Review of key concepts C15.0008 Corporate Finance Topics Summer 2006.

Slides:



Advertisements
Similar presentations
McGraw-Hill/Irwin Copyright © 2014 by the McGraw-Hill Companies, Inc. All rights reserved.
Advertisements

The Cost of Capital Omar Al Nasser, Ph.D. FIN 6352
Key Concepts & Skills Calculate & explain A firm’s cost of common equity capital A firm’s cost of preferred stock A firm’s cost of debt A firm’s overall.
McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
1 Risk, Return, and Capital Budgeting Chapter 12.
CHAPTER 18: CAPITAL BUDGETING WITH LEVERAGE
Chapter Outline The Cost of Capital: Introduction The Cost of Equity
Goal of the Lecture: Understand how much a business must pay to raise the capital it needs to fund corporate investments.
CHAPTER 13 The Cost of Capital
1 Capital Budgeting Overview  Capital Budgeting is the set of valuation techniques for real asset investment decisions.  Capital Budgeting Steps estimating.
Chapter Outline The Cost of Capital: Introduction The Cost of Equity
CHAPTER 09 Cost of Capital
Objectives Understand the basic concept and sources of capital associated with the cost of capital. Explain what is meant by the marginal cost of capital.
Valuation Chapter 10. Ch 102 Valuation models –Discounted cash-flow –Market-based (multiples) –Residual income Model DCF and risidual income model are.
© 2003 The McGraw-Hill Companies, Inc. All rights reserved. Cost of Capital Chapter Fourteen.
Cost of Capital Minggu 10 Lecture Notes.
Weighted Average Cost of Capital The market value of the firm is the present value of the cash flows generated by the firm’s assets: The cash flows generated.
15-0 Chapter 15: Outline The Cost of Capital: Some Preliminaries The Cost of Equity The Costs of Debt and Preferred Stock The Weighted Average Cost of.
J. K. Dietrich - GSBA 548 – MBA.PM Spring 2007 Risk and Investment Decisions April 23, 2007 (LA), or April 12, 2007 (OCC)
Chapter McGraw-Hill/Irwin Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. 15 Cost of Capital.
Key Concepts and Skills
12.0 Chapter 12 Cost of Capital Key Concepts and Skills Know how to determine a firm’s cost of equity capital Know how to determine a firm’s cost.
Copyright  2004 McGraw-Hill Australia Pty Ltd PPTs t/a Fundamentals of Corporate Finance 3e Ross, Thompson, Christensen, Westerfield and Jordan Slides.
Valuation and levered Betas
CHAPTER 9 The Cost of Capital
Why Cost of Capital Is Important
Weighted Average Cost of Capital
Discounted Cash Flow (DCF) Analysis Tutorial This presentation is to be used ONLY as a template for DCF Analysis presentations. In no way should it reflect.
Discounted Cash Flow (DCF) Tutorial Wednesday, January 31 st, 2007.
1 Cost of Capital Chapter Learning Objectives Learning Objectives  Explain the concept and purpose of determining a firm’s cost of capital.  Identify.
Chapter 14 Cost of Capital
Chapter 14 Cost of Capital 14.1The Cost of Capital: Some Preliminaries 14.2The Cost of Equity 14.3The Costs of Debt and Preferred Stock 14.4The Weighted.
Capital budgeting and the capital asset pricing model “Less is more.” – Mies can der Rohe, Architect.
(c) 2001 Contemporary Engineering Economics1 Discount Rate to be Used in Project Analysis ECON 320 Engineering Economics Mahmut.
Chapter 9 The Cost of Capital.
Risk, Return, and Capital Budgeting (Chapter 12) Financial Policy and Planning (MB 29)
Cost of capital. What types of long-term capital do firms use? Long-term debt Preferred stock Common equity Term loans Retained earnings.
Cost of Capital Chapter 14. Key Concepts and Skills Know how to determine a firm’s cost of equity capital Know how to determine a firm’s cost of debt.
Chapter 13 Equity Valuation 13-1.
© 2004 by Nelson, a division of Thomson Canada Limited Contemporary Financial Management Chapter 8: The Cost of Capital.
Key Concepts and Skills
VALUATION AND FINANCING
Copyright © 2009 Pearson Prentice Hall. All rights reserved. Chapter 10 The Cost of Capital.
Weighted Average Cost of Capital WACC Chapter - 12.
Chapter McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Cost of Capital 11.
CHAPTER 9 The Cost of Capital
Ch 9. The Cost of Capital. Goals: To understand cost of capitals or hurdle rate To understand how to estimate cost components To understand how to estimate.
1. 2 Learning Outcomes Chapter 11 Compute the component cost of capital for (a) debt, (b) preferred stock, (c) retained earnings, and (d) new common equity.
1 CHAPTER 9 The Cost of Capital. 2 Topics in Chapter Cost of capital components Debt Preferred stock Common equity WACC.
1 Capital Budgeting Overview  Capital Budgeting is the set of valuation techniques for real asset investment decisions.  Capital Budgeting Steps estimating.
T14.1 Chapter Outline Chapter 14 Cost of Capital Chapter Organization 14.1The Cost of Capital: Some Preliminaries 14.2The Cost of Equity 14.3The Costs.
9-1 CHAPTER 11 The Cost of Capital Sources of capital Component costs WACC.
Costs of Capital Weighted Average Cost of Capital (WACC)
Copyright © 2003 Pearson Education, Inc. Slide 10-0 Ch 10 Learning Goals 1.Concept of cost of capital 2.Determine the annual percentage cost of individual.
Copyright © 2011 Thomson South-Western, a part of the Thomson Corporation. Thomson, the Star logo, and South-Western are trademarks used herein under license.
1 CHAPTER 10 The Cost of Capital. 2 Topics in Chapter Cost of Capital Components Debt Preferred Common Equity WACC.
Chapter 12 Cost of Capital!. Key Concepts and Skills Know how to determine a firm’s cost of equity capital Know how to determine a firm’s cost of debt.
Amity School Of Business 1 Amity School Of Business BBA Semister four Financial Management-II Ashish Samarpit Noel.
Chapter 9 The Cost of Capital. Copyright ©2014 Pearson Education, Inc. All rights reserved.9-1 Learning Objectives 1.Understand the concepts underlying.
Cost of Capital Chapter 14 Notes to the Instructor:
Chapter McGraw-Hill/Irwin Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. 15 Cost of Capital.
Chapter 14 Cost of Capital McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.
1 The Cost of Capital Corporate Finance Dr. A. DeMaskey.
Chapter 8 The Cost of Capital © 2005 Thomson/South-Western.
Why Cost of Capital? – Overall Cost of Capital of the Firm – Investment Proposal- Accept /Reject – Capital Structure – Yardstick to measure the worth of.
1 CHAPTER 10 The Cost of Capital. 2 Topics in Chapter 10 Individual sources of capital and their cost WACC.
Chapter 11 The Cost of Capital 1. Learning Outcomes Chapter 11  Compute the component cost of capital for (a) debt, (b) preferred stock, (c) retained.
Chapter McGraw-Hill/Irwin Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. 15 Cost of Capital.
1 Managing for Value Creation (Summer 2006). Class #1b Outline Review—Class #1a Lecture—Overview of business valuation Class discussion—Eskimo Pie Corp.
Weighted Average Cost of Capital (Ch )
Presentation transcript:

Review of key concepts C Corporate Finance Topics Summer 2006

What is corporate finance? The study of how firms raise and use money –The objective is to increase corporate wealth –“Corporate wealth” means the wealth of stakeholders who have a say in the control of the firm All corporate financing and investment decisions are wealth maximizing decisions

Basic principles of finance “Financial markets are smart” –Markets aggregate the information available to the multitude of investor that participates in the market. Also called “Market Efficiency” “No Free lunch” – The concept of no- arbitrage –You can’t make money by investing nothing –Assets that pay the same cash-flows have the same price (also called “The law of one price”)

Basic Principles of Finance “A dollar today is worth more than a dollar tomorrow” –Money has time value –Impatience and inflation –Consequently, if you have to wait, you can expect to be paid more. “The risk return tradeoff” – Riskier assets yield higher expected returns. –Caveat: Only “smart” risk is rewarded. Specifically speaking, “smart” risk is sensitivity to market conditions. You don’t make higher returns from dumb gambles.

What you should know: Valuation equation Cash flows Discount rates (cost of capital) The WACC approach

What is a return? A return on an asset is the percentage increase in its value over any given amount of time. It includes any payouts from the asset. The expected return is simply the average percentage expected increase in value over the future Example: A stock is valued at $ 2 today. After a year, you expect it to be valued at $ 3. Return = (Expected future value/ Present value) – 1 = 3/2 – 1 = 50%

Return with payout Go back to our simple example. Assume the dividend on the stock is USD 0.5 in addition to the future expected price. Then return = (Expected future value/Present value) – 1 = (3+0.5)/2 – 1 = 75%

Discounting Discounting is the process of estimating the current value of an asset given a future value and an expected return For 1 year, Present value = Future value/(1+ expected return) For n years, Present value = Future value/(1+ expected return) n

DCF Valuation Equation The natural (and correct) tool for project/investment evaluation is “net present value” (NPV). NPV is defined as the present value of the investment’s cash flows, or alternatively as the sum of the present values of the individual cash flows: NPV is the dollar value of the investment, e.g., a capital budgeting project or financial investment.

Estimating Cash Flows What are the relevant project cash flows? 1) Expected 2) Incremental 3) After-tax 4) Cash flows

Incremental Cash Flows Establish the base case, i.e., what would the cash flows look like without the project. The incremental cash flows are the difference between the cash flows with the project and without the project. Sunk costs—excluded Opportunity costs—included Side effects—included

Discount Rates Capital is expensive because there are always other alternatives for the investment of that capital, e.g., instead of undertaking a project, a firm can always return the capital to investors. The appropriate discount rate is the rate of return that could be earned by investors on an alternative investment of equal risk, i.e., the opportunity cost of capital.

Characteristics of Discount Rates The discount rate increases with the (market) risk of the cash flows Discount rates (opportunity costs of capital) are investment/project specific If all a firm’s projects are of similar risk, then the risk of the firm’s cash flows will be the same as project risk  the right project discount rate is the firm’s cost of capital (WACC)

Cost of Equity: The CAPM E(R) = R F +  [E(R M ) - R F ]  = sensitivity to the market Remember: the “cost” of equity and the expected return on equity are the same. The “cost of equity” to the corporation is the same as the return that an investor requires on it. R F -- the risk-free rate [E(R M ) - R F ] -- the market risk premium  -- the stock’s beta

Estimating the Parameters The risk-free rate – the current Treasury yield (matched horizon) The market risk premium – the historical premium (or current estimate) Stock beta – estimated from historical returns (industry beta if not available)

Equity Betas Stock VolatilityBeta S&P 50010% 1.00 Wal-Mart 17% 0.21 IBM 27% 1.18 Anheuser-Busch 12% 0.36 Boston Beer 33%-0.42 Source for betas:

Cost of Equity: WMT CAPM: E(r) = r F +  [E(r M ) - r F ]  = 0.21 (Friday, June 24 th ) r F = 5.23% (10-year Treasury yield) E(r M ) - r F = 6%  E(r) = 5.23% (4%) = 6.49%

Cost of Debt: WMT MaturityYield 2/15/ % Rating: AA/Aa2 r B = 5.39% r B (1-Tc) = 5.39% (1-0.35) = 3.51% Where Tc is the corporate tax rate Source: NASD TRACE database

Weights Assume: constant capital structure Weights depend on market values of the various sources of financing Book value of debt is often used instead of market value due to data availability Target (average) weights, not the specific source of funds used to finance the project

Financing Mix: WMT Equity market cap as of 23 rd June, 2006: = $199.8 billion Debt value (balance sheet): B = $29 bill. Weights: V = B+S = 228 w B = B/V = 13%w S = S/V = 87%

After-Tax WACC: WMT WACC = w B r B (1-T)+w S r S WACC = 0.13(3.5%) (6.5%)  6.11% The WACC is WMT’s discount rate for average risk projects. These projects only create value (i.e., NPV>0) if they return more than 6.6%

Non-Average Risk Projects WACC is fine for average risk projects, but what if a project is not of average risk, e.g., a multi-division firm? Use project cost of capital (otherwise high risk projects look too good and low risk projects look too bad): 1) Make an ad hoc adjustment 2) Estimate risk from project returns 3) Estimate the WACC via the pure play method

The WACC approach NPV =  t UCF t / (1+r WACC ) t UCF – unlevered (total) cash flows UCF = EBIT(1-T) + depreciation – capex –  nwc r WACC – weighted average cost of capital The WACC approach works at the project level and at the firm level.

Assignments Reading –RWJ: Chapter , 22.8 –Problems: 22.1, 22.2, 22.8 Problem sets –Problem Set 1 due next Wednesday