The Sky’s the Limit: Monitoring the Earth’s Radiation Balance with Active Cavity Radiometers Team 10 Engineering 339 12/6/04.

Slides:



Advertisements
Similar presentations
Track Timer Final Semester Presentation Senior Design I April 19, 2011.
Advertisements

SDP 11 CDR Team Goeckel Group: Adebayo Adeyemi, Joseph Hayward, Mark Kohls, Simon McAuliffe Advisor: Dennis Goeckel CDR Keeping The Secret.
Preliminary Design Presentation CellSync Team 7. Who is Team 7? Phil Overbeeke Keith Conrad Jeffrey Enahoro Andrew Stutzman Matt Gardner Team 7 → Outline.
SDP 11 FPR Team Goeckel Group: Adebayo Adeyemi, Joseph Hayward, Mark Kohls, Simon McAuliffe Advisor: Dennis Goeckel FPR Keeping The Secret.
The Sky’s the Limit: Monitoring the Earth’s Radiation Balance with Active Cavity Radiometers Calvin College Senior Design May 7, 2005 Calvin College Senior.
Kirk Starnes, Andy Lynch, Katie Anderson, Brad Jansen, Jon Larsen Team 13: All for Angkor.
Team 10: The Sky’s the Limit! Design Norms Presentation 21 Feb, 2005 Aaron Buys, John Vander Weide, and Llian Breen Dr. Matthew K. Heun Calvin College,
Team Name Conceptual Design Review Team Members Date Fall 2010 Rev A
Energy Saving Climate Control System (ESCCS) Team: Sean Jacobs, Brad Nissenbaum, Colin Tracy Advisor: Professor Anderson.
Crystal Oscillator Negative Resistance Measurement System
Engineering H193 - Team Project Spring Quarter 2003 P. 1 Performance Test 2 Week 4 Day 3.
Panoramic Rays Conceptual Design Review Brian Gonzales, Kaia Jerde, Harrison McLean, Anirudh Sarsam, Brett Traub, Matt Capron September 20, 2007.
Critical Design Review Nick Hoffmann Miranda Rohlfing Geoff Morgan Miles Buckman Lauren Wenner Rahul Devnani October 17, 2006.
ADVERTISE THIS! Our Product Name: Price: Where to buy it: How to use it and good points:
ECE 477 F INAL P RESENTATION T EAM 10  S PRING 2013 Ruiyang Lin Vipul Bhat Julia Liston Krithika Iyer.
Project: Automated Pool Chemical System 12/07/09 Oral Presentation #2 Engr. 339.
Continuing Embry- Riddle’s CubeSat Satellite Development Program Presented by Clayton G. Jacobs Embry-Riddle Aeronautical University, Prescott EagleSat.
Free Space Optical Communications Senior Design Project Fall 2011 TEAM AWESOME.
INDUSTRY FORUM PROGRESS UPDATE PRESENTATION PRESENTED BY: ALAN MORGAN Technical Committee.
ECE 477 Final Presentation Team 16 − Spring 2013 Scott Stack Neil Kumar Jon Roose John Hubberts.
System issues System decomposition / Product tree System specification: function, performance, interfaces, budget Work-breakdown structure.
Golf Swing Robot EE 486 Project Presentation College of Engineering and Technology Presented by Nasser Almarri.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Treasure Chess ECE 477 Team 2 - Spring 2013 Parul Schroff, Brock Caley, Sidharth Malik, Jeremy Stork Final Presentation Final Packaged Design.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
UT Arlington Summer REU 2013 Dr David Wetz Greg Turner Lateef Taiwo Midterm Report July 16, 2013.
ECE 477 Final Presentation Team 12  Spring 2013 Xirong Ye Zongyang Zhu Chun Ta Huang Libo Dong.
PRJ566 Project Planning and Management Project Management Concepts 1.
[ Rhythm Reloaded ] Team 6 2nd Progress Presentation.
Chapter Title CHAPTER 3 RESEARCH METHODOLOGY Research Methodology This part of the study includes Project Design, Project Development and Operation,
Technological Design © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and Learning™ Technological Design.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 4 Slide 1 Slide 1 Use Case Packets.
Aerospace Digital Communication Instrument Senior Design 1 Presentation.
CS-EE 480 Fall September, 2003 University of Portland School of Engineering Project Brown Trout In-Line Headphone Amplifier Team Casey Hughes Jeff.
CS-EE 481 Spring February, 2005 University of Portland School of Engineering Project Swift Fox Automotive Accelerometer & RPM Monitor Team Andrew.
ECE477 Midterm Design Review: Team #
IANA Stewardship Transition Planning Status John Curran President and CEO.
Track Timer Mid-Semester Presentation Senior Design II October 4, 2011.
Portable Rechargeable Output Power Supply (PROPS) Final Presentation April 24, 2008.
Team 19. Outline Team Introduction Project Overview Challenges Christian Influence Status Questions 2 of 10.
The U.S.S.E Team #4 Antonio Alvarez Janice Cruz Jose L. Gamboa Miguel Rivera Status Report #1 January 26 th, 2009 Description: A follower robot that will.
ECE 477 FINAL PRESENTATION TEAM 6  SPRING OUTLINE  Project overview  Block diagram  Design challenges  Individual contributions  Project demonstration.
Project Title sponsored by: ABC Designs, Inc team members: name 1 name 2 etc.
1 Project Management Software management is distinct and often more difficult from other engineering managements mainly because: – Software product is.
Problem Solving Process Questions Research Development Plan Test Data Collection Refine Solution Deployment Plan.
Chapter 2 Section 2.4A Worksheet. 1. Section 2.4A Worksheet 2.
Progress Report #3. Jesse VanderWees Civil Engineering Hannah van der Vorst Civil Engineering Dalton Veurink Mechanical Engineering Seth Koetje Mechanical.
WEB 237 Week 2 Learning Team Planning, Brainstorming and Outlining Identify the competition, challenges and recommended process to create an eCommerce.
Be Prepared To Have Your Mind Blown….
Team Name Date.
Instructor: Dr. Majid Khan GEIT3351: Software Engineering II
FIEGE INNOVATION CHALLENGE
Incorporating Engineering into Earth Science
Project management.
Clean Air Project: Team Big Green SpaceGasm Conceptual Design Review
Team 1: 32 responses Team 2: 55 responses Team 3: 29 responses
Disaster Recovery Model and Resource Tracking
ECE 477 Final Review: Team #
ECE 477 Final Presentation Team 10  Spring 2008
Hanse 370 Electrics Diagram as fitted by Hanse 2006
Leasing vs. Buying Computers for an Engineering Firm
PPT1: Basics of software engineering
ELEG 3124 Signals and Systems
ECE 477 Design Review Team ??  Fall 2012
LO BOX and LO/CLK DISTRIBUTION Arash Kaftoosian ESS Bilbao, May 2018.
P Navigation Aid for Visually-Impaired/Blind
Problem Statement. : Team Name. :. Team Leader Name. :
Measuring the Temperature and Voltage of a Lithium Ion Battery
Water Services Trust Fund Training Workshop for Field Monitors Role of Field Monitors within the Project Task Team Sheillah Karimi (2009, updated in.
Presentation transcript:

The Sky’s the Limit: Monitoring the Earth’s Radiation Balance with Active Cavity Radiometers Team 10 Engineering /6/04

Team Members Aaron Buys John Vander Weide Llian Breen

Outline Project Review Design Norms Challenges Progress Changes

Proposed Solution Radiation measurement with an ACR VS. SatelliteWeather Balloon

ACR Design – Revised Block Diagram Cavity Earth Thermistor Battery Radiosonde Transmitter ReceiverComputer Heater ControlsSet Point Current and Volt Meter

ACR Design – Section View

Design Norms Stewardship Transparency Cultural Appropriateness

Progress and Changes First prototypes have proved successful Work with Intermet Part Ordering FEA/CAD modeling Shutter progress

Challenges Overcome  Price of certain goods  Controls  Completely new radiosonde interface Ongoing  Software Needs  Aaron and John are geniuses

Questions?