Arnd Meyer (RWTH Aachen) Oct 8, 2003Page 1 Data Taking Status and Plans Achievements Concerns Plans Arnd Meyer, RWTH Aachen D Ø Collaboration Meeting October.

Slides:



Advertisements
Similar presentations
Arnd Meyer (RWTH Aachen) Sep 5, 2003Page 1 Integrated Luminosity Last week: 5 stores (65 hours) 4.78pb -1 (delivered) 3.70pb -1 (recorded) (77.5% eff.)
Advertisements

Clara Gaspar on behalf of the LHCb Collaboration, “Physics at the LHC and Beyond”, Quy Nhon, Vietnam, August 2014 Challenges and lessons learnt LHCb Operations.
CDF Operations Bob Wagner, ANL May 09, 2005 All Experimenters’ Meeting.
CDF CDF Operations Steve Hahn February 7, 2005 All Experimenters ’ Meeting.
The Silicon Track Trigger (STT) at DØ Beauty 2005 in Assisi, June 2005 Sascha Caron for the DØ collaboration Tag beauty fast …
Status of Eric Kajfasz CPPM/Fermilab GDR-Susy, Lyon - 26 novembre 2001.
All DØ Meeting December 1, 2000 Uncle DØ Needs you!!! Commissioning Status & Plans Jae Yu All DØ Meeting Dec. 1, 2000 What have we been doing? What is.
Arnd Meyer (RWTH Aachen) Feb 25, 2004Page 1 Status of Data Taking Arnd Meyer, RWTH Aachen D Ø Collaboration Meeting February 25 th, 2004.
Arnd Meyer (RWTH Aachen) Dec 4 th, 2003Page 1 Tevatron and DØ Status and Plans Arnd Meyer, RWTH Aachen DØ Germany Meeting December 4 th, 2003.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
Tom Kubicki.  Booster HLRF System to be upgraded using 1kW Solid State Driver (SSD) Amplifiers.  Used to drive the 200kW Power Amplifier  Eliminates.
MUID Status: General Detector Health In addition to two disabled HV chains there are four other chains (out of a total of 600) that are largely or totally.
2011 HV scan SF6 flow-meter accident 2011 Results comparison RPC HV efficiency scan Pigi Paolucci on behalf of RPC collaboration.
7 October All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 DØ Summary - Week of 2002 September 30 – October 6 Luminosity & operating.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
February 19th 2009AlbaNova Instrumentation Seminar1 Christian Bohm Instrumentation Physics, SU Upgrading the ATLAS detector Overview Motivation The current.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
L3 Filtering: status and plans D  Computing Review Meeting: 9 th May 2002 Terry Wyatt, on behalf of the L3 Algorithms group. For more details of current.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
FPD Status and Data Quality Andrew Brandt UTA Q4 D S Q3S A1A2 P 1 UP p p Z(m) D1 Detector Bellows Roman Pot P 2 OUT Q2 P 1 DN P 2 IN D2.
P5 recommendation on Tevatron running Report of June 8 meeting FNAL.
Global Monitoring Pushpa Bhat Fermilab Shifter Tutorial Feb. 3, 2003.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
7 Jan 03 CFT+PS Weeks in Review Sequencer status –1553 communications issues may not be fully resolved –scanning still off Calibration –calibration database.
Dmitri Denisov D0 Weekly Summary: August 18 to August 24  Delivered Luminosity and operating efficiency u Delivered 6.9pb -1 u Recorded 6.0pb -1 (87%)
17 February All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 February Dedicated some.
M. Weber, AEM 4/5/041 Weekly report 3/29-4/4 Delivered:7.7pb -1 Recorded:6.3pb -1 (82%) 12.6M events.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
All Experimenters MeetingDmitri Denisov Week of July 16 to July 22 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 1.6pb -1 u Recorded:
PDT’s  Control Board DSP Software (Sten,HH) u Updated so as to include the wire-length in the module data  Readout u All 6 crates in global run. u 90/94.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
Draft of talk to be given in Madrid: CSC Operations Summary Greg Rakness University of California, Los Angeles CMS Run Coordination Workshop CIEMAT, Madrid.
Main priorities for the next years. Where do we stand Muon system in good shape (in my opinion) – Sub-systems hardware quite robust (see later for main.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
MICE CM January 2009Jean-Sébastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM23 o Detector DAQ o Trigger o Online Software o Front End.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
18 March 2002 All Experimenters’ Meeting Alan L. Stone Louisiana Tech University 1 DØ Status: 03/11 – 03/18 Week integrated luminosity –1.1 pb -1 delivered.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 24, 2013.
MINER A Operations Report All Experimenters’ Meeting Steve Hahn, FNAL July 1, 2013.
Arnd Meyer (RWTH Aachen) July 18, 2003Page 1 Data Taking July 11 – 18 Store # BeginLumDuration 2774Thu 15:373.3E hrs 2780Fri 20:403.6E hrsTRF4.
Muon Tracking Meeting SOR issue First priority Diagnostic: MCH DetectorScriptError Arriving at the initialization stage: the whole or part.
FNAL All Experimenters Meeting January 7, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Progress Dec 17, 2001 – Jan 7, 2002  Reasonably.
All Experimenters MeetingDmitri Denisov Week of September 9 to September 16 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 4.0pb.
All Experimenters MeetingDmitri Denisov Week of September 2 to September 8 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.9pb.
FPD STATUS Carlos Avila Uniandes/UTA 1. FPD overview 2. Roman pot and detector status 3. FPD readout integration status 4. Software status 5. Stand-alone.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 1/15 Jeroen van Tilburg (Universität Zürich) LHCb: Preparation for LHC.
FNAL All Experimenters Meeting June 24, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Operations June 17 – 24, 2002  Notable “features”
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
All Experimenters MeetingDmitri Denisov Week of December 23 to December 30 D0 Summary  Delivered luminosity and data taking efficiency u Delivered: 5.8pb.
DØ Beauty Physics in Run II Rick Jesik Imperial College BEACH 2002 V International Conference on Hyperons, Charm and Beauty Hadrons Vancouver, BC, June.
All Experimenters MeetingDmitri Denisov Week of July 22 to July 29 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.1pb -1 u Live:
AEM, Sept Frank Chlebana (Fermilab) Status of the LHC and CMS Frank Chlebana (Fermilab) All Experimenter’s Meeting Sept
TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.
Arnd Meyer (RWTH Aachen) July 21, 2003Page 1 Data Taking July 14 – 20 Day∫L dt (del)∫L dt (rec)Efficiency Mon 956nb nb % Wed 111nb nb.
1 Drift Tubes TC activities up to LS2 1.Implement remaining Phase 1 upgrades :  in USC ⁻ TwinMux ⁻ microROS 2.Refurbish HV & LV Power Supply Systems ⁻
TDAQ and L1Calo and Chamonix (Personal Impressions) 3 Mar2010 Norman Gee.
Arnd Meyer (RWTH Aachen) Aug 1, 2003Page 1 Data Taking July 25 – Aug 1 Store # BeginLum [cm -2 s -1 ]Duration 2817Thu 22:354.0E hrs 2821Sat 1:513.8E31.
5 July 2005T. Yasuda, Fermilab D0 Shift Captain Responsibilities Taka Yasuda Fermilab.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 14, 2013.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
MICE Computing and Software
14 paesi, 62 universita’ e laboratori
The Silicon Track Trigger (STT) at DØ
Presentation transcript:

Arnd Meyer (RWTH Aachen) Oct 8, 2003Page 1 Data Taking Status and Plans Achievements Concerns Plans Arnd Meyer, RWTH Aachen D Ø Collaboration Meeting October 8, 2003

Arnd Meyer (RWTH Aachen) Oct 8, 2003Page 2 Data Taking Status Total data sample on tape with complete detector > 200pb -1

Arnd Meyer (RWTH Aachen) Oct 8, 2003Page 3 Data Taking Status cont. ● Lab reached its goal of delivering 225pb-1 in FY03 Also for DØ: BD delivered ∫L dt = 227.7pb -1 in FY03 26pb -1 per month since May But had to run 6 weeks longer than hoped ● Cuts into our running time next year Startup November 17 – difficult to anticipate rapid startup Six week shutdown next summer / fall ● We do not expect to get significantly more ∫L dt in FY04 than we got this year 25% pbar tax (Recycler commissioning), studies ⇒ pb -1 in FY04 See Dave Mc Ginnis' presentation on Oct 3 ADM FY02 FY03

Arnd Meyer (RWTH Aachen) Oct 8, 2003Page 4 FY 04 Luminosity Profile More (2x/week) and shorter (8 hours) accelerator study periods Studies only if >140 hrs of store time in the previous 14 days Higher delivered luminosity through improved stacking rate Improve stacking rate through shorter pbar production cycle time (2.4sec 1.7sec) 11.3mA/hr (FY03) 18 mA/hr (FY04) ≃ 3 months turn-on after shutdown pessimistic ∫L dt ≃ 233pb-1 design ∫L dt ≃ 328pb-1

Arnd Meyer (RWTH Aachen) Oct 8, 2003Page 5... and Plans / Dreams You are here 3 ⋅ cm -2 s ● STT fully commissioned ● Missing pieces of CTT fully commissioned ● Taking data with rates of 2.5kHz / 1kHz / 50 Hz after L1 / L2 / L3 and 90% average efficiency ● CPS / FPS used in the trigger and for physics ● Most data quality problems are caught online (Global Monitoring et al.) ● 1-2 fewer people on shift ● Taking shifts and improving the detector is not considered a necessary evil ● We have 0.5fb -1 of good data on tape ● Reco takes 1sec/event on my 2-year old desktop

Arnd Meyer (RWTH Aachen) Oct 8, 2003Page 6 Data Taking Efficiency Shutdown Winter '03 Shutdown The Lucky Week Pre-shutdown special runs/ studies

Arnd Meyer (RWTH Aachen) Oct 8, 2003Page 7 Data Taking Efficiency cont. ● Average data taking efficiency for 2003 is 86% ● Current upper limit is ≃ 95% 3-4% global front end busy 1%begin and end store transitions <1%run transitions ● Typically in the upper 80%'s for the last six months Since Beaune, “lost” 83.5 hours of store time (12.6% by time) 12 hours for special runs Largest single failure (4 hrs): low airflow trips of L1CAL on July 27/28. Fan belt replaced. Symptomatic: some of the largest downtimes are one-time occurences Failures by component (without special runs): –SMT: 12 hours –Muon/L1Muon: 12 hours (trips, readout errors/crashes, trigger problems) –CAL: 9 hours (mostly BLS power supplies and hot trigger); + 5 hours L1CAL –CFT/CTT/PS: 5 hours –L3/DAQ/Online: 4 hours Tracking crates readout collaborations' decision: L1A vs. FEB fairly optimized, contiuous effort to keep this low

Arnd Meyer (RWTH Aachen) Oct 8, 2003Page 8 Data Taking Efficiency cont. ● Much of the time running close to our desired efficiency to tape – 90% ● At the same time, data quality improves Number of conditions that causes us to stop data taking (automagically or manually) is continually increasing ● Credit to many (few) dedicated people! ● Last weeks of data taking had large number of special runs, increased number of accelerator studies – still ran over 80% ● Large downtimes are discussed at the weekly operations meeting ● Several systems marginal in terms of expert coverage: one or no resident expert – no manpower for proactive improvements

Arnd Meyer (RWTH Aachen) Oct 8, 2003Page 9 Run II Bests Regularly updated: Best days by data taking efficiency –95.0% on June 22nd; so far 8 days with 93% or better efficiency Best runs and days by recorded luminosity (Aug 10, 488nb -1 ; May 4, 1.68pb -1 ) Best stores by initial DØ luminosity (Aug 10, 4.55 ⋅ cm -2 s -1 )

Arnd Meyer (RWTH Aachen) Oct 8, 2003Page 10 A “Typical” Store Wobbly L1 rates (CAL) Initial Lum. 3.9 ⋅ cm -2 s -1 Store lost (quench) 5-3% L1 Busy Present max. rate guidelines: Level 11.4 kHzFEB < 5%(5-10% headroom to account Level 2800 HzMuon r/o for rate fluctuations) Level 3 50 HzOffline(30% room)

Arnd Meyer (RWTH Aachen) Oct 8, 2003Page 11 Control Room Shifts ● It is a burden on the collaboration to fill that many shifts (and schedule them!) The shifter duty is 7 shifts / 6 months per person on masthead Only about 1 shift per month per person (on average!) ● Calorimeter and Muon shifts consolidated into CalMuon shifts since June Rocky at times, but overall OK Cost of additional training offset by savings in total number of shifts There is more training involved – took some time to be realized by “old” shifters ● Next natural choice for merging is SMT / CFT – will require initiative from detector groups (clear instructions, simplify, automate) ● More than a third of the collaboration have not yet taken a single shift in 2003 ● Request for new DAQ shifters: response was mediocre Have a very good crew currently, but could use more volunteers – we need >26 new DAQ shifters per year. Need one more DAQ shifter this year! I think I am too naïve for this job The fact that we are collecting data with high efficiency is to a large part due to the presence of 5 – 6 well trained people in the control room

Arnd Meyer (RWTH Aachen) Oct 8, 2003Page 12 Data Quality & Global Monitoring ● Online data quality monitoring consists of three (four) parts Significant Event System (“Slow Control”) –Catches an increasing number of hard- and software failures –In many cases pauses the run to ensure consistent data quality –Working very well, could use additional experts guidance DAQ Artificial Intelligence –Notifies shifter of abnormal conditions (global rate fluctuations, BOT trigger rate,...) –Automagically fixes certain problems (SCLinit), e.g. sync. problems in L2 Sub-detector monitoring examines –Many expert-level plots (but experts are not generally on shift) Global Monitoring –Trigger rates, Trigger Examine, Vertex Examine, Physics Examine ● Global Monitoring has great potential, but there are many issues – examples follow

Arnd Meyer (RWTH Aachen) Oct 8, 2003Page 13 –If we can't fill all shifts, need to think about merging with Captain's and other shifters' duties Global Monitoring cont. ● Technical Issues During the transition from trigger list v11 to v12, ran for weeks with wrong/bad reference plots (different triggers, then rapidly changing prescales) PhysEx uses random sample – should be based on certain triggers Low statistics (slow reconstruction) ● Psychological Issues Lack of interaction between detector shifters and GM –GM detects feature in Gtrack phi distribution – SMT shifter cannot correlate with his occupancy plots –Need effort from all detector groups to bring their expertise into GM plots (only Muon group has done this so far) ● Organizational Issues Shifts not being filled (e.g. 8 in August)

Arnd Meyer (RWTH Aachen) Oct 8, 2003Page 14 DQ & GM cont. ● LmTrigger urgently needs improvement For example averaging over different time periods, uncertainties, luminosity dependence of trigger cross sections,... Extremely important tool to identify problems quickly ● Overall, somewhat slow progress (remember Beaune?) ● If we want to continue reducing the number of shifters in the control room, GM needs a major effort (time, people, attention) From the collaboration – great task for groups new to DØ Automation should be the goal Need to catch all major problems online ● Up to one third of the data is thrown away in the analysis stage – sad! Everybody who discards data through “bad” or “good” run lists should make that extra step and think about how to catch the problems earlier!

Arnd Meyer (RWTH Aachen) Oct 8, 2003Page 15 Shutdown Plans & Progress ● In the middle of 10 week shutdown (Sep 8 – Nov 17) 7-8 weeks for experiments, 2-3 additional weeks with limited access ● Four scheduled power outages – recovered well from the first two (and unscheduled outage on Sep 26), two more on October 13 and 18 ● 24x7 DAQ shifts and day shift Captains – thankless task! (“Good God, please, someone, if you see me in the parking lot, run me over. Kill me. I am so bored to death.” - anonymous DAQ shifter) Keep as much as possible of the detector in working order ● Major goals for the shutdown Improve reliability: reduce access time, periods with incomplete detector etc. Improve quality of the data: reduce calorimeter noise, repair Silicon HDI's ● Detector groups together with mechanical and electrical support groups have developed detailed job lists including detector opening and closing, allocation of manpower resources from detector groups and support teams, survey as needed during major moves ● Access went smoothly so far – no accidents, on schedule, great support ● See Friday's talks and parallel sessions for details

Arnd Meyer (RWTH Aachen) Oct 8, 2003Page 16 Silicon Status ● Bias scans (August): measure depletion one layer at a time Use tracks from CFT and other SMT layers to determine cluster charge as a function of HV Runs with HV varied between 0% and 100% in 10% steps SMT in full readout (no sparsification) Average over ladders (statistics) ● Shutdown: Repairs of failed HDI's / electronics Before shutdown: 136 disabled (up from “irreducible” 84 just after Jan shutdown) 12 are repaired (2 weeks of 2 shifts/day with 4 people); ≃ 100 are presently disabled 59 are unstable – study in the coming two weeks. Some recoverable for partial readout ● Cancellation of Silicon replacement means we must plan to operate current detector for the life of the experiment Have to evaluate what steps can be taken to increase chances of the detector's reliable operation long term Current Dose

Arnd Meyer (RWTH Aachen) Oct 8, 2003Page 17 CFT and Preshower ● Maintenance of LVPS's and installing upgraded LVPS (better connectors) – this week ● Maintenance of the VLPC He cooling system ● Modifications of AFE boards to remove unused SVX inputs from the readout Reduce data size and DAQ deadtime Pedestal RMS's across all channels are higher than before the shutdown, under investigation Continue testing AFE modifications over the next week.

Arnd Meyer (RWTH Aachen) Oct 8, 2003Page 18 Calorimeter ● Calorimeter Workshop, plenty of presentations during the week ● Replaced all large cooling fans for preamplifier cooling ● Studies of calorimeter noise – access priority given to “noise task force” Controlled power-up after power outages Investigating how SMT noise gets into the Calorimeter Source of 10MHz noise –Went around with a small antenna to identify sources Grounding test planned for October 13 –Detailed plan in place –Disconnect AC, safety ground, telephone, etc. –Attach current controlled power supply, slowly increase current up to 100A, and look for heat sources Preliminary findings this week, final report later

Arnd Meyer (RWTH Aachen) Oct 8, 2003Page 19 Muons, Lumi, FPD ● Forward Muon First-time access to A layer forward muon tracker (8-12 hours for opening+closing) completed: replacement of preamplifiers, gas leaks, gas monitors; C layer repairs in progress Number of non-working channels now 0.15% (trigger counters), 0.5% (drift tubes) ● Central Muon Installation of extra trigger counters under way – running into a few snags (tight clearance on east side) but no show-stoppers Installation of 144 remote power cycle relays for front-end electronics and all relevant cabling – on schedule, first driver board tested Pulled a couple of wires drawing moderate to high currents for investigation Installed Power PC's in the remaining muon readout crates that had 68k's ● Luminosity system – Cable work in the gaps last Thursday. Come out of the shutdown with complete readout electronics ● Forward proton detector – Maintenance and installation of electronics for full system operation on schedule. Waiting for parts

Arnd Meyer (RWTH Aachen) Oct 8, 2003Page 20 Trigger, DAQ, Online, General ● Firmware upgrades on L1CTT and L1Muon, maintenance on L1CAL: progressing well ● All Level 2 Alphas have been replaced with Betas! Running smoothly so far, updated shifter instructions Now progressing on “worker” and “administrator” code to run with 2 Betas per crate ● Online & Controls Replaced 8 disks that have died over the last 2 years (4 disks for the data logger) Offline switch upgrade planned for Oct 13 – required electrical work means extended downtime for all online systems as well Major online software upgrades this week – Python, Epics, VxWorks ● Still some downtimes ahead for TFW (new TCC etc.) and Online (IP shuffling etc.) upgrades/maintenance ● General detector maintenance – Air handlers, hydraulic systems, vacuum jackets, cooling water systems, ODH heads, etc. ● Old Cryo UPS replaced – Switched to commercial power source last Tuesday, then to new UPS on Thursday

Arnd Meyer (RWTH Aachen) Oct 8, 2003Page 21 Conclusions ● Detector is running well (better than some people want to make us believe) DØ was in good shape for physics data taking until the last store Dmitri, detector group leaders and crews, support groups, daily operations have been doing a great job in operating the detector and have done a lot of planning for a successful shutdown Data taking efficiency 86% for the year – “physics analysis efficiency”?? 214pb -1 integrated luminosity on hands with full detector in readout Progress in online data quality monitoring not as good as hoped for ● Shutdown progressing well and on schedule A lot of work scheduled Brace yourself for 2 more power outages: Oct 13 (½ hour) and Oct 18 (8 hours) ● Bring the detector back into shape by the end of October Assume access ends on November 17th, close detector the week before Plan to finish all major jobs in 7 weeks, only limited access during weeks 7 – 10