, 2004 Mitch and Anton. Measurements DLL Lock works in all positions Timing scan shows expected ranges of BX and DX operation Voltage.
Active Roof Repair Aids1 AR1FS Debugging Guide Critical Components Mitch Newcomer Feb 2005 **Note that this is a work in progress and will be updated from.
Progress Report Pedro Flores. Scintillator Case Set to hold four scintillator panels with instrumentation. Only three panels with instrumentation that.
AR2FL July 22, 2004 Anton, Campion, Mitch. Remaining Issues / Status One AR3FL board was stuffed in April by Godwin has been examined carefully. All locations.
Autocorrelator:.
ATLAS TRT R. Van Berg, Sept. 2, ASDBLR & DTMROC Testing Production Run Completion Rick Van Berg for Gabe Hare, Mike Reilly.
INVENTORY & ORDER PROCESSING
All Rights Reserved Copyright (C) Bee Technologies Inc.2010
Active Boards Grounding and Shielding at Penn Near Term Plan for Barrel Boards –In parallel to board layout verification Study /optimize / map noise with.
Three-Phase AC machines Three-Phase Cage Rotor Induction Motor – Electronic Methods of Starting and Speed Control Resource 4.
David Nelson STAVE Test Electronics July 1, ATLAS STAVE Test Electronics Preliminary V3 Presented by David Nelson.
POWER PLANT USED IN TELECOM
Behavioral Buffer Modeling with HSPICE – Intel Buffer
MiniBoone Detector: Digitization at Feed Through Student: John Odeghe ; SC State, Fermi Lab Intern Supervisor: JinYuan Wu; Fermi Lab 1.
SETUP\Weld\Equip \\\\\\\\\\\JOINT\\10\% 1/17 Welder:Lincoln Electric PowerWave+ArcLnk 1 Process: 1 Wire diameter: [ ] Gas mixture: [ ] Description: [
3-CELL TEST RESULTS & 9-CELL PLAN Howie Pfeffer 11/13/13.
7 Nov 2007Paul Dauncey1 Test results from Imperial Basic tests Source tests Firmware status Jamie Ballin, Paul Dauncey, Anne-Marie Magnan, Matt Noy Imperial.
Review of Proposed Zonal Market Improvements ERCOT Board of Directors Meeting February 17, 2009 Dan L. Jones Potomac Economics Vice President Director,
PSD Chip Calculations. Energy Conversions Erad Energy of incident radiation (MeV) evis Energy of visible photon radiation (eV) εcon Conversion efficiency.
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
Basic Structure Discharge Mechanism Wall Charge Concept Drive of PDP.
Mr. Verlin South Philadelphia High School September 10, 2014.
Sampling chip psTDC_02 Jean-Francois Genat – Herve Grabas Mary Heinz – Eric Oberla 1/27/ psTDC_02 presentation.
M ATRIX P RESENTATION Justin Feimer. T HE W AR ON D RUGS The war on drugs costs us billions annually and does not solve the problem in fact it creates.
Spectrum Slide Quiz Use your data from the lab to determine which slide is which element. The elements used are: argon, hydrogen, mercury, strontium, neon,
Application & Control method for 62000B Series DC Power Supply.
1 Chapter No. 17 Radiation Detection and Measurements, Glenn T. Knoll, Third edition (2000), John Willey. Measurement of Timing Properties.
SRS Calibration Part II: Dynamic Range, Signal/Noise, Pulse Shape and Timing Jitter + initial results from scan of FIT zigzag board Michael Phipps, Bob.
PArISROC Photomultiplier Array Integrated in Sige Read Out Chip Selma Conforti Frédéric Dulucq Christophe de La Taille Gisèle Martin-Chassard Wei
Digitization at Feed Through R&D (2) Digitizer Performance Evaluation Student: John Odeghe ; SC State, Fermi Lab Intern Supervisor: JinYuan Wu; Fermi Lab.
TITLE: 555 Timer OM INSTITUTE OF TECHNOLOGY Subject: Analog Electronics ( ) Semester: 03 Prepared By:
Proposal for the after-pulse effect suppression  Observation of pulses and after-pulses  Shape measurement  Algorithm  Results  Efficiencies for after-pulse.
Rectifier-Capacitor Threshold Tracer for mu2e Straw Chamber Wu, Jinyuan Fermilab Jan
FSC-A Scaling. Area and Height of FSC pulses must be the same. 45°
Plot Diagram.
ADJ 235 Complete Class To purchase this material click below link ADJ-235/ADJ-235-Complete- Class. For more classes visit.
STATUS OF SPIROC measurement
on behalf of the AGH and UJ PANDA groups
2006 NSRS Deployments* * Note: Post PRR650 Implementation (07/01/2006)
From: Circadian and Wake-Dependent Effects on the Pupil Light Reflex in Response to Narrow-Bandwidth Light Pulses Invest. Ophthalmol. Vis. Sci ;53(8):
1.8 Panel Assembly process
EMC Electronics and Trigger Review and Trigger Plan
Pulse Pressure and Resistance Artery Structure in the Elderly
GemBox.Presentation GemBox.Presentation is a.NET component which enables developers to read and write presentation files from.NET applications in a simple.
14BIT 125MHz ADC Board for JPARC-K Status Report Mircea Bogdan August 9, 2007 The University of Chicago.
فصل نهم از کتاب طراحی آموزشی تألیف :آر.ام گانیه
Paul Dauncey, Imperial College London
Dynamic Scheduling Simulations Dana S. Balser & J.J. Condon
VH Prove out tests with data available
Volume 28, Issue 16, Pages e6 (August 2018)
Imperial laser system and analysis
Bell Work: Machine Lab What is the equation to find Input Work? (look at note guide from yesterday) Calculate the input work for your ramp in trial 1.
Beam Beam electronics Block diagram disc gated disc gate disc gated
STUDENT IDEA: Incorporate food recycling bins both on campus and in university owned accommodation 2:2 50 SCORING FOR IDEA New template includes rating.
Presentation transcript:

Shaper Adjustment on AR1FS Board AR1 PRR May 25, 2004 (Measurements on Christopher Panel)

FMN2 Threshold Ramp Xenon = 0 Adj1,2 = 0 TP Delay = 7 TP amp = 5

FMN3 Threshold Ramp Xenon = 1 Adj1,2 = 1 TP Delay = 7 TP amp = 5

FMN4 Internal Test Pulse enabled Time bin 50% efficiency Plots Xenon = 0 Adj1,2 = 0 TP Delay = 7

FMN5 Internal Test Pulse enabled Time bin 50% efficiency Plots Xenon = 1 Adj1,2 = 1 TP Delay = 7

FMN6 Xenon = 0 Adj1,2 = 0 TP Delay = 5

FMN7 Xenon = 0 Adj1,2 = 0 TP Delay = 6

FMN8 Xenon = 0 Adj1,2 = 0 TP Delay = 7

FMN9 Xenon = 0 Adj1,2 = 0 TP Delay = 5

FMN10 Xenon = 0 Adj1,2 = 0 TP Delay = 6

FMN11 Xenon = 0 Adj1,2 = 0 TP Delay = 7

FMN12 Xenon = 1 Adj1,2 = 1 TP Delay = 5

FMN13 Xenon = 1 Adj1,2 = 1 TP Delay = 6

FMN14 Xenon = 1 Adj1,2 = 1 TP Delay = 7

FMN15 Xenon = 1 Adj1,2 = 1 TP Delay = 5

FMN16 Xenon = 1 Adj1,2 = 1 TP Delay = 6

FMN17 Xenon = 1 Adj1,2 = 1 TP Delay = 7